TagACC(1548)
-
2000-12-01
EXH AR047400: Wetland Delineation Report, Master Plan Update Improvements, Seattle-Tacoma International Airport
Wetland Delineation Report prepared by Parametrix, Inc. for Port Of Seattle, Seattle-Tacoma International Airport (Sea-Tac Airport), December 2000, project number 556-2912-001 (41). Report covers wetland delineation for Master Plan Update Improvements including North Employee Parking Lot, Runway Safety Area Extension, Third Runway project area, Borrow Areas 1 and 3, South Aviation Support Area (SASA)/Tyee Valley -
2000-12-01
EXH AR043961: Port Of Seattle Seattle-Tacoma Airport Master Plan Update Low Streamflow Analysis
Low Streamflow Analysis prepared by Earth Tech, Inc. for Port Of Seattle as part of the Seattle-Tacoma Airport Master Plan Update, dated December 2000. AR 043961. Report covers existing streamflow conditions, watershed modeling of current and proposed conditions, hydrologic behavior of runway fill, changes in non-hydrologic flows, effects of secondary recharge, reserved stormwater release, and -
2000-12-01
EXH AR048122: Wetland Functional Assessment and Impact Analysis, Master Plan Update Improvements, Sea-Tac Airport
Wetland Functional Assessment and Impact Analysis prepared by Parametrix, Inc. for Port Of Seattle, Seattle-Tacoma International Airport, December 2000 (project number 556-2912-001). AR 048122. Covers wetland delineation, functional assessment, and impact analysis for Master Plan Update Improvements including Runway Safety Areas, relocation of South 154th Street, new Third Runway, borrow areas, and South Aviation Support -
2000-12-01
EXH 263: Pacific Coast Salmon Essential Fish Habitat Assessment, STIA Master Plan Update
This December 2000 report assesses the impact of Seattle-Tacoma International Airport's Master Plan Update improvements on Pacific Coast salmon Essential Fish Habitat (EFH) in nearby waterways, including Miller Creek, Des Moines Creek, and the Green River Basin. Prepared by Parametrix, Inc. for the Federal Aviation Administration and the Port of Seattle, it evaluates water quality, aquatic habitat, and hydrological effects of airport expansion on local salmon species such as Chinook, Coho, and Pink salmon. The report also outlines conservation and mitigation measures proposed to offset adverse effects on salmon habitat in the airport's surrounding watersheds. -
2000-12-01
EXH AR048591: Natural Resource Mitigation Plan, Master Plan Update Improvements, STIA
Final Natural Resource Mitigation Plan prepared by Parametrix, Inc. for Port Of Seattle, Seattle-Tacoma International Airport Master Plan Update Improvements, December 2000 (AR 048591, project 556-2912-001). Covers wetland delineation and descriptions, Miller Creek Basin, Des Moines Creek Basin, Gilliam Creek, South Aviation Support Area (SASA), runway safety area extensions, South 154th Street relocation, on-site borrow -
2000-12-01
EXH AR049528: Port Of Seattle Seattle-Tacoma Airport Master Plan Update Low Streamflow Analysis
Low Streamflow Analysis prepared by Earth Tech, Inc. for Port Of Seattle as part of the Seattle-Tacoma Airport Master Plan Update, dated December 2000. Report covers existing streamflow conditions, watershed modeling of current and proposed conditions, hydrologic behavior of runway fill, non-hydrologic flows, secondary recharge effects, reserved stormwater release, and summary of low streamflow effects -
2000-12-01
EXH AR021132: Comprehensive Stormwater Management Plan — Master Plan Update Improvements, STIA
This December 2000 report by Parametrix, Inc. for the Port of Seattle presents a Comprehensive Stormwater Management Plan for Master Plan Update improvements at Seattle-Tacoma International Airport. It maps the airport's drainage basins, surrounding watersheds (including the Duwamish River, Des Moines Creek, and Miller Creek watersheds), and identifies pollution-generating and non-pollution-generating surfaces across the airport property. The plan outlines water quality treatment strategies for existing and proposed impervious surfaces to manage stormwater runoff from airport operations. -
2000-12-01
EXH AR049788: Supplement Biological Assessment — Master Plan Update Improvements, Seattle-Tacoma International Airport
Supplement Biological Assessment prepared by Parametrix, Inc. (December 2000) for the Federal Aviation Administration and Port Of Seattle for reinitiation and initiation of ESA Section 7 consultation on STIA Master Plan Update Improvements. AR 049788. Document covers hydrologic impacts and mitigation for Miller Creek, Walker Creek, and Des Moines Creek watersheds, including stormwater detention facility -
2000-11-30
Exhibit 189: Draft Letter to the Consulting Engineers Council of Washington Regarding RCW 39.80 and Professional Wetland Scientist Selection for Sea-Tac Third Runway
Email from Ann Kenny (Ecology, Shorelands and Environmental Assistance Program) dated November 30, 2000, to Leslie Seffern (ATG) and Erik Stockdale, circulating a draft response letter to Bill Garrity, Executive Director of CECW (Consulting Engineers Council of Washington), regarding his November 22, 2000 letter challenging Ecology’s Request for Bid process for selecting a wetland consultant. -
2000-11-29
EXH AR029054: Sea-Tac Airport Third Runway 401 Permit Negotiations — Final Draft Meeting Notes, November 29, 2000
Final draft meeting notes from November 29, 2000 (9:30am–2:00pm) prepared by Kate Snider of Floyd & Snider Inc. for Sea-Tac Airport Third Runway 401 permit negotiations between Port Of Seattle (Elizabeth Leavitt, Michael Cheyne, Keith Smith) and Washington State Department of Ecology (Kevin Fitzpatrick, Ann Kenny, Dave Garland), with King County (David Masters, Kelly Whiting)