2001-08-05
EXH AR018284: Ecology Draft 401 Water Quality Certification for Third Runway at STIA — Revised Draft and Attachments
Email from Ann Kenny (Washington State Department of Ecology) dated August 5, 2001, distributing a revised Draft 401 Water Quality Certification for the construction of a Third Runway and related projects at Seattle-Tacoma International Airport (STIA) in the Miller, Walker, and Des Moines Creek watersheds and wetlands in SeaTac and Auburn, King County, Washington. The -
2001-08-05
EXH AR017930: Ecology Draft 401 Water Quality Certification for Third Runway at STIA — Internal Review Email and Draft Letter
Email from Ann Kenny (Washington State Department of Ecology) dated August 5, 2001, circulating a revised Draft 401 Water Quality Certification for the Port Of Seattle’s Third Runway construction at Seattle-Tacoma International Airport (STIA). Recipients include Gordon White, Raymond Hellwig, Erik Stockdale, Kevin Fitzpatrick, John Drabek, Dave Garland, Ching-Pi Wang, Katie Walter, Kelly Whiting, Joan -
2001-08-03
EXH AR018276: Draft 401 Conditions for Port Of Seattle NRMP Auburn Mitigation Site — Memorandum from Katie Walter to Ann Kenny
Deliberative memorandum dated August 3, 2001 from Katie Walter (Shannon & Wilson, Inc.) to Ann Kenny (Washington State Department of Ecology), transmitting revised draft 401 conditions for the Port Of Seattle Natural Resources Mitigation Plan (NRMP) Auburn Mitigation Site. Document 21-1-12020-001-M1 REVISED.doc covers Auburn Mitigation Site revisions including culvert placement issues on June 28, 2001 -
2001-08-03
EXH AR018283: Email from Katie Walter to Ann Kenny Regarding Fish/Stream Monitoring Plan
Email dated August 3, 2001 from Katie Walter (KLW@shanwil.com) to Ann Kenny, cc Erik Stockdale, regarding fish and stream monitoring recommendations for Port Of Seattle mitigation area. Discusses IBI (Index of Biotic Integrity) methodology limitations and augmentation with monitoring of temperature, turbidity, channel morphology, substrate quality, large woody debris, riparian canopy cover, and fish use. -
2001-08-03
EXH AR017264: Email Chain RE: Deliberative Draft 401 WQC for Third Runway — Drabek to Kenny
Email chain between John Drabek and Ann Kenny (Washington State Department of Ecology) dated August 3, 2001, regarding a preliminary deliberative draft Section 401 Water Quality Certification (WQC) for the Sea-Tac Airport Third Runway. Drabek raises question about RCW 90.48 required AKART implementation in NPDES permit reissuances and integration with the 401. Kenny’s original email -
2001-08-03
Exhibit 2212: Email on Fish/Stream Monitoring Conditions for Port Of Seattle Mitigation
Email dated August 3, 2001 from Katie Walter (Shannon & Wilson, KLW@shanwil.com) to Ann Kenny, cc Erik Stockdale, subject fish/stream monitoring. References Richard Brocksmith (fish biologist) and IBI (Index of Biotic Integrity) methodology for stream health monitoring. Proposes monitoring condition language for Port Of Seattle requiring monitoring plan covering temperature, turbidity, channel morphology, substrate quality, -
2001-08-03
EXH AR024388: King County Review Comments Low Flow Impact Analysis & Offset Facility Proposal, Jul 2001
In August 2001, King County's Department of Natural Resources submitted a technical review letter to the Washington Department of Ecology evaluating the Port of Seattle's Low Flow Impact Analysis and proposed offset facilities for stormwater management near Sea-Tac Airport. The review found the proposal goes well beyond the basic requirements of the King County Surface Water Design Manual and represents substantial mitigation for low flow impacts in affected drainage basins, including Miller and Walker Creeks. Reviewers noted several inconsistencies and data gaps in the documentation and recommended that a final consolidated document be prepared incorporating all corrections and technical memoranda. -
2001-08-03
EXH AR024406: Water Quality Cert #1996-4-02325 Draft Operational Stormwater Requirements pp.16–17
This August 2001 draft document outlines Water Quality Certification conditions for Sea-Tac International Airport (STIA), requiring the Port of Seattle to implement a Comprehensive Stormwater Management Plan covering treatment, flow control, and retrofitting of stormwater facilities. Key requirements include obtaining Ecology approval before discharging operational stormwater to state waters, conducting a Water Effects Ratio Study, and ensuring all runoff from impervious surfaces is treated using all known available and reasonable treatment methods. The Port must also retrofit existing stormwater facilities at a rate proportional to new impervious surface construction, with progress documented in quarterly reports. -
2001-08-03
EXH AR017574: King County Letter to Ecology on Port Of Seattle Comprehensive Stormwater Management Plan for Sea-Tac Airport Master Plan Improvements
Letter dated August 3, 2001 from Pam Bissonnette, Director of King County Department of Natural Resources, to Ann Kenny, Senior Permit Specialist at Washington Department of Ecology Northwest Regional Office, conveying King County’s technical review findings on the Port Of Seattle’s Comprehensive Stormwater Management Plan (SMP) for Master Plan Update (MPU) Improvements at Seattle-Tacoma International -
2001-08-03
Exhibit 451: Water Quality Certification #1996-4-02325 Draft — Operational Stormwater Requirements (Pages 16–17)
This August 2001 draft document outlines Water Quality Certification conditions (#1996-4-02325) governing stormwater management at Seattle-Tacoma International Airport (Sea-Tac). It sets requirements for the Port of Seattle to implement and maintain a Comprehensive Stormwater Management Plan, including retrofitting existing impervious surfaces, meeting state water quality standards, and obtaining Ecology approval before discharging stormwater to receiving waters. The document also addresses scheduling, flow control benchmarks, and the use of all known available and reasonable treatment methods (AKART) for runoff from impervious surfaces.