TagPollution Control Hearings Board(1532)
-
2001-11-02
EXH AR006206: ACC v. Ecology and Port Of Seattle — Stipulation Regarding Proposed Statement of Legal Issues, PCHB No. 01-160
Stipulation filed November 2, 2001 in PCHB No. 01-160 by Airport Communities Coalition (ACC) against Washington State Department of Ecology and Port Of Seattle, pursuant to Pre-Hearing Order dated October 30, 2001. Three stipulated legal issues: (1) whether Ecology violated applicable law on public and agency notice, hearing, comment, and modification regarding the original 401/404 -
2001-11-01
EXH AR052286: Miller Creek Riparian Corridor and Instream Enhancement Project — Wetland A17 Restoration, STIA Master Plan Update Improvements
Report prepared by Parametrix, Inc. for Port Of Seattle regarding the Miller Creek Riparian Corridor and Instream Enhancement Project and Wetland A17 Restoration, part of the Seattle-Tacoma International Airport Master Plan Update Improvements. Document AR 052286 covers wetland mitigation design, Army Corps of Engineers requirements, buffer averaging, hydrology, soils, vegetation, grading, landscape plan, performance standards, -
2001-11-01
RE: Processed Materials
An email chain discussing the application of ‘fill criteria’ under the 401 permit conditions for the Port of Seattle’s Third Runway project. Ed Abbasi provides guidance on how different fill materials (topsoil, backfill, fill borrow, gravel) should be handled, including certification and QA/QC requirements. The original emails from Elizabeth Leavitt and Beth Clark initiated the -
2001-11-01
AR 026637: Trickle Down Effect — Metal Roofing Materials Contribute to Elevated Zinc Concentrations in Sea-Tac Airport Stormwater Discharges
Article by Scott A. Tobiason and Linda R. J. Logan published in ‘Industrial Wastewater’ magazine (WEF publication), November 2001, about whole effluent toxicity (WET) testing and source tracing at Seattle-Tacoma International Airport (STIA), operated by Port Of Seattle. Documents that galvanized metal roofing on cargo buildings contributed to elevated zinc concentrations in stormwater discharges from -
2001-11-01
EXH AR052455: Des Moines Way Nursery Mitigation Plan, Seattle-Tacoma International Airport Master Plan Update Improvements
Parametrix, Inc. prepared this Des Moines Way Nursery Mitigation Plan (AR 052455) for Port Of Seattle, Seattle-Tacoma International Airport, November 2001, project number 556-2912-001(03). The plan covers wetland restoration and enhancement at the Des Moines Way Nursery mitigation site, including grading design, expected hydrology, wildlife considerations, planting plan, vegetation monitoring, performance standards, maintenance and contingency -
2001-11-01
EXH AR052531: Memorandum from Port Of Seattle to Army Corps of Engineers — 404 Review of On-Site Borrow Areas
Memorandum dated November 1, 2001 from Elizabeth Leavitt (Port Of Seattle) to Muffy Walker (U.S. Army Corps of Engineers) regarding Army Corps Section 404 review of on-site borrow areas for Sea-Tac Airport Third Runway embankment fill. Covers Borrow Areas 1, 3, and 4 located in Des Moines and SeaTac; combined 6.1 million cubic yards of -
2001-11-01
EXH AR029275: Natural Resource Mitigation Plan, Master Plan Update Improvements, Seattle-Tacoma International Airport
Final Natural Resource Mitigation Plan (NRMP) prepared by Parametrix, Inc. for the Port Of Seattle, covering Master Plan Update Improvements at Seattle-Tacoma International Airport (Sea-Tac Airport). Document number 556-2912-001 (03), dated November 2001. Administrative Record document AR 029275–AR 029277. -
2001-11-01
EXH AR17604: Figure 1.3-1 — Master Plan Update Improvement Projects at STIA
Port of Seattle Natural Resource Mitigation Plan figure (AR017604, Exhibit 46, dated 12-20-01) showing Master Plan Update Improvement Projects at Seattle-Tacoma International Airport (STIA). Map depicts Third Runway construction area, Runway Safety Areas (RSAs), MSE retaining walls used to avoid and minimize wetland impacts, relocated section of Miller Creek, Miller Creek Detention Facility, Lora Lake, -
2001-11-01
EXH AR017605: Natural Resource Mitigation Plan — STIA Master Plan Update, Proposed Improvement Projects Table 1.3-1
Natural Resource Mitigation Plan for Seattle-Tacoma International Airport (STIA) Master Plan Update, November 2001, document reference 556-2912-001 (03). Table 1.3-1 lists all proposed Master Plan Update improvement projects including: third parallel runway 16X/34X (8,500 ft), Runway Safety Areas (RSAs) for 16R/34L and 16L/34R, South 154th Street relocation, South Aviation Support Area (SASA) for cargo/maintenance, embankment -
2001-10-31
DRAFT Low Flow Analysis Meeting Notes from October 30, 2001
An email chain forwarding draft meeting notes from a low flow analysis meeting held October 30, 2001. Raymond Hellwig forwards the notes to Thomas Fitzsimmons, noting that revisions to the low flow analysis based on correction of previous modeling errors are reasonable but will require clear documentation and rationale. Cheryl Blaser of Floyd Snider McCarthy,