TagSea-Tac Airport Master Plan(37)
-
2022-08-24
City of Burien Seattle-Tacoma Airport Master Plan Update Studies: Environmental issues executive summary
This draft report from the City of Burien analyzes environmental impacts of proposed updates to the Seattle-Tacoma Airport Master Plan, covering noise and vibration, air quality, water resources, and visual aesthetics. The study found that while the airport's Environmental Impact Statement used accepted noise modeling methods, several gaps remain — including the need for better data on aircraft noise levels, surface traffic noise, and vibration effects on nearby residents and buildings. Mitigation measures to address these issues will be developed in a separate follow-up report. -
2018-06-21
Resolution No. 3245: Reaffirming adoption of a Master Plan Update for Seattle-Tacoma International Airport
Passed before 3rd Runway -
2002-10-23
EXH AR040029: Resolution No. 3212, As Amended — Port Of Seattle Commission Master Plan Update for STIA, Third Runway Approval
Port Of Seattle Commission Resolution No. 3212, As Amended, adopting the Airport Master Plan Update for Seattle-Tacoma International Airport (STIA), approving development of a new 8500-foot dependent air carrier runway with centerline located no further than 2500 feet west of runway 16L/34R, and committing to additional noise reduction measures per Puget Sound Regional Council Resolution -
2002-10-22
EXH AR034997: Summary of Wetland Mitigation Credit for Sea-Tac Airport Master Plan Update Improvements
Attachment D table summarizing wetland mitigation credit for Seattle-Tacoma International Airport Master Plan Update improvements. Documents in-basin mitigation (102.27 acres, 29.80 credit) and out-of-basin mitigation (65.38 acres, 42.91 credit) for a total of 167.65 mitigation acres and 72.71 total credit. In-basin mitigation includes wetland restoration at Vacca Farm (credit ratio 1:1), wetland enhancement at Vacca -
2002-10-21
EXH 423: STIA Master Plan Update Final EIS Ch.IV §10 Water Quality & Hydrology
This section of the Sea-Tac Airport Master Plan Update Environmental Impact Statement examines how proposed airport expansion alternatives would affect water quality and hydrology in the surrounding area, particularly Miller Creek and Des Moines Creek. The analysis finds that increased impervious surfaces would raise stormwater runoff volumes and peak flow rates, potentially causing downstream flooding and erosion, but that required detention storage facilities and mitigation measures would largely prevent significant water quality degradation. Both creeks, while classified as Class AA extraordinary waters, already show some pollution from urban stormwater runoff, though deeper regional groundwater used for drinking remains unaffected. -
2002-10-21
Exhibit 175: Summary of Wetland Mitigation Credit for Seattle-Tacoma International Airport Master Plan Update Improvements
Exhibit 175 (AR018443) summarizes wetland mitigation credit for Sea-Tac Airport Master Plan Update improvements. Tables detail in-basin mitigation (102.27 acres, 29.80 credit) and out-of-basin mitigation (65.38 acres, 42.91 credit) for a total of 167.65 acres and 72.71 mitigation credits. Specific mitigation sites include Vacca Farm, Miller Creek Wetland and Riparian Buffer, Tyee Valley Golf Course, -
2002-10-20
EXH AR012984: Declaration of Gina Marie Lindsey — STIA Director, PCHB No. 01-0133
Declaration of Gina Marie Lindsey, Director of Seattle-Tacoma International Airport (STIA) since September 1993, submitted in Pollution Control Hearings Board (PCHB) Case No. 01-0133, Airport Communities Coalition v. Department of Ecology and Port of Seattle. Lindsey describes STIA deficiencies including airside delays during poor weather, inadequate parking, inadequate road access for south airport traffic, and -
2002-02-19
Exhibit 2128: Inter-Local Agreement Between Ecology and Port Of Seattle for STIA Master Plan Update Oversight
Facsimile cover sheet dated 2-19-02 from Ray Hellwig, Washington State Department of Ecology Northwest Regional Office (Bellevue, WA), to Tom Young (AAG), transmitting 11 pages including a Port of Seattle memorandum dated February 7, 2002 and an Inter-local Agreement between State of Washington Department of Ecology and Port of Seattle for oversight of construction projects -
2002-01-21
EXH AR031548: Wetlands on STIA North End Properties — Supplemental Information Regarding Wetlands (Parametrix Technical Memorandum)
Parametrix, Inc. technical memorandum dated January 21, 2002, from Jim Kelley, Ph.D., to Muffy Walker, US Army Corps of Engineers Regulatory Branch, regarding Port Of Seattle permit 1996-4-02325 (Sea-Tac Airport Master Plan Update). Provides supplemental information on wetland impacts in upper watersheds of Miller Creek, Walker Creek, and Des Moines Creek, including percent loss of -
2001-11-01
EXH AR017605: Natural Resource Mitigation Plan — STIA Master Plan Update, Proposed Improvement Projects Table 1.3-1
Natural Resource Mitigation Plan for Seattle-Tacoma International Airport (STIA) Master Plan Update, November 2001, document reference 556-2912-001 (03). Table 1.3-1 lists all proposed Master Plan Update improvement projects including: third parallel runway 16X/34X (8,500 ft), Runway Safety Areas (RSAs) for 16R/34L and 16L/34R, South 154th Street relocation, South Aviation Support Area (SASA) for cargo/maintenance, embankment