2001-05-03
EXH AR018225: Draft Memorandum — Outstanding Issues for Port Resolution (Third Runway Natural Resource Mitigation Plan)
Draft memorandum dated April 25, 2001 from Katie L. Walter of Shannon & Wilson, Inc. to Ann Kenny and Erik Stockdale of Washington Department of Ecology, regarding outstanding issues for Port Of Seattle resolution on the Natural Resource Mitigation Plan for Sea-Tac Airport proposed Third Runway. Forwarded by Ann Kenny to Raymond Hellwig on May -
2001-05-01
Exhibit 2211: Email from Scott Bender to Katie Walter Regarding Hydrologic Impacts to Wetland 39
Email dated 5/1/01 from Scott Bender to Katie Walter transmitting an attached memo describing Bender’s opinions about hydrologic impacts to Wetland 39. AR 034818, ECY00021952, Exhibit-2211. Document relates to Ecology environmental review processes involving wetland hydrology assessment. -
2001-05-01
EXH AR050379: Wetland Photographs and Maps — Master Plan Update Improvements, Seattle-Tacoma International Airport
Wetland photographs and maps prepared by Parametrix, Inc. for the Port Of Seattle, documenting wetlands and other Waters of the U.S. in the Miller Creek Basin near Seattle-Tacoma International Airport (STIA) as part of the Master Plan Update Improvements. AR 050379–050381. Includes photo point map showing delineated wetlands verified and not verified by ACOE (Army -
2001-05-01
EXH AR031166: Wetland Photographs and Maps — Master Plan Update Improvements, Sea-Tac Airport
Wetland photographs and maps prepared by Parametrix, Inc. for Port Of Seattle, May 2001, as part of the Master Plan Update Improvements for Seattle-Tacoma International Airport. Document AR031166 includes a Wetlands Atlas covering North and West Sides of Sea-Tac Airport, with 15 map sections showing surveyed wetland boundaries, estimated wetland boundaries, and other estimated or -
2001-05-01
EXH AR029163: 401 Permit Decision-Making, Sea-Tac Airport Third Runway — Technical Meeting Notes, May 1, 2001
Final draft meeting notes from a 401 Permit Decision-Making technical meeting on May 1, 2001, regarding Sea-Tac International Airport Third Runway, prepared by Rachel McCrea of Floyd & Snider Inc. Attendees included John Drabek and Ann Kenny (Dept. of Ecology), Keith Smith (Port Of Seattle), Kelly Whiting (King County), Paul Fendt and Tom Atkins (Parametrix), -
2001-04-30
EXH 233: NHC Letter to Ecology — NPDES Permit Modification STIA IWS Design Criteria Detention Standards
In this April 2001 letter, Northwest Hydraulic Consultants raised technical concerns on behalf of the Airport Communities Coalition regarding a proposed NPDES permit modification for Seattle-Tacoma International Airport. The firm identified two key issues: a lack of clear, enforceable design criteria for stormwater overflows from the airport's integrated wastewater system (IWS), and an inconsistency between the permit's stormwater detention standards and the stricter standards sought under Section 401 Certification for the Third Runway and Master Plan Update projects. The consultants recommended that the permit be revised and republished for public comment to address these gaps and ensure consistent, enforceable stormwater management requirements. -
2001-04-30
EXH AR050083: Response to Comments — Master Plan Update Improvements at Seattle-Tacoma International Airport, Permit 1996-4-02325
Port of Seattle response to agency and public comments on Section 404 Clean Water Act permit application (JARPA, reference 1996-4-02325) for Master Plan Update improvements at Seattle-Tacoma International Airport. Covers U.S. Army Corps of Engineers public notice history (December 19, 1997; September 30, 1999; December 27, 2000), wetland fill acreages, Miller Creek channel relocation, Highline -
2001-04-30
EXH AR050378: Response to Comments — Master Plan Update Improvements at Seattle-Tacoma International Airport, Permit 1996-4-02325
Port Of Seattle response to agency and public comments on Section 404 Clean Water Act permit application (JARPA, permit 1996-4-02325) for Master Plan Update improvements at Seattle-Tacoma International Airport. Document AR050378 covers comments received following the December 27, 2000 second revised public notice issued by the U.S. Army Corps of Engineers. Responds to Tom Luster, -
2001-04-30
EXH AR028046: Port Of Seattle Memo — Black River Quarry TPH and Metals Testing for Third Runway Embankment
Port Of Seattle internal memo dated 04/30/01 from Beth Clark to Paul Agid (cc: Elizabeth Leavitt, Jim Thomson) regarding rock aggregate imported from the Black River Quarry (King County, Washington), owned by Stoneway Rock & Recycling, used in the Third Runway embankment during August–October 2000. Documents AMEC and City Transfer Inc. (CTI) chemical testing for -
2001-04-30
EXH AR023204: Memo — Black River Quarry Aggregate Testing (TPH & Metals)
A Port of Seattle memo from April 2001 summarizes environmental testing of rock aggregate imported from the Black River Quarry for use in the Third Runway embankment project. Testing by environmental consultant AMEC found petroleum hydrocarbons (TPH) and elevated copper levels in some samples, prompting operational changes at the quarry including equipment cleaning and discarding the first hundred tons of rock after asphalt recycling operations. Follow-up testing confirmed that contaminant levels fell below MTCA Method A cleanup standards, and the Port halted material imports from the quarry in mid-October 2000 pending resolution.