TagPollution Control Hearings Board(1532)
-
1999-04-12
EXH AR018444: Email on Bird Strike Hazard Monitoring at Sea-Tac Airport — Vacca Farm and Tyee Golf Course Mitigation Sites
Email dated April 12, 1999 from Erik Stockdale to Raymond Hellwig and Tom Luster (cc: Erik Stockdale) regarding bird strike hazard (BASH) monitoring at Sea-Tac Airport in-basin mitigation sites Vacca Farm and Tyee Golf Course. Stockdale recounts conversation with Jim Kelley (FAA) about the need for baseline ‘before’ bird use data at mitigation sites prior -
1999-04-01
EXH AR026946: Assessment of Spawning and Habitat in Three Puget Sound Streams, Washington
BioAnalysts, Inc. report by T.W. Hillman, J.R. Stevenson, and D.J. Snyder prepared for Airport Communities Coalition (ACC), Des Moines, WA. Surveys of habitat composition and condition, redd (nest) abundance and distribution, and spawning population characteristics of coho (Oncorhynchus kisutch), chum (O. keta), and cutthroat trout (O. clarki) in Miller Creek, Walker Creek, and Des Moines -
1999-03-30
Record of Communication – Kevin Fitzpatrick, Ecology
A three-page record of an outgoing telephone communication dated March 30, 1999, documenting a follow-up call to Kevin Fitzpatrick at Ecology regarding the WER work plan outline and mixing zone study approach. The notes detail Kevin’s responses about who would assist with WER work plan renewal, the mixing zone study approach, and conditions for proceeding, -
1999-03-29
Exhibit AR026677: Parametrix Fax Transmission — Port Of Seattle Water Quality Datalogs, Walker Creek Site, WGR Samples
Fax transmission dated 3/29/99 from Ron Simmons at Parametrix, Inc. (Kirkland, WA) to Scott Tobiason at Port Of Seattle, PMX Project #55-2912-01(61), fax number (206)431-4980. Linda Logan requested transmission of datalogs for WGR samples collected from receiving streams on 2/22/99. Includes POS Water Quality Datalog for site WC dated 2/22/99, recording pH, temperature, dissolved oxygen -
1999-03-24
Hamm Creek Soil Quality Review
A memorandum from Beth Doan to Paul Agid reviewing soil quality data for the Hamm Creek Restoration Project Site, evaluating contaminants including PCBs, DDTs, PAHs, and mercury against MTCA cleanup levels and PSDDA screening levels. The memo concludes that the Hamm Creek material is suitable for use as third runway fill based on MTCA standards, -
1999-03-17
TB#3: Disposal Sites Update Email
An internal email from Patrick Cagney (NWS) to Paul Cooke and Brett Amrine discussing potential disposal sites for excavated material from a construction project. The email outlines three options: Port of Seattle’s third runway site (no tipping fee but hauling costs), ProCon (16 miles away with specific pricing), and Sunset (13 miles away at $1.75 -
1999-03-16
3R Wall Alternative Selection Process – S+W Peer Review
These are engineering calculation notes from a HartCrowser peer review session regarding wall alternative selection for a retaining or MSE (Mechanically Stabilized Earth) wall project. The notes cover topics including wall versus slope analysis, corrosion rates, seismic considerations, geosynthetic quality, construction contingencies, and test fill instrumentation. Action items include S+W verbal records, a memo, and -
1999-03-16
Record of Communication – Elizabeth Leavitt / Port Of Seattle WER Outline Discussion
A telephone communication record from Parametrix documenting an outgoing call with Elizabeth Leavitt of the Port of Seattle regarding questions about the WER outline, mixing zones review, and the Port review of the WER workplan outline. Key discussion points include Elizabeth’s approval for PMX to discuss the WER outline directly with Kevin Fitzpatrick and Mark -
1999-03-11
Request for Ruling on Prepaid Position Reinstatement for Sea-Tac Airport
Roger Nye of the Washington State Department of Ecology requests a legal ruling from Assistant Attorney General Kathy Gerla regarding the reinstatement of a full-time prepaid position for Sea-Tac Airport. The memo outlines the history of the prepaid position from 1992 through 1996, including its cancellation due to the absence of a signed Agreed Order, -
1999-03-11
FW: Another Viewpoint On Stormwater
An email chain from Washington State Department of Ecology staff discussing the challenges of applying water quality standards to stormwater discharges under Section 401 and 402 of the Clean Water Act. The correspondence includes a detailed analysis from NPDES stormwater permitting supervisor Kevin Fitzpatrick recommending an adaptive management approach, and a summary of a meeting