TagPort Of Seattle(1845)
-
2000-12-01
EXH AR009210: Wetland Functional Assessment and Impact Analysis — Master Plan Update Improvements, Seattle-Tacoma International Airport
Wetland Functional Assessment and Impact Analysis prepared by Parametrix, Inc. (Kirkland, Washington) for Port Of Seattle, Seattle-Tacoma International Airport, December 2000, project number 556-2912-001 (03). Document filed in PCHB No. 01-133, received October 1, 2001 by Environmental Hearings Office, submitted as part of Port of Seattle’s Memo Opposing ACC’s Motion for Stay, Declaration of James -
2000-12-01
EXH AR049528: Port Of Seattle Seattle-Tacoma Airport Master Plan Update Low Streamflow Analysis
Low Streamflow Analysis prepared by Earth Tech, Inc. for Port Of Seattle as part of the Seattle-Tacoma Airport Master Plan Update, dated December 2000. Report covers existing streamflow conditions, watershed modeling of current and proposed conditions, hydrologic behavior of runway fill, non-hydrologic flows, secondary recharge effects, reserved stormwater release, and summary of low streamflow effects -
2000-12-01
EXH AR009646: Natural Resource Mitigation Plan — Master Plan Update Improvements, Seattle-Tacoma International Airport
Final Natural Resource Mitigation Plan prepared by Parametrix, Inc. for Port Of Seattle covering Master Plan Update Improvements at Seattle-Tacoma International Airport, dated December 2000. Filed as part of PCHB No. 01-133, Port of Seattle’s memo opposing ACC’s motion for stay, Volume 3 of 3, received by Environmental Hearings Office on October 1, 2001. Includes -
2000-12-01
EXH AR043961: Port Of Seattle Seattle-Tacoma Airport Master Plan Update Low Streamflow Analysis
Low Streamflow Analysis prepared by Earth Tech, Inc. for Port Of Seattle as part of the Seattle-Tacoma Airport Master Plan Update, dated December 2000. AR 043961. Report covers existing streamflow conditions, watershed modeling of current and proposed conditions, hydrologic behavior of runway fill, changes in non-hydrologic flows, effects of secondary recharge, reserved stormwater release, and -
2000-12-01
EXH AR049788: Supplement Biological Assessment — Master Plan Update Improvements, Seattle-Tacoma International Airport
Supplement Biological Assessment prepared by Parametrix, Inc. (December 2000) for the Federal Aviation Administration and Port Of Seattle for reinitiation and initiation of ESA Section 7 consultation on STIA Master Plan Update Improvements. AR 049788. Document covers hydrologic impacts and mitigation for Miller Creek, Walker Creek, and Des Moines Creek watersheds, including stormwater detention facility -
2000-12-01
EXH AR046366: Comprehensive Stormwater Management Plan — STIA Master Plan Update Improvements
Comprehensive Stormwater Management Plan (SMP) prepared by Parametrix, Inc. for the Port of Seattle, Seattle-Tacoma International Airport (STIA) Master Plan Update Improvements, December 2000, project number 556-2912-001(28). Document includes a July 2001 preface with replacement pages developed in response to Washington State Department of Ecology (Ecology) comments on Volumes 1 through 4. Covers stormwater management, -
2000-11-30
Exhibit 189: Draft Letter to the Consulting Engineers Council of Washington Regarding RCW 39.80 and Professional Wetland Scientist Selection for Sea-Tac Third Runway
Email from Ann Kenny (Ecology, Shorelands and Environmental Assistance Program) dated November 30, 2000, to Leslie Seffern (ATG) and Erik Stockdale, circulating a draft response letter to Bill Garrity, Executive Director of CECW (Consulting Engineers Council of Washington), regarding his November 22, 2000 letter challenging Ecology’s Request for Bid process for selecting a wetland consultant. -
2000-11-29
EXH AR029054: Sea-Tac Airport Third Runway 401 Permit Negotiations — Final Draft Meeting Notes, November 29, 2000
Final draft meeting notes from November 29, 2000 (9:30am–2:00pm) prepared by Kate Snider of Floyd & Snider Inc. for Sea-Tac Airport Third Runway 401 permit negotiations between Port Of Seattle (Elizabeth Leavitt, Michael Cheyne, Keith Smith) and Washington State Department of Ecology (Kevin Fitzpatrick, Ann Kenny, Dave Garland), with King County (David Masters, Kelly Whiting) -
2000-11-29
EXH AR046207: Subsurface Conditions Data Report, Phase 4 Fill, Third Runway Embankment, Sea-Tac Airport
Draft Subsurface Conditions Data Report for Phase 4 Fill of the Third Runway Embankment at Sea-Tac International Airport, prepared by Hart Crowser (HartCrowser) for Port of Seattle and HNTB, dated November 29, 2000, project J-4978-28, AR 046207. Report covers generalized geologic conditions, subsurface soil conditions, hydrogeologic conditions, field exploration methods including auger borings, Standard Penetration -
2000-11-27
Exhibit 106: Ecology Memorandum on Sea-Tac Third Runway Borrow Area 3 Wetland Impacts and Recommendations for Wetland Preservation
Memorandum dated November 27, 2000 from Dave Garland, NWRO Water Quality, Washington State Department of Ecology, to Ann Kenny and Kevin Fitzpatrick regarding Sea-Tac Third Runway Borrow Area 3 wetland impacts. Addresses Port Of Seattle proposal to excavate sand and gravel from Borrow Area 3 south of Sea-Tac Airport for Third Runway fill embankment. References