2000-12-08
Sea-Tac Airport third runway 401 permit negotiations meeting notes summary
This document is a meeting notes summary compiled by Floyd & Snider Inc. covering discussions between the Port of Seattle and the Washington Department of Ecology regarding a potential 401 Permit for the proposed Stormwater Master Plan Update and third runway construction at Sea-Tac Airport. It includes a master list of technical issues requiring resolution, -
2000-12-08
EXH AR029087: Sea-Tac Airport Third Runway 401 Permit Negotiations — Final Draft Meeting Notes, December 8, 2000
Final draft meeting notes prepared by Kate Snider of Floyd & Snider Inc. from the Sea-Tac Airport Third Runway 401 Permit Negotiations meeting held December 8, 2000. Attendees included representatives from Washington State Department of Ecology (Ray Hellwig, Kevin Fitzpatrick, Ann Kenny, Dave Garland), Port Of Seattle (Elizabeth Leavitt, Michael Cheyne, Keith Smith), King County -
2000-12-08
EXH AR029093: Sea-Tac Airport Third Runway 401 Permit Negotiations Meeting Notes Summary, October–December 2000
Floyd & Snider Inc. meeting notes summary covering Sea-Tac Airport Third Runway 401 Permit negotiations between Port Of Seattle and Washington State Department of Ecology (Ecology), October 2 through December 8, 2000. Documents master list of 401 Permit technical issues including Stormwater Master Plan detention sizing, basin acreage discrepancies, HSPF and KCRTS hydrological models, IWS -
2000-12-08
EXH AR029120: Sea-Tac Airport Third Runway 401 Permit Negotiations — Meeting Notes Summary (Wetland Issues Only), October–December 2000
Floyd & Snider Inc. meeting notes summary covering 401 Permit negotiations between Port Of Seattle and Washington State Department of Ecology (Ecology) regarding the Sea-Tac Airport Third Runway and Stormwater Master Plan Update, October 2 through December 8, 2000. Document covers wetland issues only and includes a master list of 401 technical issues with resolution -
2000-12-07
Seattle-Tacoma International Airport Ground Water Study Response Letter
A letter from Port of Seattle to the Washington Department of Ecology responding to questions raised in a November 16, 2000 meeting regarding the Seattle-Tacoma International Airport Ground Water Study under Agreed Order #97TC-122. The letter addresses task completion status for various items including hydrogeological research, contamination site identification, well database compilation, and ground water -
2000-12-04
EXH AR049659: Geotechnical Engineering Analyses and Recommendations — Third Runway Embankment, Sea-Tac Airport
Hart Crowser draft geotechnical engineering report (J-4978-28) prepared for HNTB, December 4, 2000, addressing the Third Runway embankment at Seattle-Tacoma International Airport, SeaTac, Washington. Covers embankment fill materials, slope stability analyses, foundation instability, subgrade improvements, liquefaction analysis (175-year and 475-year seismic events), FLAC deformation modeling, MSE walls (North Satellite Area, West, South), Phase 4 fill, -
2000-12-01
EXH AR047400: Wetland Delineation Report, Master Plan Update Improvements, Seattle-Tacoma International Airport
Wetland Delineation Report prepared by Parametrix, Inc. for Port Of Seattle, Seattle-Tacoma International Airport (Sea-Tac Airport), December 2000, project number 556-2912-001 (41). Report covers wetland delineation for Master Plan Update Improvements including North Employee Parking Lot, Runway Safety Area Extension, Third Runway project area, Borrow Areas 1 and 3, South Aviation Support Area (SASA)/Tyee Valley -
2000-12-01
EXH AR048122: Wetland Functional Assessment and Impact Analysis, Master Plan Update Improvements, Sea-Tac Airport
Wetland Functional Assessment and Impact Analysis prepared by Parametrix, Inc. for Port Of Seattle, Seattle-Tacoma International Airport, December 2000 (project number 556-2912-001). AR 048122. Covers wetland delineation, functional assessment, and impact analysis for Master Plan Update Improvements including Runway Safety Areas, relocation of South 154th Street, new Third Runway, borrow areas, and South Aviation Support -
2000-12-01
EXH AR048591: Natural Resource Mitigation Plan, Master Plan Update Improvements, STIA
Final Natural Resource Mitigation Plan prepared by Parametrix, Inc. for Port Of Seattle, Seattle-Tacoma International Airport Master Plan Update Improvements, December 2000 (AR 048591, project 556-2912-001). Covers wetland delineation and descriptions, Miller Creek Basin, Des Moines Creek Basin, Gilliam Creek, South Aviation Support Area (SASA), runway safety area extensions, South 154th Street relocation, on-site borrow -
2000-12-01
Pacific Coast salmon essential fish habitat assessment: Master Plan Update Improvements, Seattle-Tacoma International Airport
This report is an Essential Fish Habitat (EFH) assessment prepared for the Federal Aviation Administration and Port of Seattle regarding Master Plan Update Improvements at Seattle-Tacoma International Airport. It evaluates impacts on Pacific Coast salmon species (Chinook, Coho, and Pink) in the Miller Creek, Des Moines Creek, and Green River basins, as well as marine