EXH AR021132: Comprehensive Stormwater Management Plan — Master Plan Update Improvements, STIA

This December 2000 report by Parametrix, Inc. for the Port of Seattle presents a Comprehensive Stormwater Management Plan for Master Plan Update improvements at Seattle-Tacoma International Airport. It maps the airport's drainage basins, surrounding watersheds (including the Duwamish River, Des Moines Creek, and Miller Creek watersheds), and identifies pollution-generating and non-pollution-generating surfaces across the airport property. The plan outlines water quality treatment strategies for existing and proposed impervious surfaces to manage stormwater runoff from airport operations.

Notes

Comprehensive Stormwater Management Plan prepared by Parametrix, Inc. for Port Of Seattle covering Master Plan Update Improvements at Seattle-Tacoma International Airport (STIA), dated December 2000. Exhibit AR021132 filed in PCHB Third Runway EIS proceedings. Document includes Figure 4-3 (STIA and Surrounding Development 1994, showing watershed boundaries, subwatershed boundaries, existing 1994 drainage subbasins, impervious areas, constructed water features, water bodies including Tub Lake, Lake Reba, Lora Lake, Bow Lake) and Figure 4-4 (Water Quality Treatment for Existing Surfaces), depicting Duwamish River Watershed, Des Moines Creek Watershed, Miller Creek Watershed, Puget Sound drainage basins, industrial wastewater system (IWS) lagoons, Northwest Ponds, Tyee Pond, Miller Creek Detention Facility, and pollution-generating impervious surfaces. Stormwater drainage subbasins labeled SDN, SDM, SDE, SDS, IWS, and others shown across STIA property.

V V