EXH AR024709: Preliminary Draft Stormwater Quality Mgmt Plan STIA Master Plan Improvements App F Jul 1998

A July 1998 draft report prepared by Parametrix, Inc. for the Port of Seattle outlines a Stormwater Quality Management Plan for Sea-Tac International Airport's Master Plan improvements, including the proposed Third Runway. The plan documents why the Port chose bioswales over other Best Management Practice (BMP) alternatives, such as underground vaults, for managing stormwater runoff quality. The document was shared internally via email between Parametrix engineer Ken Ludwa and Jim Thomson for review and comment.

Notes

Email correspondence from Kenneth Ludwa (Parametrix, Inc., Kirkland WA) to Jim Thomson dated July 10, 1998, transmitting a draft Stormwater Quality Management Plan (Appendix F to the Preliminary Comprehensive Stormwater Management Plan) for Sea-Tac International Airport Master Plan Improvements, prepared for Port Of Seattle. The plan documents why the Port will use bioswales over other Best Management Practice (BMP) alternatives, including vaults, for the Third Runway project. Prepared by Parametrix, Inc., project number 55-2912-01(28). AR 024709–024711.

V V