2002-01-04
PCHB Doc 01-160: Proposed Order Granting ACC’s Motion for Summary Judgment Regarding the Absence of a Water Right
Proposed order from the Washington Pollution Control Hearings Board (PCHB No. 01-160) granting Airport Communities Coalition (ACC) motion for summary judgment on Issue No. 9(a) — whether a water right is required for implementation of the Port of Seattle’s low flow mitigation plan for the Third Runway Project. The Board found no reasonable assurance of -
2002-01-03
Exhibit 2054: Pre-Construction Hydrologic Monitoring Data, Master Plan Update Improvements, Seattle-Tacoma International Airport
Transmittal form from Parametrix, Inc. (Jim Kelley) to Ann Kenny, Department of Ecology Northwest Regional Office, dated January 3, 2002, transmitting pre-construction hydrologic monitoring data for wetlands near the Third Runway embankment at Seattle-Tacoma International Airport. Required by conditions D1g, D5, and D6g of Water Quality Certification #1996-4-02325 (Amended-1), September 23, 2001. Project Number 556-2912-01-01-41D, -
2002-01-02
PCHB AR005758: Port Of Seattle Petition for Review of PCHB Order Granting Motion to Stay Section 401 Certification (Third Runway)
Port Of Seattle petition for judicial review filed in Superior Court of Washington, Thurston County, challenging the Pollution Control Hearings Board (PCHB) Order Granting Motion to Stay the Effectiveness of Section 401 Certification related to the proposed third runway at Seattle-Tacoma International Airport (STIA). Petitioner Port Of Seattle represented by Linda J. Strout, Traci M. -
2002-01-02
EXH AR026605: Seattle Master Plan Update — Natural Resources Mitigation Plan Changes (Auburn Grading Plan, June 28, 2001)
This document summarizes changes made to the Port of Seattle Master Plan Update's Natural Resources Mitigation Plan to comply with a Water Quality Certification issued September 21, 2001. It outlines revisions to grading plans, culvert placements, wetland crossings, drainage controls, and planting schedules at the Auburn mitigation site, along with corresponding resolutions for each identified concern. The updates address issues such as water impoundment, erosion prevention, bald eagle habitat protection, and invasive species removal. -
2002-01-01
SR 509: Corridor Completion/I-5/South Access Road revised draft environmental impact statement and draft Section 4(f) evaluation
★ 32This January 2002 Revised Draft Environmental Impact Statement evaluates proposed improvements to SR 509 and I-5 in southwest King County, Washington, including a freeway extension to enhance southern access to Seattle-Tacoma International Airport. The study, prepared jointly by the Federal Highway Administration, WSDOT, Port of Seattle, King County, and the Cities of SeaTac and Des Moines, examines three build alternatives and a no-action alternative, differing in their proximity to Des Moines Creek Park and the airport runway protection zone. The proposed SR 509 extension corridor would be a minimum of 200 feet wide to accommodate general purpose and high-occupancy vehicle lanes in each direction. -
2002-01-01
Final Staff Evaluation for SEPA Environmental Checklist – Des Moines Creek Basin Restoration Projects
★The City of SeaTac conducted an environmental review of the Des Moines Creek Basin Restoration Projects, a multi-agency effort involving the cities of SeaTac and Des Moines, the Port of Seattle, and King County. The project aims to improve water quality, reduce flooding, and restore fish habitat along Des Moines Creek by building a new detention facility, installing a high-flow bypass pipe, and maintaining low-flow water levels during dry summer months. The city's staff determined that the project does not require a full Environmental Impact Statement, as it is not expected to have a significant adverse impact on the environment. -
2001-12-28
EXH AR024306: ACC Review Letter — Nov 2001 NRMP Wetland Mitigation Inadequacies, STIA Third Runway
A December 2001 letter from Azous Environmental Sciences challenges the Port of Seattle's wetland mitigation plan for the SeaTac Third Runway construction project, arguing that the plan inadequately offsets environmental damage to wetlands and streams. The letter contends that the Port has misclassified wetland 'enhancement' work at Vacca Farm as 'restoration,' inflating mitigation credits, and that the overall plan fails to meet no-net-loss standards required under Army Corps of Engineers regulations. -
2001-12-28
EXH AR027061: Ecology Acknowledgment of Waste Discharge Permit Application WA-002465-1 and Port Of Seattle NPDES Permit Renewal Submission for Sea-Tac Airport
AR027061. Two letters dated December 2001 regarding NPDES Permit WA-002465-1 for Seattle-Tacoma International Airport. First: Washington Department of Ecology (Tricia Miller, Permit Coordinator, Northwest Regional Office) acknowledges receipt of a waste discharge permit application from Michael Feldman, Director of Aviation Facilities, Port Of Seattle, received December 21, 2001; contact Ed Abbasi at (425) 649-7227. Second -
2001-12-27
Exhibit 2049: Port Of Seattle Construction Stormwater Monitoring Report Letter — STIA Water Quality Certification No. 1996-4-02325
Letter dated December 27, 2001 from Keith R. Smith, Water Resources Manager at Port Of Seattle Seattle-Tacoma International Airport, to Ms. Ann Kenny at Washington State Department of Ecology (Bellevue, WA 98088-5452), transmitting construction stormwater monitoring reports for September, October, and November 2001 under Section K.6 of Water Quality Certification No. 1996-4-02325 (Amended-1) and NPDES -
2001-12-26
EXH 295: ACC Interrogatories Nos. 1-19 and Requests for Production Nos. 1-6; Objections and Responses
The Port of Seattle submitted formal objections and responses to interrogatories filed by the Airport Communities Coalition (ACC) before Washington State's Pollution Control Hearings Board, related to a legal dispute over the Port's Third Runway Project. The case centered on the Department of Ecology's water quality certification issued under federal Clean Water Act Section 401. The document outlines the legal procedures governing the exchange of information between the parties during the hearing process.