Skip to content
  • STNI
  • Statistics
    • Ops and Passengers
      • King County International Airport (Boeing Field) Annual Operations
    • Financials
    • Aviation fuel uplift in the State of Washington 2018 – 2025
      • Aviation Fuel Uplift at Sea-Tac Airport
    • Air Quality Monitoring
    • Flight Tracking
      • Flow and Flight Tracks
      • Five Year Comparison
      • Busiest Hours and Days
    • SEL Noise Reports & Graphs
      • About The Permanent Noise Monitors
      • Minutes of Quiet by Noise Monitor
      • Noise Events mapped
      • Noise Events (SEL)
    • Runways
    • Employees
    • Real Estate
      • Port Properties and Trees mapped
    • Parking
  • Events
  • Protest
    • Regular Events
    • Legislation 2026
    • Complain about a particular flight
    • Advocacy Organizations
    • Media Outlets
    • People
    • The Port of Seattle
      • Commission Meetings
      • Public Records Requests
      • StART
      • Highline Forum
    • Contact Your Electeds
  • Resources
    • FAQs
      • FAA Occurrences/Accidents/Indents
    • The unSustainable Airport Master Plan
      • SAMP Public Comment Template
        • Two versions of Appendix K: NEPA/SEPA 2018 vs 2023
      • SAMP NTP: 31 projects by the numbers
      • SEPA Draft EIS (2026)
      • SAMP Record of Decision/FONSI (2025)
      • SAMP Draft EA (October 2024)
      • 2018 Scoping
    • Port Packages
      • Port Package Property Costs
      • Port Packages mapped
      • The Port Package Explainer
      • So you want a (first-time) Port Package? Start here
      • Port Package Looker Upper
      • How do I determine if I have a Port Package or Avigation Easement?
      • Progress on Port Package Update legislation
      • Having a Port Package Problem?
      • Port Package Site Visit Follow-Up
    • Document Library
    • Explainers
      • The Airport Law Cheat Sheet
      • The Grant Explainer
    • External Articles
    • History
      • Timeline
      • The Sea-Tac Communities Plan
        • Sea-Tac Communities Plan – Planning Maps
      • PSRC Third Runway Decision Process
    • Studies
    • Videos
  • Stories
  • Mission
  • Subscribe
  • Contact
Scroll down to content

Get InformedStay Informedx

I understand that you will never share my information with anyone, you will only use it to keep me updated on relevant events and that I may unsubscribe at any time.

STNI

STNISea-Tac Noise.Info

  • Solve for Sea-Tac. Solve for every airport.
  • Since 2016, working to obtain justice for everyone living under the flight path.
  • Less Noise. Cleaner Air. Better Public Health. Compensation.
  • Everything you think you know about the airport is wrong.

TagEarthquake(16)

Advanced Search Options

  • Dates
  • Media
    • External Articles
    • Images
    • PDFs
    • Video
    • Audio
  • Order By
  • A deadly earthquake absolutely, positively will ravage Seattle at some point. Here’s how to survive it.

    Huge cracks closed the Port of Kobe in Japan after a devastating earthquake in 1995. The ground at Kobe’s port shifted as much as 10 feet in some areas. (Koji Sasahara / The Associated Press, 1995) By David Guterson Special to The Seattle Times In 2015, The New Yorker published an article asserting that an
    CategoriesFrom The Web TagsEarthquake, Environment, Seattle Times
  • 2002-03-06

    EXH AR024994: Geotechnical Aspects Feb 28 2001 Nisqually Earthquake — Earth Structures Olympia South Seattle Tacoma WA

    This document examines the geotechnical effects of the February 28, 2001 Nisqually earthquake on earth structures in the Olympia, South Seattle, and Tacoma, Washington area. It covers damage observations including landslides along Highway 101, failures of road and railroad embankments, performance of mechanically stabilized earth retaining walls, and the condition of solid waste landfills following the quake. One notable slide near the State Road 8 junction involved a 15-20 meter high embankment that collapsed and sent debris flowing approximately 150 meters downslope.
    TagsACC, Earthquake, Mechanically Stabilized Earth, PCHB, Pollution Control Hearings Board, Third Runway
  • 2002-02-21

    EXH AR023574: CV Edward Kavazanjian Jr. — GeoSyntec Consultants

    This document is a professional curriculum vitae for Edward Kavazanjian, Jr., a Principal at GeoSyntec Consultants specializing in earthquake engineering, geotechnical engineering, and landfill engineering. He holds a Ph.D. from UC Berkeley and has extensive experience in seismic analysis, design, and hazard mitigation for major infrastructure projects across the United States and internationally. Note: This document does not appear to be directly related to Sea-Tac Airport noise policy.
    TagsACC, Earthquake, PCHB, Pollution Control Hearings Board, Third Runway
  • 2002-01-17

    EXH AR053252: Third Runway FLAC Analysis of MSE Walls — Hart Crowser Draft Memorandum

    Draft memorandum dated January 17, 2002 from Hart Crowser engineers Doug Lindquist, Reda Mikhail, and Michael Bailey to Jim Thomson (HNTB Corporation), project number 4978-40, regarding FLAC (finite difference model) seismic analysis of three proposed mechanically stabilized earth (MSE) retaining walls for the Third Runway project at Seattle-Tacoma International Airport. Analyses cover four wall sections
    TagsACC, Earthquake, Mechanically Stabilized Earth, NEPA, Pollution Control Hearings Board, Sea-Tac Airport, Third Runway
  • 2001-11-02

    EXH AR052350: Geotechnical Summary Report — Third Runway Embankment and MSE Retaining Walls, STIA

    Hart Crowser, Inc. geotechnical summary report prepared for the Port of Seattle for presentation to the U.S. Army Corps of Engineers (Seattle District), dated November 2, 2001, project number 4978-06. Covers design of the Third Runway embankment and three mechanically stabilized earth (MSE) retaining walls (50–135 feet height) at Seattle-Tacoma International Airport (STIA). Addresses 17,000,000
    TagsACC, Army Corp of Engineers, Earthquake, Mechanically Stabilized Earth, Pollution Control Hearings Board, Port Of Seattle, Third Runway
  • 2001-08-06

    EXH AR021838: GeoSyntec Comments Third Runway Embankment Fill & West MSE Wall – ACC Technical Review Letter

    In August 2001, GeoSyntec Consultants submitted technical comments to the U.S. Army Corps of Engineers and Washington State Department of Ecology raising serious concerns about the geotechnical safety analyses for the proposed Third Runway expansion at Seattle-Tacoma International Airport. The firm identified multiple flaws in the design work performed by the Port of Seattle's consultants, including underestimation of earthquake risk, incorrect seismic stability analyses, and overestimation of post-earthquake soil stability. GeoSyntec concluded that the Port's consultants had not adequately demonstrated that the embankment fill and retaining wall structures would perform safely under anticipated seismic loads over the facility's lifetime.
    TagsACC, Army Corp of Engineers, Earthquake, Mechanically Stabilized Earth, Pollution Control Hearings Board, Third Runway
  • 2001-05-14

    EXH AR050078: Draft Memorandum — Proposed Liquefaction Procedure Under Walls and Slopes, Third Runway Embankment

    Draft memorandum dated May 14, 2001, from Douglas Lindquist (E.I.T.) and Michael Bailey (P.E.) of Hart Crowser, Inc. to Pete Douglass (P.E.) and Embankment Technical Review Board (ETRB), CC Jim Thomson (P.E.) HNTB, project 4978-30. Describes proposed liquefaction potential evaluation procedure for areas beneath walls and slopes of the Third Runway embankment at Sea-Tac Airport.
    TagsACC, Earthquake, EIS, Pollution Control Hearings Board, Sea-Tac Airport, soil, Third Runway
  • 2001-03-26

    EXH AR049975: Post-Earthquake Reconnaissance and Photo Documentation — STIA Third Runway Project

    Memorandum from Michael Bailey, P.E., Hart Crowser, Inc. to Jim Thomson, P.E., HNTB Corporation, dated March 26, 2001, documenting post-earthquake reconnaissance at the Sea-Tac Airport (STIA) Third Runway Project site (project J-4978-06) following the February 28, 2001, Nisqually earthquake. Two reconnaissance visits on March 1 and March 2, 2001 by Hart Crowser engineers Doug Lindquist
    TagsACC, Earthquake, Mechanically Stabilized Earth, Pollution Control Hearings Board, Port Of Seattle, Sea-Tac Airport, Third Runway
  • 2001-03-26

    EXH AR050017: MSE Wall Performance During Earthquake — Hart Crowser Memorandum to Port Of Seattle

    Hart Crowser memorandum (J-4978-19) from Michael Bailey, P.E., to Port Of Seattle attn. Michael J. Cheyne, CC HNTB attn. Jim Thomson, P.E., dated March 26, 2001, summarizing MSE (Mechanically Stabilized Earth) wall performance during the February 28 Nisqually earthquake. Discusses two MSE walls identified by Helsell Fetterman (Eglick & Stock 3/20/01) and GeoSyntec (3/15/01) as
    TagsACC, Earthquake, Mechanically Stabilized Earth, Pollution Control Hearings Board, Port Of Seattle, Sea-Tac Airport
  • 2001-03-15

    EXH 403: GeoSyntec Letter to Army Corps & WA Ecology — Nisqually Earthquake Implications STIA Third Runway MSE Wall & Embankment Fill

    Following the Nisqually earthquake of February 28, 2001, GeoSyntec Consultants wrote to the U.S. Army Corps of Engineers and Washington State Department of Ecology raising serious concerns about the seismic safety of the proposed Third Runway expansion at Seattle-Tacoma International Airport. The letter highlighted that the earthquake caused damage to mechanically stabilized earth (MSE) walls and widespread liquefaction despite being only a moderate event, reinforcing earlier warnings about flaws in the project's seismic design criteria and ground motion analysis. GeoSyntec argued that the airport's role as a regional emergency lifeline demands higher safety standards than those applied to ordinary residential structures.
    TagsACC, Airport Communities Coalition, Earthquake, Mechanically Stabilized Earth, Pollution Control Hearings Board, Sea-Tac Airport, Third Runway

Posts pagination

Page 1 Page 2
Sidebar On/Off

Upcoming Events

  • StART SEA Stakeholder Advisory Round Table
    Add to CalendarMWednesday Aug 26, 5:00pm - 7:00pm
    Zoom (Virtual Meeting)
    START meetingagenda 2026826 final 0 pdf

    Meeting Objectives Introduce the primary feedback themes identified by StART members regarding StART’s Operating Procedures and determine areas that may warrant future discussion. 5:00 PM – Welcome Meeting Management Welcome Lead: Andrés Mantilla, Facilitator, Uncommon Bridges; Wendy Reiter, Airport Managing Director, POS 5:15 PM – Dinner: All participants eat. 5:30 PM – StART Operating Procedures

    [...]
  • Commercial Aviation Work Group
    Add to CalendarMThursday Sep 3, 10:00am - 1:30pm
    Virtual Meeting (Zoom)
    Cawg agenda sep 3 26 virtual pdf

    Meeting Agenda 10:00 a.m. – 10:15 a.m. | Welcome – Evan Nordby, Chair a. Introductions and Agenda Reviewb. Status of appointments and non-voting member invitationsc. Other updates as necessary 10:15 a.m. – 11:00 a.m. | Is it practical and legal to operate the western Washington [Puget Sound] airports as a single airport system? – Consultant

    [...]

[See all...]


Help study childhood asthma. Get free HEPA filter!

read more...

Issues

Sea-Tac Airport is currently undergoing the largest and longest expansion in its history, collectively known as the Sustainable Airport Master Plan (SAMP). Some of it you can already hear, but you’re probably not aware of what it all means. Here’s what you need to know.
read more...

Read This!

As the source for federal transportation grants, the Puget Sound Regional Council was charged with developing a system to meet the growing need for commercial aviation. When the search for a second airport failed, they authorized the Port of Seattle to build the Third Runway, with a mandate to develop a noise abatement and mitigation program. In their effort to stop the Third Runway, the ACC argued over every detail of the Port's efforts--including property buyouts and sound insulation. The dispute was meant to be settled by a three member Expert Arbitration Panel. This is their final report. It finds 2-1, that the Port's program was insufficient in several respects. Despite that, funding for the Third Runway was approved by the PSRC, and the 'Port Package' program, proceeded largely unchanged. Expert Arbitration Panel's final decision finding that the Port of Seattle had not shown sufficient reduction in real on-the-ground noise impacts to satisfy noise reduction conditions required for approval of a third runway at Sea-Tac International Airport. The majority decision concluded the Port's noise abatement programs were insufficient despite being impressive in scope.
continue...

The Podcast!

Subscribe to the only podcast devoted to policies, politics, history, impacts for people living under the flight path everywhere. It’s definitely not just about noise!
  • Sea-Tac Noise.Info
  • Connect with STNI

    • Subscribe
    • Port Package Problem?
    • Donate
    • Podcast
    • Socials
      • Facebook
      • X (Twitter)
      • Bluesky
      • Instagram

    "Sea-Tac Airport Aerial Photograph" — , 2001

  • Learn

    • Frequently Asked Questions
    • Explainers
    • Youtube
    • Research Requests
    • Make a complaint
  • Goals

    Fulfill the promises of 1976:
    • Compensation
    • Reduced noise
    • Improved air quality
    • Environmental remediation
Login/Register
©2026•Data Privacy

Message

We use cookies to provide basic functionality. We also provide access to search engines in order to provide site analytics. We do not sell or share your data.
V V