Lora Lake Apartments Cleanup Update – February 2022
Cleanup completed in January 2020.
Ecology finalized the Lora Lake Apartments Site Construction As-Built Report in January 2021. The cleanup work was conducted over two construction seasons: April to December 2017, and July 2019 to January 2020.
View the Construction As-Built Report:
The Port of Seattle (Port) and consultants prepared a Compliance Monitoring Plan to ensure cleanup methods are meeting cleanup standards. Annual compliance monitoring commenced in 2018 and is ongoing. The first 5-year periodic review will assess the appropriate monitoring frequency for the following 5 years.
What Was Included In The Final Cleanup Action?
The Port removed or contained contaminated soil and sediment starting in December 2017. The cleanup was done in three areas.
Lora Lake Apartments Parcel
The Port removed approximately 42,000 tons of highly contaminated soil for disposal and placed a temporary barrier over the entire parcel. The barrier prevents wildlife and humans from coming in contact with the contaminated soil. A deed restriction (environmental covenant) limits the use of the site to commercial activities and ensures that future activities will not expose the capped contamination. Removal of highly contaminated soil resulted in cleanup of groundwater.
1982 Dredged Material Containment Area
The Port covered contaminated sediment deposited from a past dredging of Lora Lake with a porous pavement that prevents wildlife and humans from contacting the contamination. An environmental covenant will ensure that the cover is maintained.
Lora Lake Parcel
The Port addressed contaminated lake sediments and shallow soil along the western boundary of the parcel.
Lake Sediment: The lake was restored to a wetland by placing approximately 58,200 tons of sand, 44.5 tons of granular activated carbon, and 6,200 cubic yards of topsoil over contaminated sediments contained at the bottom of the lake. Restoration of the lake to a wetland prevents contaminants from entering surface water that flows to Miller Creek. The restored wetland surface was stabilized with biodegradable erosion control fabric and approximately 4,100 woody wetland plants were planted and integrated into the surrounding wetlands. An environmental covenant ensures that the wetland will be maintained.
Shallow Soil: Approximately 1,250 tons of contaminated soil were excavated from the LL Parcel and disposed of off-site. No contamination remains in these areas.
Site Information And Background
The 18-acre site is located at 15001 Des Moines Memorial Drive in Burien, Washington 98148. This site is on Port property at the former Lora Lake Apartments and at Sea-Tac Airport nearby.
- Mid-1940s–Mid 1980s: A barrel-cleaning company followed by an auto-wrecking facility operated on site.
- 1987: A 22-building apartment complex was built.
- 1998: The Port acquired the property as part of a Sea-Tac runway protection zone. The portion of the site that was not required for the Runway Protection Zone is slated to be redeveloped.
- 2007: The Port demolished six buildings. Environmental samples prior to demolition showed higher-than-expected levels of contaminants.
- 2009: Ecology and the Port entered into an Agreed Order, under which the Port agreed to conduct a Remedial Investigation/Feasibility Study to understand the nature and extent of the contamination. The Port also demolished remaining above-ground structures and took measures — with Ecology oversight — not to disturb potentially contaminated soil.
- 2013: The Agreed Order was amended to require the Port to prepare the Draft Cleanup Action Plan.
- 2015. Ecology and the Port entered into a Consent Decree that included Ecology’s final Cleanup Action Plan.
- 2016. The Port finalized the Engineering Design Report, which includes a detailed plan and specifications for the proposed cleanup actions.
- 2017. Construction Season 1 was completed.
- 2020. Construction Season 2 was completed.
- 2022. Environmental Covenants were recorded with King County.
- 2025. Ecology will conduct the first Periodic Review.
Community Profile
The U.S. Environmental Protection Agency (EPA) has developed an environmental justice (EJ) mapping and screening tool called EJSCREEN. It is based on nationally consistent data and an approach that combines environmental and demographic indicators in maps and reports. See below for information about demographics in the area of Lora Lake Apartments, Burien.
EJSCREEN Census Block Map – This map shows the Census Blocks used to generate the reports below.
EJSCREEN ACS Summary Report Lora Lake Apartments – This report shows the demographic information about the population of the area.
EJScreen Report Lora Lake Apartments – This report shows the values for environmental and demographic indicators and EJSCREEN indexes. These percentiles provide perspective on how the selected block group or buffer area compares to the entire state, EPA region, or nation.
You can also check What’s in My Neighborhood to learn about other cleanups in your area.
What Are The Contaminants?
In the 1940s and 1950s, the site was used for cleaning barrels that had contained chemicals. From about the mid-1950s to 1981, the site was used for auto wrecking. Former activities at the site released hazardous chemicals into the environment: the soil, groundwater and sediment at the Lora Lake Apartments site. The contaminants include the following:
- polycyclic aromatic hydrocarbons
- lead
- petroleum products
- arsenic
- pentachlorophenol
- dioxins/furans
More information about these contaminants is available at the Agency for Toxic Substances & Disease Registry’s website.
Site Documents
View Electronic Documents in the right-hand column. Click for instructions on how to submit a public records request.
If you speak a non-English language, free language services are available.
Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. To request an ADA accommodation, contact Ecology by phone at 360-407-6831 or email at ecyadacoordinator@ecy.wa.gov For Washington Relay Service or TTY call 711 or 877-833-6341. Visit Ecology’s website for more information.
To report an environmental problem or concern, any time, day or night, dial 206-594-0000.
Check out What’s In My Neighborhood to find out about other cleanups in your area.
Documents 217
Legal 9
Document Title | Document Date | Document Type |
Lora Lake EC Sunnydale Parcel | 1/26/2022 | Environmental Covenant; Alternative Mechanism |
Lora Lake EC LL Parcel | 1/26/2022 | Environmental Covenant; Alternative Mechanism |
Lora Lake EC LL Apartment Parcel | 1/26/2022 | Environmental Covenant; Alternative Mechanism |
lora lake EC DMCA Parcel | 1/26/2022 | Environmental Covenant; Alternative Mechanism |
2015 Final Consent Decree with CAP | 9/9/2015 | Administrative Order on Consent |
Lora Lake Apartments – Amended Agreed Order (April 18, 2013) | 4/18/2013 | Agreed Order Amendment |
Lora Lake Apartments Agreed Order | 7/10/2009 | Agreed Order |
PLP Waiver | 3/5/2009 | Agreed Order |
Notice of Potential Liability under the Model Toxics Control Act | 2/3/2009 | Agreed Order |
Public Information 24
State Environmental Policy Act 1
Document Title | Document Date | Document Type |
Lora Lake Apartments – SEPA Checklist and Mitigated DNS | 10/25/2013 | SEPA Documents |
Technical Reports 183
Document Title | Document Date | Document Type |
2022 Annual Compliance Monitoring Report | 11/30/2022 | Performance/Confirmational Monitoring Plan or Report |
2021 Annual Compliance Monitoring Report_2021-1027 | 10/1/2021 | Performance/Confirmational Monitoring Plan or Report |
2020 Annual Compliance Monitoring Report | 3/19/2021 | Performance/Confirmational Monitoring Plan or Report |
01_POS-LLA_Construction As-Built Report_Text and Tables_2021-0122 | 1/20/2021 | Construction Plans and Specifications |
Lora Lake Arsenic Memo_2020-0817 | 8/17/2020 | Performance/Confirmational Monitoring Plan or Report |
May 2017 Monthly Progress Report | 6/15/2017 | Progress Report |
April 2017 Monthly Progress Report | 5/11/2017 | Progress Report |
MARCH 2017 Monthly Progress Report | 4/7/2017 | Progress Report |
February 2017 MONTHLY PROGRESS REPORT | 3/14/2017 | Progress Report |
JANUARY 2017 MONTHLY PROGRESS REPORT | 2/15/2017 | Progress Report |
December 2016 Monthly Progress Report | 1/16/2017 | Progress Report |
NOVEMBER 2016 MONTHLY PROGRESS REPORT | 12/16/2016 | Progress Report |
Agreed Order Construction Stormwater General Permit | 11/21/2016 | Site Specific Technical Document – other |
OCTOBER 2016 MONTHLY PROGRESS REPORT | 11/15/2016 | Progress Report |
SEPTEMBER 2016 MONTHLY PROGRESS REPORT | 10/19/2016 | Progress Report |
Notice of Intent, Construction Stormwater General Permit | 10/7/2016 | Site Specific Technical Document – other |
AUGUST 2016 MONTHLY PROGRESS REPORT | 9/13/2016 | Progress Report |
Engineering Design Report Appendices H-N (3 OF 3) (28.5MB) | 9/1/2016 | Engineering Design Report |
Engineering Design Report through Appendix G (2 OF 3) (32MB) | 9/1/2016 | Engineering Design Report |
Engineering Design Report Table of Contents (1 OF 3) (1.4MB) | 9/1/2016 | Engineering Design Report |
2017 Lora Lake Apartments MTCA Remediation Projects – 100% Submittal | 8/29/2016 | Engineering Design Report |
2017 Lora Lake Apartments MTCA Remediation Projects – Project Manual | 8/29/2016 | Engineering Design Report |
July 2016 MONTHLY PROGRESS REPORT | 8/16/2016 | Progress Report |
June 2016 MONTHLY PROGRESS REPORT | 7/13/2016 | Progress Report |
Port of Seattle Nationwide 38 Permit from Army Corps of Engineers | 7/5/2016 | Site Specific Technical Document – other |
May 2016 MONTHLY PROGRESS REPORT | 6/13/2016 | Progress Report |
APRIL 2016 MONTHLY PROGRESS REPORT | 5/13/2016 | Progress Report |
March 2016 MONTHLY PROGRESS REPORT | 4/19/2016 | Progress Report |
February 2016 MONTHLY PROGRESS REPORT | 3/10/2016 | Progress Report |
JANUARY 2016 MONTHLY PROGRESS REPORT | 2/16/2016 | Progress Report |
Lora Lake Drawdown Test Memo | 12/2/2015 | Feasibility Study |
UPDATED Lora Lake Data Summary Memo_final | 12/1/2015 | Remedial Investigation / Feasibility Study |
Compliance Monitoring Plan, figure revisions Jan 2022 | 9/22/2015 | Performance/Confirmational Monitoring Plan or Report |
Demonstration of Groundwater Protection of Surface Water Beneficial Uses | 3/17/2015 | Site Specific Technical Document – other |
Lora Lake 2013-2014 Surface Water – Groundwater Baseline Monitoring, Data Summary Memorandum | 2/20/2015 | Site Specific Technical Document – other |
11 Appendices I-Q LLA FINAL RIFS | 1/16/2015 | Remedial Investigation / Feasibility Study |
10 Appendix H LLA FINAL RIFS_3 | 1/16/2015 | Remedial Investigation / Feasibility Study |
10 Appendix H LLA FINAL RIFS_2_Part26 | 1/16/2015 | Remedial Investigation / Feasibility Study |
10 Appendix H LLA FINAL RIFS_2_Part25 | 1/16/2015 | Remedial Investigation / Feasibility Study |
10 Appendix H LLA FINAL RIFS_2_Part24 | 1/16/2015 | Remedial Investigation / Feasibility Study |
10 Appendix H LLA FINAL RIFS_2_Part23 | 1/16/2015 | Remedial Investigation / Feasibility Study |
10 Appendix H LLA FINAL RIFS_2_Part22 | 1/16/2015 | Remedial Investigation / Feasibility Study |
10 Appendix H LLA FINAL RIFS_2_Part21 | 1/16/2015 | Remedial Investigation / Feasibility Study |
10 Appendix H LLA FINAL RIFS_2_Part20 | 1/16/2015 | Remedial Investigation / Feasibility Study |
10 Appendix H LLA FINAL RIFS_2_Part19 | 1/16/2015 | Remedial Investigation / Feasibility Study |
10 Appendix H LLA FINAL RIFS_2_Part18 | 1/16/2015 | Remedial Investigation / Feasibility Study |
10 Appendix H LLA FINAL RIFS_2_Part17 | 1/16/2015 | Remedial Investigation / Feasibility Study |
10 Appendix H LLA FINAL RIFS_2_Part16 | 1/16/2015 | Remedial Investigation / Feasibility Study |
10 Appendix H LLA FINAL RIFS_2_Part15 | 1/16/2015 | Remedial Investigation / Feasibility Study |
10 Appendix H LLA FINAL RIFS_2_Part14 | 1/16/2015 | Remedial Investigation / Feasibility Study |
10 Appendix H LLA FINAL RIFS_2_Part13 | 1/16/2015 | Remedial Investigation / Feasibility Study |
10 Appendix H LLA FINAL RIFS_2_Part12 | 1/16/2015 | Remedial Investigation / Feasibility Study |
10 Appendix H LLA FINAL RIFS_2_Part11 | 1/16/2015 | Remedial Investigation / Feasibility Study |
10 Appendix H LLA FINAL RIFS_2_Part10 | 1/16/2015 | Remedial Investigation / Feasibility Study |
10 Appendix H LLA FINAL RIFS_2_Part09 | 1/16/2015 | Remedial Investigation / Feasibility Study |
10 Appendix H LLA FINAL RIFS_2_Part08 | 1/16/2015 | Remedial Investigation / Feasibility Study |
10 Appendix H LLA FINAL RIFS_2_Part07 | 1/16/2015 | Remedial Investigation / Feasibility Study |
10 Appendix H LLA FINAL RIFS_2_Part06 | 1/16/2015 | Remedial Investigation / Feasibility Study |
10 Appendix H LLA FINAL RIFS_2_Part05 | 1/16/2015 | Remedial Investigation / Feasibility Study |
10 Appendix H LLA FINAL RIFS_2_Part04 | 1/16/2015 | Remedial Investigation / Feasibility Study |
10 Appendix H LLA FINAL RIFS_2_Part03 | 1/16/2015 | Remedial Investigation / Feasibility Study |
10 Appendix H LLA FINAL RIFS_2_Part02 | 1/16/2015 | Remedial Investigation / Feasibility Study |
10 Appendix H LLA FINAL RIFS_2_Part01 | 1/16/2015 | Remedial Investigation / Feasibility Study |
10 Appendix H LLA FINAL RIFS_1 | 1/16/2015 | Remedial Investigation / Feasibility Study |
9 Appendix G LLA FINAL RIFS_3 | 1/16/2015 | Remedial Investigation / Feasibility Study |
9 Appendix G LLA FINAL RIFS_2_Part22 | 1/16/2015 | Remedial Investigation / Feasibility Study |
9 Appendix G LLA FINAL RIFS_2_Part21 | 1/16/2015 | Remedial Investigation / Feasibility Study |
9 Appendix G LLA FINAL RIFS_2_Part20 | 1/16/2015 | Remedial Investigation / Feasibility Study |
9 Appendix G LLA FINAL RIFS_2_Part19 | 1/16/2015 | Remedial Investigation / Feasibility Study |
9 Appendix G LLA FINAL RIFS_2_Part18 | 1/16/2015 | Remedial Investigation / Feasibility Study |
9 Appendix G LLA FINAL RIFS_2_Part17 | 1/16/2015 | Remedial Investigation / Feasibility Study |
9 Appendix G LLA FINAL RIFS_2_Part16 | 1/16/2015 | Remedial Investigation / Feasibility Study |
9 Appendix G LLA FINAL RIFS_2_Part15 | 1/16/2015 | Remedial Investigation / Feasibility Study |
9 Appendix G LLA FINAL RIFS_2_Part14 | 1/16/2015 | Remedial Investigation / Feasibility Study |
9 Appendix G LLA FINAL RIFS_2_Part13 | 1/16/2015 | Remedial Investigation / Feasibility Study |
9 Appendix G LLA FINAL RIFS_2_Part12 | 1/16/2015 | Remedial Investigation / Feasibility Study |
9 Appendix G LLA FINAL RIFS_2_Part11 | 1/16/2015 | Remedial Investigation / Feasibility Study |
9 Appendix G LLA FINAL RIFS_2_Part10 | 1/16/2015 | Remedial Investigation / Feasibility Study |
9 Appendix G LLA FINAL RIFS_2_Part09 | 1/16/2015 | Remedial Investigation / Feasibility Study |
9 Appendix G LLA FINAL RIFS_2_Part08 | 1/16/2015 | Remedial Investigation / Feasibility Study |
9 Appendix G LLA FINAL RIFS_2_Part07 | 1/16/2015 | Remedial Investigation / Feasibility Study |
9 Appendix G LLA FINAL RIFS_2_Part06 | 1/16/2015 | Remedial Investigation / Feasibility Study |
9 Appendix G LLA FINAL RIFS_2_Part05 | 1/16/2015 | Remedial Investigation / Feasibility Study |
9 Appendix G LLA FINAL RIFS_2_Part04 | 1/16/2015 | Remedial Investigation / Feasibility Study |
9 Appendix G LLA FINAL RIFS_2_Part03 | 1/16/2015 | Remedial Investigation / Feasibility Study |
9 Appendix G LLA FINAL RIFS_2_Part02 | 1/16/2015 | Remedial Investigation / Feasibility Study |
9 Appendix G LLA FINAL RIFS_2_Part01 | 1/16/2015 | Remedial Investigation / Feasibility Study |
9 Appendix G LLA FINAL RIFS_1 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_03 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part65 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part64 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part63 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part62 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part61 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part60 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part59 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part58 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part57 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part56 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part55 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part54 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part53 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part52 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part51 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part50 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part49 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part48 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part47 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part46 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part45 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part44 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part43 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part42 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part41 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part40 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part39 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part38 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part37 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part36 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part35 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part34 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part33 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part32 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part31 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part30 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part29 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part28 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part27 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part26 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part25 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part24 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part23 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part22 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_02_Part21 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA Final RIFS_02_Part20 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA Final RIFS_02_Part19 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA Final RIFS_02_Part18 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA Final RIFS_02_Part17 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA Final RIFS_02_Part16 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA Final RIFS_02_Part15 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA Final RIFS_02_Part14 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA Final RIFS_02_Part13 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA Final RIFS_02_Part12 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA Final RIFS_02_Part11 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA Final RIFS_02_Part10 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA Final RIFS_02_Part09 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA Final RIFS_02_Part08 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA Final RIFS_02_Part07 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA Final RIFS_02_Part06 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA Final RIFS_02_Part05 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA Final RIFS_02_Part04 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA Final RIFS_02_Part03 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA Final RIFS_02_Part02 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA Final RIFS_02_Part01 | 1/16/2015 | Remedial Investigation / Feasibility Study |
8 Appendix F LLA FINAL RIFS_01 | 1/16/2015 | Remedial Investigation / Feasibility Study |
7 Appendix E LLA FINAL RIFS_09 | 1/16/2015 | Remedial Investigation / Feasibility Study |
7 Appendix E LLA FINAL RIFS_08 | 1/16/2015 | Remedial Investigation / Feasibility Study |
7 Appendix E LLA FINAL RIFS_07 | 1/16/2015 | Remedial Investigation / Feasibility Study |
7 Appendix E LLA FINAL RIFS_06 | 1/16/2015 | Remedial Investigation / Feasibility Study |
7 Appendix E LLA FINAL RIFS_05 | 1/16/2015 | Remedial Investigation / Feasibility Study |
7 Appendix E LLA FINAL RIFS_04 | 1/16/2015 | Remedial Investigation / Feasibility Study |
7 Appendix E LLA FINAL RIFS_03 | 1/16/2015 | Remedial Investigation / Feasibility Study |
7 Appendix E LLA FINAL RIFS_02 | 1/16/2015 | Remedial Investigation / Feasibility Study |
7 Appendix E LLA FINAL RIFS_01 | 1/16/2015 | Remedial Investigation / Feasibility Study |
6 Appendix D LLA FINAL RIFS | 1/16/2015 | Remedial Investigation / Feasibility Study |
5 Appendix C LLA FINAL RIFS | 1/16/2015 | Remedial Investigation / Feasibility Study |
4 Appendix B LLA FINAL RIFS | 1/16/2015 | Remedial Investigation / Feasibility Study |
3 Appendix A LLA FINAL RIFS Appx A_3 | 1/16/2015 | Remedial Investigation / Feasibility Study |
3 Appendix A LLA FINAL RIFS Appx A_2 | 1/16/2015 | Remedial Investigation / Feasibility Study |
3 Appendix A LLA FINAL RIFS Appx A_1 | 1/16/2015 | Remedial Investigation / Feasibility Study |
2 Figures PDF LLA FINAL RIFS | 1/16/2015 | Remedial Investigation / Feasibility Study |
1 Text and Tables LLA FINAL RIFS | 1/16/2015 | Remedial Investigation / Feasibility Study |
Proposed Sediment Cleanup Levels for the Lora Lake Parcel Protective of Human Health Risk | 12/29/2014 | Site Specific Technical Document – other |
Work Plan for Hydrogeologic Data Collection at the Lora Lake Parcel | 4/2/2014 | Remedial Investigation Work Plan |
Lora Lake Apartments Public Meeting Poster Board November 7, 2013 | 11/7/2013 | Site Specific Administrative Document – other (Administrative correspondence) |
Lora Lake Parcel Soil Sampling Results | 9/13/2013 | Remedial Investigation / Feasibility Study |
Lora Lake Apartments – Lora Lake Apartments Update 2012 | 7/10/2012 | Site Specific Administrative Document – other (Administrative correspondence) |
Lora Lake Parcel RI/FS Work Plan | 2/11/2011 | Remedial Investigation Work Plan |
Lora Lake Apartments Technical Memorandum: Deep Monitoring Well Plan | 8/23/2010 | Site Specific Technical Document – other |
Lora Lake Apartments RI/FS Work Plan | 4/1/2010 | Remedial Investigation Work Plan |
Lora Lake Apartments Stormwater Interim Action Work Plan | 11/17/2009 | Site Specific Technical Document – other |
Lora Lake Apartments Summary Report 2008 Investigations and Data Gap Evaluation | 9/1/2009 | Site Specific Technical Document – other |
Lora Lake Appartment Buildings Construction Stormwater Polution Prevention Plan | 8/14/2009 | Site Specific Technical Document – other |
Places to see print documents
-
Northwest Regional Office15700 Dayton Ave NShoreline, 98133Please schedule an appointment to view print documents at this location.
-
Burien Public Library400 SW 152nd StreetBurien, 98166This location may only have print documents available during open comment periods.
Contaminants 8
Contaminant Type |
Soil
|
Groundwater
|
Surface Water
|
Air
|
Sediment
|
Bedrock
|
---|---|---|---|---|---|---|
Halogenated Organics – Halogenated Organics | C | |||||
Metals – Metals Priority Pollutants | C | C | ||||
Metals – Metals – Other | B | |||||
Non-Halogenated Organics – Petroleum Products-Unspecified | C | C | ||||
Halogenated Organics – Dioxins/Furans | C | C | ||||
Non-Halogenated Organics – Polycyclic Aromatic Hydrocarbons | C | B | ||||
Halogenated Organics – Halogenated Solvents | C | |||||
Metals – Arsenic | C | C |
- S
- Suspected
- C
- Confirmed Above Cleanup Levels
- B
- Below Cleanup Levels
- RA
- Remediated-Above
- RB
- Remediated-Below
- R
- Remediated