Notes
Memorandum dated November 1, 2001 from Elizabeth Leavitt (Port Of Seattle) to Muffy Walker (U.S. Army Corps of Engineers) regarding Army Corps Section 404 review of on-site borrow areas for Sea-Tac Airport Third Runway embankment fill. Covers Borrow Areas 1, 3, and 4 located in Des Moines and SeaTac; combined 6.1 million cubic yards of fill reducing off-site imports by 46% of 17.2 million cubic yard total requirement. Documents traffic impact reductions (VMT reductions of 4.6 million miles for Areas 3/4, 7.0 million miles for Area 1), air quality benefits, $45 million cost savings, wetland impacts (1.03 acres in Borrow Area 1), ASARCO smelter arsenic concentrations in Borrow Area 4 soils, WSDOT right-of-way coordination, stormwater management, groundwater protection, and site reclamation. References February 1996 FEIS and May 1997 FSEIS for Master Plan Improvements.