TagACC(1531)
-
2001-08-01
EXH AR019520: Workbook Tools Calculating Soil & Groundwater Cleanup Levels MTCA User’s Guide
This 2001 User's Guide from the Washington State Department of Ecology describes software workbook tools (MTCASGL and MTCATPH) designed to help calculate soil and ground water cleanup levels under the Model Toxics Control Act. The guide covers installation, technical requirements, and step-by-step instructions for entering site-specific data such as chemical properties, exposure parameters, and hydrogeological characteristics. Note that while this document addresses environmental cleanup standards, it does not appear to be directly related to Sea-Tac Airport noise policy. -
2001-08-01
EXH AR017586: Water Quality Certification #1996-4-02325 Draft, Page 16-17 — Operational Stormwater Requirements for STIA
Draft Water Quality Certification #1996-4-02325, pages 16-17 of 23, dated August 2001, issued by Washington State Department of Ecology regarding Port Of Seattle Seattle-Tacoma International Airport (STIA). Covers operational stormwater requirements including the approved Comprehensive Stormwater Management Plan (CSMP) Volumes 1-4 December 2000 as revised July 2001, retrofitting of stormwater management facilities, discharge of operational -
2001-08-01
EXH 244: Declaration William A. Rozeboom Supporting ACC Motion for Stay PCHB No. 01-133 Third Runway Stormwater Low Flow Impacts
A declaration by civil engineer William A. Rozeboom, filed with Washington's Pollution Control Hearings Board, raises concerns about the environmental impact of Seattle-Tacoma International Airport's Third Runway construction project. Rozeboom, a stormwater and hydraulics expert retained by the Airport Communities Coalition, warns that the project will reduce low streamflows in Des Moines, Miller, and Walker Creeks during summer months due to increased impervious surfaces and changes to the industrial wastewater system. While the July 2001 Stormwater Management Plan addresses peak flood flows, Rozeboom argues it fails to adequately assess or mitigate the project's impact on low-flow stream conditions. -
2001-08-01
EXH AR046206: Duplicate of August 2001, See Exhibit No. 1267
Administrative Record document AR046206 noting this is a duplicate of an August 2001 document, with reference to Exhibit No. 1267. The document contains no substantive content beyond the cross-reference notation. -
2001-08-01
EXH AR032547: Volume V Runoff Treatment BMPs — Enhanced Treatment Menu and Basic Treatment Menu (Chapter 3, Sections 3.4–3.5)
Exhibit AR032547 from Washington State Department of Ecology (Ecology), Volume V – Runoff Treatment BMPs, August 2001. Covers phosphorus removal treatment trains (Table 3.1), Enhanced Treatment Menu (Section 3.4) and Basic Treatment Menu (Section 3.5) for stormwater management. Specifies requirements for industrial, commercial, multi-family project sites, arterials and highways discharging to fish-bearing streams or lakes. -
2001-08-01
EXH 2237 (AR 034850): Workbook Tools Calculating Soil & Groundwater Cleanup Levels MTCA — User’s Guide
This 2001 User's Guide from the Washington State Department of Ecology explains how to use spreadsheet workbook tools (MTCASGL and MTCATPH) to calculate soil and groundwater cleanup levels under the Model Toxics Control Act. The guide covers how to enter site-specific data—such as chemical properties, exposure parameters, and hydrogeological characteristics—to determine safe contamination thresholds. It is intended for environmental cleanup professionals working on hazardous substance remediation in Washington State. -
2001-07-31
EXH AR018266: Attachment X — NRMP Plan Set Revisions for Miller Creek Relocation, Floodplain Enhancement, and In-Stream Buffer Enhancements
Email from Ann Kenny to Katie Walter (cc: Raymond Hellwig, Erik Stockdale) dated July 31, 2001, transmitting Attachment X: NRMP Plan Set Revisions (AR018266, DOE 8/13/01 0567). The attachment lists prescriptive revision requirements for plan sheets in Appendix A (Miller Creek Relocation and Floodplain Enhancement) and Appendix B (Miller Creek In-stream and Buffer Enhancements), including -
2001-07-31
Exhibit 2011: Port Of Seattle Letter to Ecology — Conceptual Drawing for Flow Impact Offset Facility, Sea-Tac Airport
Letter dated July 31, 2001 from Keith R. Smith, Water Resources Manager at Port Of Seattle, to Ms. Ann E. Kenny at the Washington State Department of Ecology Northwest Regional Office (Bellevue, WA 98008-5452), transmitting conceptual drawings for the proposed Flow Impact Offset Facility at Seattle-Tacoma International Airport. Drawings relate to reserved stormwater release storage, -
2001-07-31
EXH AR023740: Handwritten Notes NEPL/CARGO Water Quality Treatment, Spill Containment, Third Runway EIS
Handwritten notes dated 7/31/01 from Kelly Whiting discuss water quality treatment options for a downstream area, referencing NEPL and CARBO systems with treatment rates of 40% and 10% respectively. The notes cover spill containment and oil management considerations, including gravity oil-water separators and spill containment vaults upstream. A follow-up note from 7/31/01 indicates water quality issues will have comments, with discussion of impact numbers from a 7/23 report. -
2001-07-30
EXH AR025049: Draft 401 Certification — Acceptable Fill Criteria & Prohibited Fill Material Language (July 30, 2001)
This July 2001 draft document outlines clean fill criteria for the Port of Seattle's Third Runway construction project at Sea-Tac Airport, requiring the Port to submit environmental assessment documentation to the Washington Department of Ecology before placing any fill material. It specifies that fill may only come from state-certified borrow pits, contractor-certified construction sites, or Port-owned properties, while prohibiting the use of any contaminated or remediated soils. The document details testing and sampling requirements, including review of contamination records and analysis of hazardous substances, to ensure that no toxic materials are introduced into wetlands or state waters during construction.