TagPollution Control Hearings Board(1532)
-
2001-11-15
EXH AR021065: ACC Updated Preliminary Witness List — PCHB Nos. 01-133 & 01-150
This November 2001 legal filing lists the witnesses that the Airport Communities Coalition (ACC) planned to call at a Pollution Control Hearings Board proceeding against the Washington State Department of Ecology and the Port of Seattle. The witness list includes personnel from the Department of Ecology and Port of Seattle, outside consultants such as Parametrix and Shannon & Wilson, and ACC's own expert witnesses covering environmental, hydraulic, and biological topics. The case, filed under PCHB Nos. 01-133 and 01-150, centered on a water quality certification related to Sea-Tac Airport. -
2001-11-15
EXH AR006137: ACC Updated Preliminary List of Exhibits, PCHB No. 01-160
Airport Communities Coalition (ACC) updated preliminary list of exhibits filed with the Pollution Control Hearings Board (PCHB) in case No. 01-160, ACC v. State of Washington Department of Ecology and Port Of Seattle. Lists 29 exhibits including 401 Certifications, depositions, resumes and declarations of Amanda Azous and Dyanne Sheldon, letters from Northwest Hydraulic Consultants, Corps -
2001-11-15
EXH AR006154: ACC’s Updated Preliminary List of Witnesses — PCHB No. 01-133 and 01-150
Airport Communities Coalition (ACC) updated preliminary witness list filed with the Pollution Control Hearings Board (PCHB) for Washington State, case numbers PCHB No. 01-133 and PCHB No. 01-150, against respondents Department of Ecology and Port Of Seattle. Filed November 15, 2001 by Helsell Fetterman LLP and Rachael Paschal Osborn. Lists Department of Ecology personnel including -
2001-11-15
EXH AR006159: Port Of Seattle’s Objections to Issues Proposed by ACC, PCHB Case No. 01-160
Port Of Seattle’s objections filed November 15, 2001 to three issues proposed by Airport Communities Coalition (ACC) in Pollution Control Hearings Board (PCHB) Case No. 01-160, concerning §401 certification for the Third Runway project. Objects to ACC Proposed Issues 11, 18, and 19: Issue 11 concerns dam safety permit requirements under WAC 173-175 and reasonable -
2001-11-15
EXH AR006162: Port Of Seattle Letter to PCHB on Plans and Reports Pursuant to §401 Certification, PCHB Case No. 01-160
Letter from Foster Pepper & Shefelman (attorneys for Port Of Seattle) to Kaleen Cottingham, Presiding Officer, Pollution Control Hearings Board (PCHB Case No. 01-160), dated November 15, 2001, identifying plans and reports prepared or expected to be prepared pursuant to §401 Certification. Lists documents submitted on or before November 15, 2001 (Wetland A17 mitigation plan, -
2001-11-15
PCHB Doc AR006187: ACC v. Ecology and Port Of Seattle — Supplemental Stipulation Regarding Proposed Statement of Legal Issues
Supplemental Stipulation filed in PCHB No. 01-160, Airport Communities Coalition (ACC) v. State of Washington Department of Ecology and Port Of Seattle. Filed November 15, 2001, received by the Pollution Control Hearings Board November 16, 2001. Documents 21 agreed proposed legal issues for the Board’s consideration, covering Clean Water Act Section 401 certification for the -
2001-11-15
Exhibit 198: Sea-Tac Third Runway Embankment Fill Modeling — Site Features for Hydrus-Slice Modeling (Figure 2-1)
This document presents site features and cross-sectional diagrams used for Hydrus-Slice hydrological modeling of the Sea-Tac Third Runway Embankment Fill project. It shows fill depths ranging from 0 to 160 feet across multiple modeled slices, with cross sections identifying impervious areas, elevation contours, and the watershed divide between Miller Creek and Walker Creek. The figures were produced in November 2001 as part of environmental engineering analysis for the third runway construction. -
2001-11-15
EXH AR006193: Ecology’s Objections to Issues Proposed Separately by ACC
Respondent Washington State Department of Ecology’s objections filed before the Pollution Control Hearings Board (PCHB No. 01-133, PCHB No. 01-160) to issues proposed separately by Airport Communities Coalition (ACC). Ecology objects to ACC Issue No. 2 as outside the Board’s jurisdiction over the 401 Certification, and to ACC Issue No. 3 as duplicative, vague, and -
2001-11-15
PCHB Doc 6195: Ecology’s Revised Preliminary Witness and Exhibit List — ACC v. Ecology and Port Of Seattle (PCHB No. 01-133, 01-160)
Respondent State of Washington Department of Ecology’s revised preliminary witness and exhibit list filed before the Pollution Control Hearings Board in PCHB No. 01-133 and 01-160, Airport Communities Coalition v. Ecology and Port Of Seattle. Lists 11 Ecology witnesses including Ann Kenny, Erik Stockdale, Kevin Fitzpatrick, Dave Garland, and others from Ecology Northwest Regional Office -
2001-11-07
EXH AR026126: HSPF Modeling Notes — Miller, Walker & Des Moines Creeks; HSPF-Hydrus/Slice Linkages
A 2001 technical memo from Hydrocomp, Inc.'s Norm Crawford outlines recommendations for hydrological modeling of Miller, Walker, and Des Moines Creeks near Sea-Tac Airport's new runways and taxiways. The document describes how surface runoff and groundwater flow from both impervious runway surfaces and surrounding pervious grasslands should be calculated and linked across three modeling tools: HSPF, Hydrus, and the Slice model. Key recommendations include properly accounting for infiltration, reducing till seepage by 33% for inactive groundwater recharge, and reconciling discrepancies in land area calculations between the different models.