TagPollution Control Hearings Board(1532)
-
2001-05-09
EXH AR029170: 401 Permit Decision-Making Sea-Tac Airport Third Runway — Low Flow Analysis Meeting Notes, May 9, 2001
Final draft meeting notes prepared by Kate Snider (Floyd & Snider Inc.) from a May 9, 2001 technical meeting on Low Flow Analysis for the Sea-Tac Airport Third Runway 401 Permit Decision-Making process. Attendees included Ann Kenny and Dave Garland (Dept. of Ecology), Kelly Whiting (King County), Keith Smith (Port Of Seattle), Joe Brascher (AquaTerra), -
2001-05-07
EXH AR029167: 401 Permit Decision-Making Sea-Tac Airport Third Runway Technical Meeting Final Draft Minutes, May 7, 2001
Final draft meeting notes prepared by Rachel McCrea, Floyd & Snider Inc., for the 401 Permit Decision-Making Technical Meeting on Sea-Tac International Airport Third Runway, May 7, 2001. Attendees included John Drabek and Ann Kenny (Dept. of Ecology), Keith Smith (Port Of Seattle), Kelly Whiting (King County), Felix Kristanovich (Foster Wheeler), Paul Fendt and Tom -
2001-05-05
Exhibit 112: Ecology NWRO Memorandum on Slice Model Integration for Sea-Tac Airport Master Plan Update Low Streamflow Analysis
Memorandum dated May 5, 2001 from Dave Garland, Ecology NWRO Water Quality Nonpoint Unit, to Ray Hellwig and Ann Kenny, through Kevin Fitzpatrick, documenting an April 20, 2001 meeting with Pony Ellingson and Crispin Prahl of Pacific Groundwater Group (PGG) regarding ‘slice model integration’ for the proposed 3rd runway embankment at Sea-Tac Airport. Discusses Hydrus -
2001-05-05
Exhibit 2098: Ecology Memorandum — Report of Discussion on Slice Model Integration Relating to Sea-Tac Airport Master Plan Update Low Streamflow Analysis
Memorandum dated May 5, 2001 from Dave Garland, Ecology NWRO Water Quality Nonpoint Unit, to Ray Hellwig and Ann Kenny, through Kevin Fitzpatrick, documenting an April 20, 2001 meeting with Pony Ellingson and Crispin Prahl of Pacific Groundwater Group (PGG) regarding the ‘slice model’ (PGG, June 2000) integration methods for estimating 3rd runway embankment drainage -
2001-05-03
Port Of Seattle AirCraft Deicing Report April 1, 2000 – March 31, 2001
This is a multi-page Port of Seattle Aircraft Deicing Report covering the period from April 1, 2000 to March 31, 2001. The report tracks deicing activity by date and airline at Sea-Tac Airport, recording quantities of deicing fluid (BAC and GalGlycol) used by various carriers including Alaska Airlines, American, and Alaska. The report spans 15 -
2001-05-03
EXH AR018225: Draft Memorandum — Outstanding Issues for Port Resolution (Third Runway Natural Resource Mitigation Plan)
Draft memorandum dated April 25, 2001 from Katie L. Walter of Shannon & Wilson, Inc. to Ann Kenny and Erik Stockdale of Washington Department of Ecology, regarding outstanding issues for Port Of Seattle resolution on the Natural Resource Mitigation Plan for Sea-Tac Airport proposed Third Runway. Forwarded by Ann Kenny to Raymond Hellwig on May -
2001-05-01
Exhibit 2211: Email from Scott Bender to Katie Walter Regarding Hydrologic Impacts to Wetland 39
Email dated 5/1/01 from Scott Bender to Katie Walter transmitting an attached memo describing Bender’s opinions about hydrologic impacts to Wetland 39. AR 034818, ECY00021952, Exhibit-2211. Document relates to Ecology environmental review processes involving wetland hydrology assessment. -
2001-05-01
EXH AR050379: Wetland Photographs and Maps — Master Plan Update Improvements, Seattle-Tacoma International Airport
Wetland photographs and maps prepared by Parametrix, Inc. for the Port Of Seattle, documenting wetlands and other Waters of the U.S. in the Miller Creek Basin near Seattle-Tacoma International Airport (STIA) as part of the Master Plan Update Improvements. AR 050379–050381. Includes photo point map showing delineated wetlands verified and not verified by ACOE (Army -
2001-05-01
EXH AR031166: Wetland Photographs and Maps — Master Plan Update Improvements, Sea-Tac Airport
Wetland photographs and maps prepared by Parametrix, Inc. for Port Of Seattle, May 2001, as part of the Master Plan Update Improvements for Seattle-Tacoma International Airport. Document AR031166 includes a Wetlands Atlas covering North and West Sides of Sea-Tac Airport, with 15 map sections showing surveyed wetland boundaries, estimated wetland boundaries, and other estimated or -
2001-05-01
EXH AR029163: 401 Permit Decision-Making, Sea-Tac Airport Third Runway — Technical Meeting Notes, May 1, 2001
Final draft meeting notes from a 401 Permit Decision-Making technical meeting on May 1, 2001, regarding Sea-Tac International Airport Third Runway, prepared by Rachel McCrea of Floyd & Snider Inc. Attendees included John Drabek and Ann Kenny (Dept. of Ecology), Keith Smith (Port Of Seattle), Kelly Whiting (King County), Paul Fendt and Tom Atkins (Parametrix),