TagPort Of Seattle(1845)
-
2001-02-22
Exhibit 48: King County Letter to Ecology on Port Of Seattle Stormwater Management Plan Review for Sea-Tac Airport Master Plan Improvements
Letter dated February 22, 2001 from Pam Bissonnette, Director, King County Department of Natural Resources, to Ann Kenny, Senior Permit Specialist, Washington State Department of Ecology Northwest Regional Office, regarding King County’s technical review of the Port Of Seattle’s Comprehensive Stormwater Management Plan (SMP) for Master Plan Improvements at SeaTac International Airport. The letter references -
2001-02-22
Exhibit 2040: King County Letter to Ecology Reviewing Port Of Seattle Comprehensive Stormwater Management Plan for Sea-Tac Airport Master Plan Improvements
Letter dated February 22, 2001 from Pam Bissonnette, Director of King County Department of Natural Resources, to Ann Kenny, Senior Permit Specialist at Washington State Department of Ecology (DOE) Northwest Regional Office, regarding King County’s technical review of the Port Of Seattle’s Comprehensive Stormwater Management Plan (SMP) for Master Plan Improvements at SeaTac International Airport. -
2001-02-15
EXH AR018360: Sheldon & Associates Response to 2000 Public Notice Comments — Water Movement Through Fill and MSE Wall
Sheldon & Associates letter dated February 15, 2001, responding to public notice comments regarding the Seattle-Tacoma International Airport Masterplan Update Projects Section 404/401 Permits. Addresses movement of water through embankment fill and Mechanically Stabilized Earth (MSE) wall, drainage layer design to prevent excess pore pressures, rock underdrain clogging prevention using Group 1A filter material, shallow -
2001-02-08
EXH AR049869: Hart Crowser Letter — Comments on 404/401 Permit Applications for Port Of Seattle Third Runway MSE Retaining Walls
Letter dated February 8, 2001 from Hart Crowser Principal Geotechnical Engineer to U.S. Army Corps of Engineers (Jonathan Freedman) and Washington State Department of Ecology (Ann Kenny), documenting comments made at the January 26, 2001 public hearing on 404/401 permit applications J-4978-30-06. Comments focus on the design and independent technical review of mechanically stabilized earth -
2001-01-25
EXH AR049866: Letter from Peter M. Douglass, Technical Review Board Facilitator, Regarding Third Runway Embankment Fill and MSE Wall Design Review
Letter dated January 25, 2001 from Peter M. Douglass, P.E. (Technical Review Board Facilitator) to U.S. Army Corps of Engineers (Jonathan Freedman, Project Manager) and Washington State Department of Ecology (Ann Kenny, Environmental Specialist) summarizing findings of an independent expert panel convened by Port Of Seattle to review embankment fill and mechanically stabilized earth (MSE) -
2001-01-17
EXH AR034299: Amendment and Erratum to Second Revised Public Notice — Port Of Seattle Permit Application 1996-4-02325
U.S. Army Corps of Engineers Public Notice (Reference 1996-4-02325, dated 17 January 2001) amending the second revised public notice dated 27 December 2000 for a Department of the Army Section 404 Clean Water Act permit application by Port Of Seattle. Project located in Miller Creek, Walker Creek, and Des Moines Creek watersheds and wetlands at -
2001-01-11
EXH AR049822: Port Of Seattle Transmittal and CZM Consistency Certification for Third Runway Construction at Sea-Tac Airport
Transmittal record dated January 11, 2001 from Elizabeth Leavitt, Environmental Manager, Port Of Seattle Aviation Environmental Group, to Ann Kenny, Department of Ecology, transmitting a revised Coastal Zone Management (CZM) Consistency Statement for Federal Project Number 96-4-02325. The CZM certification covers construction of a third runway and other improvements at Seattle-Tacoma International Airport, including filling -
2001-01-11
Exhibit 2062: Port Of Seattle Transmittal and CZM Consistency Certification for Third Runway at Sea-Tac Airport
Port of Seattle transmittal letter dated January 11, 2001 from Environmental Manager Elizabeth Leavitt to Ann Kenny at the Washington State Department of Ecology, transmitting a revised Coastal Zone Management (CZM) Consistency Statement (Federal Project Number 96-4-02325). The CZM certification covers construction of a third runway and other improvements at Seattle-Tacoma International Airport, including filling -
2001-01-08
Exhibit 2137: Examining the Effects of Runway Deicing on Dissolved Oxygen in Receiving Waters: Results of the 1999-2000 Winter Season — Volume 2, Technical Appendices
Port of Seattle technical appendices (Volume 2) to the study examining effects of runway deicing on dissolved oxygen (DO) in receiving waters at Seattle-Tacoma International Airport, covering the 1999-2000 winter season. Includes QA/QC and field methods for Hydrolab instruments, Northwest Ponds DO profile data collection, continuous monitoring data assessment, tracer plots for each monitoring location, -
2001-01-03
EXH AR017292: Email from Chung K. Yee to Kevin Fitzpatrick re Third Runway Fill and Copper Contamination
Email dated January 3, 2001 from Chung K. Yee to Kevin Fitzpatrick regarding copper contamination in fill soil samples from a proposed Third Runway fill source site. Beth Clark questioned use of Method B protection of groundwater standard (100X groundwater standard) for copper samples testing 70–100 mg/kg. Yee reaffirmed the Method B standard and disagreed