TagPollution Control Hearings Board(1532)
-
2001-08-01
EXH AR018500: Draft 401 Conditions — Auburn Mitigation Site Revisions and Performance Standards
Deliberative memorandum dated August 1, 2001 from Katie Walter (KLW@shanwil.com) to Ann Kenny, Washington State Department of Ecology, re Draft 401 Conditions for Auburn Mitigation Site revisions. Covers culvert placement issues in revised grading plan (June 28, 2001) at northwest corner and south central portion of site, drainage swale, maintenance pathway, and southwestern basin. Performance -
2001-08-01
EXH AR1278: Sand and Gravel Stormwater Pollution Prevention Plan — Third Runway Project Borrow Areas 3 and 4, Seattle-Tacoma International Airport
Sand and Gravel Stormwater Pollution Prevention Plan (SWPPP) prepared by Parametrix, Inc. for Port of Seattle, covering Borrow Areas 3 and 4 of the Third Runway Project at Seattle-Tacoma International Airport. Prepared August 2001, approved by Michael Feldman, Director of Aviation Facilities, Port of Seattle. Document checked by Paul Fendt, P.E. and prepared by Julie -
2001-08-01
EXH AR050792: Supplemental Information — Cumulative Impacts to Wetlands and Streams, STIA Master Plan Update Improvements
Parametrix, Inc. report prepared for Port Of Seattle on cumulative impacts to wetlands and streams from Seattle-Tacoma International Airport Master Plan Update improvements, August 2001 (AR 050792, Exhibit 1267). Covers land use changes in Miller Creek and Des Moines Creek watersheds, wetland inventories, soil survey maps, aerial photograph analysis, stream conditions and fish habitat in -
2001-08-01
EXH AR019520: Workbook Tools Calculating Soil & Groundwater Cleanup Levels MTCA User’s Guide
This 2001 User's Guide from the Washington State Department of Ecology describes software workbook tools (MTCASGL and MTCATPH) designed to help calculate soil and ground water cleanup levels under the Model Toxics Control Act. The guide covers installation, technical requirements, and step-by-step instructions for entering site-specific data such as chemical properties, exposure parameters, and hydrogeological characteristics. Note that while this document addresses environmental cleanup standards, it does not appear to be directly related to Sea-Tac Airport noise policy. -
2001-08-01
EXH AR017586: Water Quality Certification #1996-4-02325 Draft, Page 16-17 — Operational Stormwater Requirements for STIA
Draft Water Quality Certification #1996-4-02325, pages 16-17 of 23, dated August 2001, issued by Washington State Department of Ecology regarding Port Of Seattle Seattle-Tacoma International Airport (STIA). Covers operational stormwater requirements including the approved Comprehensive Stormwater Management Plan (CSMP) Volumes 1-4 December 2000 as revised July 2001, retrofitting of stormwater management facilities, discharge of operational -
2001-08-01
EXH 244: Declaration William A. Rozeboom Supporting ACC Motion for Stay PCHB No. 01-133 Third Runway Stormwater Low Flow Impacts
A declaration by civil engineer William A. Rozeboom, filed with Washington's Pollution Control Hearings Board, raises concerns about the environmental impact of Seattle-Tacoma International Airport's Third Runway construction project. Rozeboom, a stormwater and hydraulics expert retained by the Airport Communities Coalition, warns that the project will reduce low streamflows in Des Moines, Miller, and Walker Creeks during summer months due to increased impervious surfaces and changes to the industrial wastewater system. While the July 2001 Stormwater Management Plan addresses peak flood flows, Rozeboom argues it fails to adequately assess or mitigate the project's impact on low-flow stream conditions. -
2001-08-01
EXH AR046206: Duplicate of August 2001, See Exhibit No. 1267
Administrative Record document AR046206 noting this is a duplicate of an August 2001 document, with reference to Exhibit No. 1267. The document contains no substantive content beyond the cross-reference notation. -
2001-08-01
EXH AR032547: Volume V Runoff Treatment BMPs — Enhanced Treatment Menu and Basic Treatment Menu (Chapter 3, Sections 3.4–3.5)
Exhibit AR032547 from Washington State Department of Ecology (Ecology), Volume V – Runoff Treatment BMPs, August 2001. Covers phosphorus removal treatment trains (Table 3.1), Enhanced Treatment Menu (Section 3.4) and Basic Treatment Menu (Section 3.5) for stormwater management. Specifies requirements for industrial, commercial, multi-family project sites, arterials and highways discharging to fish-bearing streams or lakes. -
2001-08-01
EXH 2237 (AR 034850): Workbook Tools Calculating Soil & Groundwater Cleanup Levels MTCA — User’s Guide
This 2001 User's Guide from the Washington State Department of Ecology explains how to use spreadsheet workbook tools (MTCASGL and MTCATPH) to calculate soil and groundwater cleanup levels under the Model Toxics Control Act. The guide covers how to enter site-specific data—such as chemical properties, exposure parameters, and hydrogeological characteristics—to determine safe contamination thresholds. It is intended for environmental cleanup professionals working on hazardous substance remediation in Washington State. -
2001-08-01
EXH AR017820: Email Chain — Ecology Internal Communications on Third Runway Decision Announcement Strategy
Internal email chain dated August 1, 2001 among Washington Department of Ecology staff Thomas Fitzsimmons, Sheryl Hutchison, Dianne Pastore, and Raymond Hellwig regarding communications strategy around the Sea-Tac Airport third runway decision. Topics include scheduling media availability, coordinating with the governor and Isaki, Port Commission meeting on August 14, E-Board contact timing, press attendance at