2001-12-17
PCHB Doc 005803: CASE’s Reply Brief Supporting Intervention — PCHB No. 01-160
Reply brief filed December 17, 2001 by Citizens Against Sea-Tac Expansion (CASE), represented by Richard A. Poulin of Smith & Lowney P.L.L.C., supporting CASE’s motion to intervene in PCHB No. 01-160 before the Pollution Control Hearings Board for the State of Washington. Case is Airport Communities Coalition (ACC) v. Washington State Department of Ecology and -
2001-12-14
EXH AR005802: Notice of Association of Counsel — ACC v. Ecology and Port Of Seattle, PCHB No. 01-160
Notice of Association of Counsel filed December 14, 2001 in PCHB No. 01-160 before the Pollution Control Hearings Board for the State of Washington. Richard A. Poulin of Smith & Lowney, 2317 E. John Street, Seattle, WA 98112, associates with Helsell Fetterman LLP and Rachael Paschal Osborn to represent Airport Communities Coalition (ACC) against respondents -
2001-12-14
EXH AR028396: Agreement Between Port Of Seattle and City Of Sea-Tac for Development of Certain Port-Owned Properties
Agreement effective December 14, 2001 between Port Of Seattle and City of SeaTac for development of Port-owned properties known as Borrow Area #3 (south of South 200th Street, west of 18th Avenue South) and Borrow Area #4 (north of South 200th Street, west and south of 18th Avenue South and South 196th Street). Resolves outstanding -
2001-12-13
EXH AR026623: Ecology Justification Amendment No. 3 Contract C0100121 Shannon & Wilson
In December 2001, Washington State Department of Ecology drafted a justification to amend its contract with engineering firm Shannon and Wilson, Inc., adding $57,412 to support ongoing review of the Port of Seattle's Natural Resource Mitigation Plan related to the proposed Third Runway project at Sea-Tac Airport. The amendment was needed to cover expert witness testimony before the Pollution Control Hearings Board following an appeal of Ecology's 401 Water Quality Certification, as well as field monitoring of wetland construction and review of revised mitigation documents. Funding for the contract was provided through an interagency agreement with the Port of Seattle and was not approved by the Port Commission until December 11, 2001. -
2001-12-13
EXH 291: Letter to Ecology — Third Runway Embankment Fill Material Update Oct–Nov 2001
In December 2001, the Port of Seattle submitted a compliance update to the Washington State Department of Ecology documenting fill material placed at the Sea-Tac Airport third runway embankment during October and November 2001. The report lists all fill sources, quantities, and placement locations and elevations for that period, and corrects a calculation error in a previously submitted October summary table. The documentation was prepared to meet the requirements of Condition E of the 401 Water Quality Certification governing the third runway construction project. -
2001-12-12
EXH AR053195: Hydrologic Conditions and Wetland Hydrology, Borrow Area 1 — Hart Crowser Memorandum
Memorandum dated December 12, 2001 from Michael Kenrick and Reese Hastings of Hart Crowser Inc. to Jim Thomson of HNTB, project number 4978-62, analyzing pre-construction and post-construction hydrologic conditions at Borrow Area 1 associated with the Port of Seattle Master Plan Update for Sea-Tac International Airport (STIA). Covers surface water and groundwater impacts, wetland hydrology, -
2001-12-12
EXH 294: Third Runway Off-Site Borrow Source Baseline Chemical Characterization, Black River Quarry, Renton WA
This December 2001 report, prepared by Hart Crowser, Inc. for the Port of Seattle, presents baseline chemical characterization results for the Black River Quarry in Renton, Washington, which was evaluated as an off-site borrow source of fill material for the Sea-Tac Third Runway Project. The study involved soil sampling, metals analysis, and data quality review to assess the suitability of quarry material for use in runway construction. Tables and figures detail sample locations, soil descriptions, and total metals analytical results from laboratory testing by North Creek Analytical, Inc. -
2001-12-12
EXH AR026986: Third Runway Project Off-Site Borrow Source Baseline Chemical Characterization, Marine View Pit, Fife, Washington
Hart Crowser, Inc. report prepared for Port Of Seattle, December 12, 2001, project number 4978-06. Baseline chemical characterization of the Marine View Pit in Fife, Washington, as an off-site borrow source for the Third Runway Project at Sea-Tac Airport. Report includes total metals analytical results, soil sample descriptions, site plan schematic and sample location map, -
2001-12-11
PCHB 01-160: Order on ACC’s Motion to Supplement the Record
Pollution Control Hearings Board (PCHB) Order in case PCHB 01-160 denying Airport Communities Coalition (ACC) motion to supplement the record on its motion for stay of § 401 Certification No. 1996-4-02325 (amended-1) issued by the Washington State Department of Ecology. ACC filed the motion on November 16, 2001; Port Of Seattle opposed on November 26, -
2001-12-11
EXH AR019740: Hart Crowser Letter to Ecology — Professional & Owner/Agency Certification, NE 4th St & 108th Ave, Bellevue
In December 2001, Hart Crowser, Inc. submitted Washington State Department of Revenue forms to the Department of Ecology certifying an environmental remedial action at a property located at the corner of NE 4th Street and 108th Avenue in Bellevue, King County. The Professional Certification was signed by Matthew F. Schultz, P.E., confirming that the cleanup was conducted independently and in a manner consistent with Washington's Model Toxics Control Act (MTCA). The filing sought a Washington State sales tax exemption and business and occupation tax credit for the environmental remedial action project (J-7600000).