TagPollution Control Hearings Board(1532)
-
1999-05-01
EXH AR042458: Agreed Order #97TC-N122 — State of Washington Ecology vs. Port Of Seattle, Sea-Tac Airport
Agreed Order #97TC-N122 issued by Washington State Department of Ecology under RCW 70.105D.050(1) directed to Port Of Seattle regarding hazardous substance contamination at Seattle-Tacoma International Airport (STIA). Documents thirteen contaminated sites within the Aircraft Operations and Maintenance Area (AOMA), a 1/2 square-mile area in the southeast quadrant of the airport, contaminated with jet fuel, gasoline, -
1999-05-01
EXH AR017691: Agreed Order #97TC-N122 — State of Washington Ecology vs. Port Of Seattle, Sea-Tac Airport
Washington State Department of Ecology Agreed Order #97TC-N122 issued to Port Of Seattle for Seattle-Tacoma International Airport (STIA), pursuant to RCW 70.105D.050(1). Documents hazardous substance releases within the Aircraft Operations and Maintenance Area (AOMA), a half-square-mile southeast quadrant of STIA operational since 1944. Contaminants identified include jet fuel (most abundant by bulk volume), gasoline, industrial -
1999-04-30
EXH AR023760: Turn Basin #3 — Memo on Meeting with Port Of Seattle Officials Regarding 3rd Runway Area as Disposal Site
A April 30, 1999 memo documents a meeting between Corps of Engineers staff and Port of Seattle officials to discuss using land near Sea-Tac Airport's proposed 3rd runway as a disposal site for approximately 60,000 cubic yards of material from the Corps' Turn Basin #3 project. Key logistics covered included hauling up to 1,000 cubic yards per day starting in late July 1999 using no more than six trucks, with no fees charged for dumping on Port property. Outstanding questions included whether the Corps' Regulatory Branch — which was simultaneously reviewing a permit for the 3rd runway — might have conflicts of interest in using that same site, and what formal agreement would be needed between the two agencies. -
1999-04-30
EXH AR023761: Email Cooke to Freedman et al. — Turn Basin #3 Material Disposal, 3rd Runway Site
A 1999 internal U.S. Army Corps of Engineers email discusses plans to dispose of approximately 60,000 cubic yards of excavated material from a Duwamish River habitat restoration project (Turn Basin #3) at a Port of Seattle site designated for the proposed Third Runway. The email raises concerns about whether this collaboration with the Port could compromise the Corps' ability to issue an impartial permit decision for the Third Runway project, while noting the arrangement could save the restoration project around $200,000 in disposal costs. -
1999-04-30
EXH AR028045: Email Chain — Legal Concerns Regarding 401 Certification and Stormwater WQS Compliance Policy
Email chain dated April 30, 1999 from Ronald Lavigne (ATG) and Ann Kenny to Washington State Department of Ecology staff including Sandra Manning, Kevin Fitzpatrick, and others, raising legal concerns about agreements reached at a Wednesday meeting regarding 401 certification and 402 permit policy. Lavigne raises issues including: the state’s one-year waiver deadline for 401 -
1999-04-22
EXH AR022190: Stormwater Monitoring Procedure Manual STIA NPDES WA-002465-1 Rev 6
This is a Procedure Manual for stormwater monitoring at Sea-Tac International Airport, developed by Port of Seattle Environmental Services to comply with NPDES Permit WA-002465-1. It outlines sampling locations, monitoring schedules, deicing event protocols, and quality assurance procedures for collecting and reporting stormwater data. The manual covers topics ranging from automatic and manual sampling methods to laboratory accreditation and discharge monitoring report requirements. -
1999-04-21
EXH AR023626: Contract Services Request — STIA Groundwater Study
In April 1999, the Washington State Department of Ecology requested contract services to independently review a groundwater study being conducted by the Port of Seattle at Sea-Tac Airport. The study aimed to determine whether groundwater contamination at the airport posed a risk to nearby surface waters and public water wells. Contract experts were needed to evaluate the Port's conceptual groundwater models, three-dimensional MODFLOW computer simulations, and proposed field monitoring work. -
1999-04-19
Exhibit 177: Email from Gail Terzi Regarding SR509 and Third Runway Conflicts
Email forwarded by Erik Stockdale to Tom Luster, originating from Gail Terzi, regarding SR509 proposal conflicts with Sea-Tac Airport third runway (SASA). Key issues include wetland fills in overlapping areas, moving Des Moines Creek for SR509 while Port Of Seattle spends millions bridging the creek at Tyee, and FAA telling WSDOT they CAN mitigate habitat -
1999-04-17
EXH AR024754: DOE Outgoing Call — Third Runway BMP Workplan and Existing Outfalls
A April 17, 1999 outgoing telephone call was made to Kevin Fitzpatrick at the DOE regarding Project No. 55-2912-01(6), the POS Third Runway. The caller asked whether Ecology could proceed with reviewing the outline for the WER workplan and their approach to the mixing zones at the same time as evaluating BMPs at existing outfalls. Fitzpatrick responded that this was not acceptable to Ecology, stating that BMPs for existing outfalls must be addressed or confirmed as met before other project activities could proceed. -
1999-04-14
EXH AR023762: Email Turning Basin #3 Duwamish/Hamm Creek Disposal Site Runway Coordination
A April 14, 1999 email from Mike O'Neil of Metro King County discusses plans to use a Port of Seattle runway at Sea-Tac Airport as a disposal site for dredged material from Turning Basin #3 on the Duwamish/Hamm Creek project. The Port's contact, John Rothnie, found the material geotechnically and environmentally acceptable, but noted that sending more than 6 trucks per hour could trigger a special permit requirement from the City of SeaTac. Hauling was estimated to begin in June 1999 and conclude in August, with contingency plans for dewatering especially wet material at an alternative commercial site.