Exhibit 230: Email from Bill Rozeboom (Northwest Hydraulic Consultants) to Peter Eglick Re: IWS Lagoon Expansion and Fitzpatrick Email Analysis
A February 2000 email from hydraulic consultant Bill Rozeboom argues that the proposed expansion of Sea-Tac Airport's Integrated Wetlands System (IWS) lagoon—tripling its storage capacity—is primarily driven by the airport's Master Plan Improvements, including the proposed third runway, rather than being a routine water quality project. Rozeboom notes that the planned increase in impervious drainage area (roughly 521 additional acres) closely mirrors the proposed increase in IWS storage volume, supporting his conclusion that the third runway is the primary driver of the expansion. He also raises concerns that the environmental documents fail to adequately assess the impact of large-scale out-of-basin water transfers on aquifer recharge and stream base flows in the Miller Creek and Des Moines Creek basins. -
2000-02-14
EXH AR024622: Draft Memo — Site-Specific WQC Copper Status Update, Miller, Walker & Des Moines Creeks
A February 2000 internal draft memorandum from environmental consultants to Port of Seattle staff summarizes efforts to develop a site-specific water quality criterion for copper in Miller, Walker, and Des Moines Creeks, in connection with stormwater runoff anticipated from a proposed third runway at Sea-Tac Airport. The memo evaluates two technical approaches—the Water-Effect Ratio (WER) and the site-specific metals translator—for potentially raising copper discharge permit limits, and outlines initial toxicity screening and range-finding study results. It also describes ongoing negotiations with the Washington State Department of Ecology regarding unresolved issues such as mixing zones, AKART requirements, and critical sampling conditions. -
2000-02-14
EXH AR024917: Draft Memo — Site-Specific WQC Status Update, Copper, Miller, Walker & Des Moines Creeks
A February 2000 draft memorandum from environmental consultants to Keith Smith summarizes efforts to develop a site-specific water quality criterion for copper in Miller, Walker, and Des Moines Creeks near Seattle-Tacoma Airport, in anticipation of stormwater runoff from a proposed third runway. The memo outlines two technical approaches—the Water-Effect Ratio (WER) and the site-specific metals translator—for potentially raising copper discharge permit limits, and describes toxicity screening and range-finding studies conducted in 1999. The phased study approach was designed to avoid unnecessary costs if the WER method proved infeasible or if the Washington Department of Ecology would not permit its use in adjusting permit limits. -
2000-02-10
EXH AR034771: State of Washington Alternative Mitigation Policy Guidance for Aquatic Permitting Requirements from the Departments of Ecology and Fish and Wildlife
State of Washington interagency policy guidance (AR 034771, Exhibit 2193) adopted by Washington Department of Fish and Wildlife (WDFW) and Washington Department of Ecology (WDOE) for evaluating aquatic mitigation alternatives under section 401 of the Clean Water Act, the Shoreline Management Act (RCW 90.58), and the Hydraulic Code (RCW 75.20). Covers mitigation sequencing (avoiding, minimizing, -
2000-02-08
Exhibit 82: Email Chain RE Fill Criteria for the Third Runway — Ecology/Port Of Seattle Financial Arrangement Discussion
Email chain dated February 8, 2000 among Washington State Department of Ecology staff (Roger Nye, Raymond Hellwig, Steve Alexander) regarding fill criteria compliance for the Third Runway at Sea-Tac Airport. Roger Nye describes the 401/404 permit fill acceptance policy developed with Port Of Seattle governing contaminant criteria for borrow sources used in Third Runway construction -
2000-02-01
EXH AR044214: Quarterly Ground Water Level Measurements, C1 (Qva) Monitoring Well Network, Ground Water Study, STIA
Letter dated February 1, 2000 from John Strunk, Associated Earth Sciences, Inc. (AESI Project No. BV97016D) to Roger Nye, Washington Department of Ecology Northwest Regional Office, submitting first and second quarter ground water level measurements from the C1 (Qva) aquifer monitoring well network at Seattle-Tacoma International Airport. Reports on six pressure transducers installed in the -
2000-01-31
EXH AR044092: Memorandum — Response to Ecology Comments on Conceptual Flow Model Boundary Presentation, Ground Water Study, STIA
Memorandum BV97016D dated January 31, 2000, from John Strunk (Associated Earth Sciences Inc.) and Mike Riley (S.S. Papadopulos & Associates, Inc.) to Roger Nye, Department of Ecology, responding to nine Ecology comments on the Conceptual Flow Model Boundary Presentation for the Seattle-Tacoma International Airport ground water study. Topics addressed include MODFLOW model setup covering approximately -
2000-01-28
EXH AR018446: Forwarded Email re SEPA Register Entry — Third Runway Wetland Fill and Temporary Construction at Sea-Tac Airport
Internal forwarded email chain dated January 28, 2000, from Erik Stockdale to Tom Luster (copying Sarah Suggs original), forwarding a SEPA register entry (Ecology File# 200000524, LA File# 00-02) for an Addendum EIS issued by the Port of Seattle as lead agency. The addendum EIS covers Third Runway Wetland Fill and Temporary Construction at Sea-Tac -
2000-01-24
EXH AR44097: Port Of Seattle SEPA Addendum — Third Parallel Runway Wetland Fill and Temporary Construction-Only Interchange at SR 509/South 176th Street
SEPA Addendum dated January 24, 2000, Port Of Seattle, POS SEPA No. 00-02, addressing modifications to the Master Plan Update Development Actions for the Third Parallel Runway at Seattle-Tacoma International Airport. Addendum covers: (1) increased wetland acreage affected by the project, revised from 12.23 acres to 18.33 acres, with 15.41 acres affected by the runway -
2000-01-24
EXH AR032610: Desk Manual for Ecology’s Federal Permit Team 401/CZM Review
Desk Manual for Washington State Department of Ecology’s Federal Permit Team covering Section 401 Water Quality Certifications and Coastal Zone Management Act (CZM) consistency determinations. Covers SEPA compliance, JARPA application procedures, public notice and hearings, permit review timelines, waivers, 303(d)-listed waters, wetlands mitigation, sediment management standards, Puget Sound Dredged Disposal Analysis (PSDDA), NPDES coordination, antidegradation,