TagPollution Control Hearings Board(1532)
-
2001-04-30
EXH AR050083: Response to Comments — Master Plan Update Improvements at Seattle-Tacoma International Airport, Permit 1996-4-02325
Port of Seattle response to agency and public comments on Section 404 Clean Water Act permit application (JARPA, reference 1996-4-02325) for Master Plan Update improvements at Seattle-Tacoma International Airport. Covers U.S. Army Corps of Engineers public notice history (December 19, 1997; September 30, 1999; December 27, 2000), wetland fill acreages, Miller Creek channel relocation, Highline -
2001-04-30
EXH AR050378: Response to Comments — Master Plan Update Improvements at Seattle-Tacoma International Airport, Permit 1996-4-02325
Port Of Seattle response to agency and public comments on Section 404 Clean Water Act permit application (JARPA, permit 1996-4-02325) for Master Plan Update improvements at Seattle-Tacoma International Airport. Document AR050378 covers comments received following the December 27, 2000 second revised public notice issued by the U.S. Army Corps of Engineers. Responds to Tom Luster, -
2001-04-30
EXH AR028046: Port Of Seattle Memo — Black River Quarry TPH and Metals Testing for Third Runway Embankment
Port Of Seattle internal memo dated 04/30/01 from Beth Clark to Paul Agid (cc: Elizabeth Leavitt, Jim Thomson) regarding rock aggregate imported from the Black River Quarry (King County, Washington), owned by Stoneway Rock & Recycling, used in the Third Runway embankment during August–October 2000. Documents AMEC and City Transfer Inc. (CTI) chemical testing for -
2001-04-30
Black River Quarry Memo
A Port of Seattle internal memo summarizing chemical testing results for rock aggregate imported from Black River Quarry (owned by Stoneway Rock & Recycling) for use in the Third Runway embankment during August through October 2000. The memo covers testing for petroleum hydrocarbons (TPH) and metals, noting initial exceedances of MTCA Method A standards for -
2001-04-30
Comments on NPDES permit modification for Seattle-Tacoma International Airport
Northwest Hydraulic Consultants, retained by the Airport Communities Coalition (ACC), submitted comments on the proposed modification to NPDES Permit No. WA-002465-1 for the Port of Seattle’s Sea-Tac International Airport. The letter raises two concerns: the lack of clear design criteria for stormwater flows that trigger untreated wastewater overflows under Permit Conditions S1.E and S5.B, and -
2001-04-26
EXH AR034813: Email and Meeting Notes — Jim Kelley and Katie Walter, STIA Clarifications, April 12, 2001
Email from Jim Kelley (Parametrix, Inc.) to Katie Walter (klw@shanwil.com) dated April 26, 2001, transmitting preliminary draft meeting notes from an April 12, 2001 meeting regarding STIA mitigation site clarifications. The 20-item meeting notes cover Auburn mitigation site hydroseeding, water levels, radius of influence on adjacent wetlands, biofiltration on NRMP Sheet 3.3, dispersal trench elevation -
2001-04-25
EXH AR029160: Final Draft Meeting Notes – Low Flow Analysis, Sea-Tac Airport Third Runway, April 25, 2001
Final draft meeting notes from April 25, 2001 low flow analysis technical meeting for the Sea-Tac International Airport Third Runway 401 Permit Decision-Making process. Attendees included Ann Kenny (Dept. of Ecology), Kelly Whiting (King County), Keith Smith (Port of Seattle), Joe Brascher (AquaTerra), Peter Schwartzman (Pacific Groundwater Group), and Kate Snider (Floyd & Snider Inc.). -
2001-04-24
EXH AR028160: Memorandum for Record — Corps Review of Draft Response to Comments from Azous and Sheldon on Third Runway
Memorandum for Record (MFR) dated 24 April 2001 from CENWS-OD-RG summarizing telephone conversations with Elizabeth Leavitt and Jim Kelley (Port of Seattle consultants) on 9-10 April 2001 regarding the Army Corps of Engineers’ review of the Port’s draft responses to letters from Azous and Sheldon concerning the Third Runway project at Sea-Tac Airport. Corps comments -
2001-04-24
Memorandum for Record: Summary of Meeting Regarding Port’s Submittal of Requested Information
A memorandum from Muffy Walker documenting a meeting held on 16 April 2001 with Elizabeth Leavitt and Jim Kelley to discuss the Port’s submittal of additional information. The memo covers the Port’s approach to cumulative impacts assessment using aerial photos from the 1930s and soil surveys, and lists four engineering reports and drawings submitted regarding -
2001-04-23
EXH AR029157: 401 Permit Decision-Making, Sea-Tac International Airport Third Runway — Technical Meeting Notes, April 23, 2001
Final draft meeting notes prepared by Rachel McCrea of Floyd & Snider Inc. for a 401 Permit Decision-Making technical meeting held April 23, 2001, regarding Sea-Tac International Airport Third Runway. Attendees included representatives from Washington State Department of Ecology (John Drabek, Ann Kenny), Port of Seattle (Keith Smith), King County (Kelly Whiting), HNTB (Alan Black),