TagPort Of Seattle(1845)
-
2001-11-15
EXH AR006137: ACC Updated Preliminary List of Exhibits, PCHB No. 01-160
Airport Communities Coalition (ACC) updated preliminary list of exhibits filed with the Pollution Control Hearings Board (PCHB) in case No. 01-160, ACC v. State of Washington Department of Ecology and Port Of Seattle. Lists 29 exhibits including 401 Certifications, depositions, resumes and declarations of Amanda Azous and Dyanne Sheldon, letters from Northwest Hydraulic Consultants, Corps -
2001-11-15
EXH AR006154: ACC’s Updated Preliminary List of Witnesses — PCHB No. 01-133 and 01-150
Airport Communities Coalition (ACC) updated preliminary witness list filed with the Pollution Control Hearings Board (PCHB) for Washington State, case numbers PCHB No. 01-133 and PCHB No. 01-150, against respondents Department of Ecology and Port Of Seattle. Filed November 15, 2001 by Helsell Fetterman LLP and Rachael Paschal Osborn. Lists Department of Ecology personnel including -
2001-11-15
EXH AR006159: Port Of Seattle’s Objections to Issues Proposed by ACC, PCHB Case No. 01-160
Port Of Seattle’s objections filed November 15, 2001 to three issues proposed by Airport Communities Coalition (ACC) in Pollution Control Hearings Board (PCHB) Case No. 01-160, concerning §401 certification for the Third Runway project. Objects to ACC Proposed Issues 11, 18, and 19: Issue 11 concerns dam safety permit requirements under WAC 173-175 and reasonable -
2001-11-15
EXH AR006162: Port Of Seattle Letter to PCHB on Plans and Reports Pursuant to §401 Certification, PCHB Case No. 01-160
Letter from Foster Pepper & Shefelman (attorneys for Port Of Seattle) to Kaleen Cottingham, Presiding Officer, Pollution Control Hearings Board (PCHB Case No. 01-160), dated November 15, 2001, identifying plans and reports prepared or expected to be prepared pursuant to §401 Certification. Lists documents submitted on or before November 15, 2001 (Wetland A17 mitigation plan, -
2001-11-15
PCHB Doc AR006187: ACC v. Ecology and Port Of Seattle — Supplemental Stipulation Regarding Proposed Statement of Legal Issues
Supplemental Stipulation filed in PCHB No. 01-160, Airport Communities Coalition (ACC) v. State of Washington Department of Ecology and Port Of Seattle. Filed November 15, 2001, received by the Pollution Control Hearings Board November 16, 2001. Documents 21 agreed proposed legal issues for the Board’s consideration, covering Clean Water Act Section 401 certification for the -
2001-11-15
EXH AR006193: Ecology’s Objections to Issues Proposed Separately by ACC
Respondent Washington State Department of Ecology’s objections filed before the Pollution Control Hearings Board (PCHB No. 01-133, PCHB No. 01-160) to issues proposed separately by Airport Communities Coalition (ACC). Ecology objects to ACC Issue No. 2 as outside the Board’s jurisdiction over the 401 Certification, and to ACC Issue No. 3 as duplicative, vague, and -
2001-11-02
AR 026273: Response to ACOE Questions on 26 October 2001 Submittals — STIA MPU Natural Resource Mitigation
Parametrix, Inc. (Jim Kelley, Ph.D.) transmittal to Muffy Walker, U.S. Army Corps of Engineers (ACOE), dated November 2, 2001, responding to ACOE questions on 26 October 2001 submittals for the Sea-Tac International Airport (STIA) Master Plan Update (MPU) Natural Resource Mitigation project (Project No. 556-2912-001-03). Responses address: 1980 and 1990 air photos and wetland overlays -
2001-11-02
EXH AR052350: Geotechnical Summary Report — Third Runway Embankment and MSE Retaining Walls, STIA
Hart Crowser, Inc. geotechnical summary report prepared for the Port of Seattle for presentation to the U.S. Army Corps of Engineers (Seattle District), dated November 2, 2001, project number 4978-06. Covers design of the Third Runway embankment and three mechanically stabilized earth (MSE) retaining walls (50–135 feet height) at Seattle-Tacoma International Airport (STIA). Addresses 17,000,000 -
2001-11-02
EXH AR006206: ACC v. Ecology and Port Of Seattle — Stipulation Regarding Proposed Statement of Legal Issues, PCHB No. 01-160
Stipulation filed November 2, 2001 in PCHB No. 01-160 by Airport Communities Coalition (ACC) against Washington State Department of Ecology and Port Of Seattle, pursuant to Pre-Hearing Order dated October 30, 2001. Three stipulated legal issues: (1) whether Ecology violated applicable law on public and agency notice, hearing, comment, and modification regarding the original 401/404 -
2001-11-02
EXH AR018323: Geotechnical Summary Report — Third Runway Embankment and MSE Retaining Walls, Seattle-Tacoma International Airport
Hart Crowser geotechnical summary report (project 4978-06) prepared for the Port of Seattle for presentation to the U.S. Army Corps of Engineers, November 2, 2001. Covers Third Runway embankment construction at Seattle-Tacoma International Airport: 17,000,000 cubic yards compacted earth fill, maximum fill thickness 165 feet, 2H:1V side slopes, three Mechanically Stabilized Earth (MSE) retaining walls