Category : Correspondence(303)
-
2001-08-28
EXH AR017854: Phone Message and Handwritten Notes — Letter from Board, Hearing March 18-29 2002
Exhibit AR017854 from Hellwig exhibit collection (Exhibit No. 103, dated 1-8-02, M. Green). Phone message slip dated 8/28 at 2:50 from Joan Mpichoro (or similar) to Ray, noting a letter from the Board setting a hearing for March 18-29, 2002, with a please-call-back request. Accompanying handwritten notes dated 8-27-01 cover questions and ideas including: 4POS -
2001-05-01
Exhibit 2211: Email from Scott Bender to Katie Walter Regarding Hydrologic Impacts to Wetland 39
Email dated 5/1/01 from Scott Bender to Katie Walter transmitting an attached memo describing Bender’s opinions about hydrologic impacts to Wetland 39. AR 034818, ECY00021952, Exhibit-2211. Document relates to Ecology environmental review processes involving wetland hydrology assessment. -
2001-03-01
Truth in Aviation: The newsletter of the Regional Commission on Airport Affairs, Vol. 6, No. 4, Spring 2001
A 2001 community newsletter documenting widespread opposition to Sea-Tac Airport's proposed third runway construction, which required destroying 18 acres of wetlands. Residents, local elected officials, and independent experts raised serious concerns about earthquake safety, environmental damage to local streams and salmon habitat, and the structural integrity of four unprecedented earthen retaining walls planned for the project. The Port of Seattle's applications were repeatedly challenged and withdrawn due to fatal flaws in environmental planning and seismic risk analysis. -
2000-09-27
EXH AR017924: Internal Email Chain — Dinsmore Draft 401 Denial Letter and Withdrawal Letter Review
Internal email chain dated September 27, 2000, among Washington State Department of Ecology staff Tom Luster, Raymond Hellwig, Joan Marchioro (ATG), Kevin Fitzpatrick, and Erik Stockdale, forwarded to Gordon White, marked ‘Attorney Client Privileged’ and ‘Deliberative Document.’ Concerns the Dinsmore project draft 401 certification denial letter and withdrawal letter (AR017924–017926). Luster raises concerns that the -
2000-09-26
EXH AR023557: Water Resources Consulting to Ecology — Des Moines Creek Flow Augmentation Facility
A September 26, 2000 letter from Water Resources Consulting L.L.C. to the Washington State Department of Ecology critiques the Port of Seattle's plans to augment water flow in Des Moines Creek, a project related to Sea-Tac Airport operations. The letter identifies several serious flaws in the proposal, including the lack of a secured water source, concerns about water temperature and fluoride toxicity to fish, and a maintenance-intensive design prone to failure. The author concludes that the Port's 'preliminary design' does not provide reasonable assurance that water quality standards will be met. -
2000-04-27
Exhibit 109: Ecology Letter to Northwest Hydraulic Consultants Re: Port Of Seattle Low Streamflow Analysis Review
Letter dated April 27, 2000 from Ann E. Kenny, Senior Permit Specialist, Washington State Department of Ecology (Northwest Regional Office), to William A. Rozeboom and K. Malcom Leytham of Northwest Hydraulic Consultants, Inc. Responds to their April 11, 2001 letter to Gordon White concerning Ecology’s review of Port Of Seattle’s December 2000 Low Streamflow Analysis. -
2000-02-25
Letter to U.S. Senators Gorton and Murray Regarding Sea-Tac Airport Safety Issues
In February 2000, the Regional Commission on Airport Affairs (RCAA) wrote to U.S. Senators Patty Murray and Slade Gorton urging an investigation into aviation safety concerns at Sea-Tac Airport, following a KIRO-TV news report that revealed hundreds of unreported near-misses, runway incursions, and mechanical problems documented in NASA AMES files. The RCAA argued that these hidden dangers raised serious questions about the Port of Seattle's plans to expand the airport with a third runway. The letter also requested a moratorium on expansion-related construction permits until a full safety investigation — ideally led by the FAA Inspector General — could be completed. -
1999-11-02
Letter to Arlene Brown regarding aircraft noise concerns in Normandy Park
In this November 1999 letter, the Port of Seattle's Noise Abatement Program Manager responds to a Normandy Park resident's complaints about low-flying aircraft and late-night jet noise near Sea-Tac Airport. The letter explains that smaller propeller aircraft fly different, lower-altitude flight paths than jets for safety reasons, which brings them over residential neighborhoods like Normandy Park. It also notes that while Sea-Tac restricts older, louder aircraft between 10:00 p.m. and 7:00 a.m., the Port lacks legal authority to restrict newer aircraft, though it works with airlines to minimize nighttime noise. -
1999-10-28
EXH AR026497: Aquatic Research Inc Lab Analysis — Water Samples (PAR025-18)
A October 1999 laboratory analysis report from Aquatic Research Incorporated details water sample testing conducted for Parametrix/Port of Seattle. One water sample collected on October 8-11, 1999 was tested for total suspended solids, petroleum hydrocarbons (diesel and motor oil), and total metals including cadmium, copper, lead, and zinc. Results showed low levels of contaminants, with zinc detected at 0.102 mg/l and copper at 0.0070 mg/l, while diesel and motor oil levels fell below detection limits. -
1998-06-10
Letter Karen Keiser to Marc-Stiles Seattle-Times (from Port Of Seattle in violation of Federal Grant Assurance C6 Minnie O. Brasher
A June 10, 1998 Washington State Legislature letter addressed to Marc Stiles, Reporter at the Seattle Times, detailing the State Auditor's Office confirmation that the Port of Seattle violated Federal Grant Assurance C.6 requirements by failing to secure written declarations of support from surrounding jurisdictions for Sea-Tac Airport noise remedy programs. The letter notes that over $100 million in federal grants had been spent on noise insulation for homes near Sea-Tac, and that Congressman Adam Smith had requested a GAO investigation into the matter.