TagWSDOT(129)
-
2005-06-24
ESSB 5121 proposed project schedule, Phase I: Airport facility, air cargo, passenger, and air space capacity assessment
This draft project schedule outlines the planned timeline for Phase I of Washington State's airport facility, air cargo, passenger, and airspace capacity assessment under ESSB 5121, running from May 2005 through August 2006. Key milestones include advertising for a consultant, developing a detailed scope of work, securing an FAA grant, and completing a final Phase I report by July 1, 2006. WSDOT Aviation was responsible for submitting the findings to legislative committees, the governor, transportation commission, and regional planning organizations. -
2004-04-19
Resolution No. 3523 – Des Moines Creek Basin Plan Interlocal Agreement V2
A Port of Seattle resolution authorizing the Chief Executive Officer to execute version two of an Interlocal Agreement with the Cities of Des Moines and SeaTac, Washington State Department of Transportation and King County to fund, construct, operate and maintain capital projects necessary to implement the Des Moines Creek Basin Plan. The projects include construction -
2004-03-18
Miller and Walker Creek Basin Plan public meeting
A public meeting for the Miller and Walker Creek Basin Plan was held on March 18, 2004, at the Criminal Justice Training Center in Burien, Washington, running from 6:30 to 8:30 PM. The meeting included a presentation and a question-and-answer session, covering stormwater and drainage planning for the Miller and Walker Creek watersheds near Sea-Tac Airport. The project was managed by a multi-agency team representing the City of Burien, City of Normandy Park, City of SeaTac, King County, Port of Seattle, and WSDOT. -
2003-01-01
SR 509: Corridor Completion/I-5/South Access Road final environmental impact statement and Section 4(f) evaluation
This January 2003 Final Environmental Impact Statement evaluates proposed highway improvements in southwest King County, Washington, including an extension of SR 509 and upgrades to I-5 between South 210th Street and South 310th Street to improve regional access to Seattle-Tacoma International Airport. Three build alternatives and a No Action Alternative are assessed, with the SR 509 extension designed to accommodate two general purpose lanes and a center high-occupancy vehicle lane in each direction. The project was jointly prepared by the Federal Highway Administration, Washington State Department of Transportation, Port of Seattle, King County, and the Cities of SeaTac and Des Moines. -
2002-10-22
EXH AR034984: Resume of James C. Kelley, Ph.D. — Wetland Ecologist, Parametrix
Resume of James C. Kelley, Ph.D., wetland ecologist with Parametrix, covering 16 years of professional experience in aquatic ecology, wetland delineation, mitigation planning, NEPA compliance, Section 404 Clean Water Act permitting, and Endangered Species Act compliance. Projects include SR 509 East-West Corridor EIS Wetland Report for Washington State Department of Transportation (Port of Tacoma), Port -
2002-01-01
SR 509: Corridor Completion/I-5/South Access Road revised draft environmental impact statement and draft Section 4(f) evaluation
★ 32This January 2002 Revised Draft Environmental Impact Statement evaluates proposed improvements to SR 509 and I-5 in southwest King County, Washington, including a freeway extension to enhance southern access to Seattle-Tacoma International Airport. The study, prepared jointly by the Federal Highway Administration, WSDOT, Port of Seattle, King County, and the Cities of SeaTac and Des Moines, examines three build alternatives and a no-action alternative, differing in their proximity to Des Moines Creek Park and the airport runway protection zone. The proposed SR 509 extension corridor would be a minimum of 200 feet wide to accommodate general purpose and high-occupancy vehicle lanes in each direction. -
2000-05-25
EXH 288: First Avenue Bridge Fill Source Data Summary
This document summarizes soil contamination test results for fill material taken from the First Avenue Bridge site, collected between October 1999 and May 2000. Samples were tested for petroleum hydrocarbons (diesel and heavy oil ranges) as well as RCRA 8 metals and other contaminants, with results indicating varying levels of heavy oil detected across samples. The table notes which soil samples were ultimately placed at the Third Runway construction site at Sea-Tac Airport, with several samples excluded due to contamination concerns. -
2000-02-10
EXH AR034771: State of Washington Alternative Mitigation Policy Guidance for Aquatic Permitting Requirements from the Departments of Ecology and Fish and Wildlife
State of Washington interagency policy guidance (AR 034771, Exhibit 2193) adopted by Washington Department of Fish and Wildlife (WDFW) and Washington Department of Ecology (WDOE) for evaluating aquatic mitigation alternatives under section 401 of the Clean Water Act, the Shoreline Management Act (RCW 90.58), and the Hydraulic Code (RCW 75.20). Covers mitigation sequencing (avoiding, minimizing, -
1999-11-29
EXH AR026475: WSDOT Letter — Available Fill Material, First Ave S Bridge Construction Site
In November 1999, the Washington State Department of Transportation (WSDOT) wrote to the Port of Seattle offering approximately 120,000 cubic yards of excess fill material from the First Avenue South Bridge construction site for use in the Sea-Tac Airport third runway project. While most of the material was found to be environmentally sound, the top few feet of soil showed slightly elevated levels of petroleum hydrocarbons, which WSDOT offered to retest using a different procedure before any transfer. The Port was asked to confirm environmental acceptability and provide a haul route before an agreement could be finalized.