2000-09-27
EXH AR017920: Ecology Draft Letter to Port Of Seattle on 401 Water Quality Certification Withdrawal and Reapplication Process — Third Runway
Attorney-client privileged deliberative document dated September 27, 2000, from Gordon White (Washington Department of Ecology, Shorelands and Environmental Assistance Program) to Tom Luster, Raymond Hellwig, Kevin Fitzpatrick, Joan Marchioro (ATG), and Erik Stockdale. Transmits draft letter to M.R. (Mic) Dinsmore, Executive Director, Port Of Seattle, regarding 401 Water Quality Certification review for the Third Runway -
2000-09-26
EXH AR023557: Water Resources Consulting to Ecology — Des Moines Creek Flow Augmentation Facility
A September 26, 2000 letter from Water Resources Consulting L.L.C. to the Washington State Department of Ecology critiques the Port of Seattle's plans to augment water flow in Des Moines Creek, a project related to Sea-Tac Airport operations. The letter identifies several serious flaws in the proposal, including the lack of a secured water source, concerns about water temperature and fluoride toxicity to fish, and a maintenance-intensive design prone to failure. The author concludes that the Port's 'preliminary design' does not provide reasonable assurance that water quality standards will be met. -
2000-09-25
EXH 240A: Preliminary Comments Set 2 on Aug 2000 Stormwater Management Plan STIA Master Plan Update
A September 2000 letter from Northwest Hydraulic Consultants raises concerns that the Seattle-Tacoma International Airport's Stormwater Management Plan fails to adequately assess or mitigate the third runway embankment's impact on stream base flows and seepage flows to nearby wetlands. The consultants argue that the Port of Seattle's own data contradicts its claims that the embankment fill would maintain groundwater recharge, and that independent re-analysis suggests summer groundwater reductions to Miller Creek could be roughly twice what the Port reported. The letter calls for more rigorous and consistent hydrologic modeling before construction commitments are made. -
2000-09-15
EXH AR023555: Letter Water Resources Consulting to WA Ecology — Lake Youngs Outlet Temp Data, Des Moines Creek Flow Augmentation Facility
A water resources consultant wrote to the Washington State Department of Ecology in September 2000, arguing that Seattle Public Utilities' Lake Youngs water supply is too warm to effectively cool Des Moines Creek during summer months. Temperature data showed that Lake Youngs outlet water exceeds 16°C from mid-June through mid-October — the exact period when cooler stream temperatures are needed — reaching as high as 20°C in summer 2000. The letter concludes that the Port of Seattle's proposed flow augmentation facility for Des Moines Creek cannot rely on this water source for temperature improvement, undermining the Port's claims about its water supply plan. -
2000-09-15
EXH AR026129: King County DNR Letter to Ecology — Comprehensive Stormwater Mgmt Plan STIA Master Plan Update
In September 2000, King County's Department of Natural Resources provided a technical review of the Port of Seattle's Comprehensive Stormwater Management Plan (SMP) for proposed Master Plan Update improvements at Seattle-Tacoma International Airport. The review found no fatal flaws in the plan's approach to meeting King County's stormwater standards, but identified inconsistencies in flow control calculations and water quality measures that needed to be resolved before final permitting. King County also emphasized the importance of rigorous erosion and sediment control during construction and recommended that Ecology and the Port establish a joint compliance team to oversee implementation of the complex, multi-year project. -
2000-09-12
EXH AR045977: Evaluation of Perched Zone Interception and Possible Impacts to Wetland Hydrology, Borrow Area 3, Sea-Tac Third Runway
Hart Crowser report prepared for Port of Seattle, dated September 12, 2000 (J-4978-13), evaluating perched groundwater zone interception at Borrow Area 3 for the Sea-Tac Third Runway project. Analyzes shallow perched groundwater flow from northwest to southeast beneath Borrow Areas 3 and 4, its role in sustaining Wetland 29, and the impact of borrow area -
2000-09-11
EXH AR017488: Internal Email — Clean Fill Criteria Language for 401 Water Quality Certification on Sea-Tac Third Runway
Internal email exchange between Peter Kmet and Kevin Fitzpatrick (Supervisor, Industrial Permit Unit, Water Quality Program, NWRO) dated September 11, 2000, regarding Clean Fill Criteria language for the 401 Water Quality Certification on the Sea-Tac Third Runway project. Document marked ‘Deliberative Document Currently Exempt From Public Disclosure.’ Kmet comments on draft certification conditions E6 (borrow -
2000-09-08
EXH AR023947: Third Runway Update Talking Points — ECY SMT Briefing
This September 2000 internal briefing document from the Washington State Department of Ecology (ECY) outlines the agency's long-running regulatory review of the proposed Third Runway at Seattle-Tacoma International Airport, covering key environmental concerns such as wetland mitigation, stormwater management, and wildlife hazard management. It describes ongoing conflicts with the Port of Seattle over compliance with environmental permits, including a Clean Water Act Section 401 certification that was heavily conditioned in 1998 and subsequently withdrawn by the Port. The document also notes intensifying political pressure from legislators, the Governor's office, and community opposition groups threatening legal action over perceived environmental violations. -
2000-09-07
Exhibit 138: Smith & Lowney Letter to Ecology Regarding Port Of Seattle NPDES Permit Violations and Third Runway Water Quality Certification
Fax cover sheet and two-page letter dated September 7, 2000 from Richard A. Poulin of Smith & Lowney, P.L.L.C. to Raymond Hellwig (Director, NW Regional Office, Washington Department of Ecology) and Tom Luster (Permit Coordination Unit, Ecology), on behalf of Citizens Against Seatac Expansion (CASE) and Waste Action Project (WAP). Letter transmits a 60-day Notice -
2000-09-05
EXH 369: Columbia Biological Assessments to Ecology — Des Moines Creek Flow Augmentation Facility Revised Plan
A biological assessments consultant, writing on behalf of the Airport Communities Coalition, critiques the Port of Seattle's revised plan to use City of Seattle drinking water to boost summer flows in Des Moines Creek near Sea-Tac Airport. The letter raises concerns that the plan inadequately addresses the toxicity of fluoride and residual chlorine in treated drinking water, which can harm fish and other aquatic life at very low levels. The consultant also warns that differences in temperature, pH, and dissolved oxygen between the makeup water and the creek could cause serious ecological damage if not corrected before augmentation begins.