EXH AR017605: Natural Resource Mitigation Plan — STIA Master Plan Update, Proposed Improvement Projects Table 1.3-1

Notes

Natural Resource Mitigation Plan for Seattle-Tacoma International Airport (STIA) Master Plan Update, November 2001, document reference 556-2912-001 (03). Table 1.3-1 lists all proposed Master Plan Update improvement projects including: third parallel runway 16X/34X (8,500 ft), Runway Safety Areas (RSAs) for 16R/34L and 16L/34R, South 154th Street relocation, South Aviation Support Area (SASA) for cargo/maintenance, embankment fill (16.5 million cubic yards), borrow sites (6.7 million cy), Miller Creek sewer relocation, stormwater detention vaults and ponds discharging to Miller Creek, Walker Creek, and Des Moines Creek, SASA Detention Pond (33.4 acre-ft), NEPL Vault (13.9 acre-ft), South 156th Way Bridge replacement over Miller Creek, North Terminal expansion, SR 509 and SR 518 temporary interchanges, and SASA access taxiways. Projects involve wetland, floodplain, stream, and drainage channel impacts. Exhibit 47, AR 017605–017607.