TagEcology(797)
-
2000-12-08
EXH AR029061: Sea-Tac Airport Third Runway 401 Permit Negotiations Meeting Notes Summary – Draft for Review
Floyd & Snider Inc. meeting notes summary (draft for review) covering 401 Permit negotiations between the Port Of Seattle and Washington State Department of Ecology (Ecology) regarding the Sea-Tac Airport Stormwater Master Plan Update and third runway construction, October 2 through November 29, 2000. Document ECY00009383/AR029061 covers technical issues including detention sizing, basin acreage discrepancies, -
2000-12-08
EXH AR029087: Sea-Tac Airport Third Runway 401 Permit Negotiations — Final Draft Meeting Notes, December 8, 2000
Final draft meeting notes prepared by Kate Snider of Floyd & Snider Inc. from the Sea-Tac Airport Third Runway 401 Permit Negotiations meeting held December 8, 2000. Attendees included representatives from Washington State Department of Ecology (Ray Hellwig, Kevin Fitzpatrick, Ann Kenny, Dave Garland), Port Of Seattle (Elizabeth Leavitt, Michael Cheyne, Keith Smith), King County -
2000-12-08
EXH AR029093: Sea-Tac Airport Third Runway 401 Permit Negotiations Meeting Notes Summary, October–December 2000
Floyd & Snider Inc. meeting notes summary covering Sea-Tac Airport Third Runway 401 Permit negotiations between Port Of Seattle and Washington State Department of Ecology (Ecology), October 2 through December 8, 2000. Documents master list of 401 Permit technical issues including Stormwater Master Plan detention sizing, basin acreage discrepancies, HSPF and KCRTS hydrological models, IWS -
2000-12-08
EXH AR029120: Sea-Tac Airport Third Runway 401 Permit Negotiations — Meeting Notes Summary (Wetland Issues Only), October–December 2000
Floyd & Snider Inc. meeting notes summary covering 401 Permit negotiations between Port Of Seattle and Washington State Department of Ecology (Ecology) regarding the Sea-Tac Airport Third Runway and Stormwater Master Plan Update, October 2 through December 8, 2000. Document covers wetland issues only and includes a master list of 401 technical issues with resolution -
2000-12-08
EXH AR018814: Sea-Tac Airport Third Runway 401 Permit Negotiations — Meeting Notes Summary, October 2–December 8, 2000
This document summarizes technical negotiation meetings held between October and December 2000 regarding a 401 Water Quality Permit for the Port of Seattle's proposed third runway construction at Sea-Tac Airport. The discussions focused on resolving stormwater management issues, including detention pond sizing, basin hydrology, wetland impacts, and compliance with environmental regulations. A master list of technical issues was maintained jointly by the Port and the Washington State Department of Ecology to track the resolution status of each item prior to permit issuance. -
2000-12-07
EXH AR023676: Letter to Ecology — STIA Ground Water Study, Agreed Order 97TC-122, Response to Nov 16 2000 Meeting Questions
A December 7, 2000 letter from the Port of Seattle to the Washington Department of Ecology responds to questions raised at a November 16, 2000 meeting regarding the Seattle-Tacoma International Airport Ground Water Study conducted under Agreed Order #97TC-122. The letter addresses the completion status of various research tasks, including hydrogeological surveys, contamination site identification, groundwater flow modeling, and pollution prevention for underground storage tank systems. The Port agrees with some of Ecology's assessments of incomplete tasks while disputing others, and clarifies its position on the scope of work required under the agreement. -
2000-12-01
EXH AR046366: Comprehensive Stormwater Management Plan — STIA Master Plan Update Improvements
Comprehensive Stormwater Management Plan (SMP) prepared by Parametrix, Inc. for the Port of Seattle, Seattle-Tacoma International Airport (STIA) Master Plan Update Improvements, December 2000, project number 556-2912-001(28). Document includes a July 2001 preface with replacement pages developed in response to Washington State Department of Ecology (Ecology) comments on Volumes 1 through 4. Covers stormwater management, -
2000-11-30
Exhibit 189: Draft Letter to the Consulting Engineers Council of Washington Regarding RCW 39.80 and Professional Wetland Scientist Selection for Sea-Tac Third Runway
Email from Ann Kenny (Ecology, Shorelands and Environmental Assistance Program) dated November 30, 2000, to Leslie Seffern (ATG) and Erik Stockdale, circulating a draft response letter to Bill Garrity, Executive Director of CECW (Consulting Engineers Council of Washington), regarding his November 22, 2000 letter challenging Ecology’s Request for Bid process for selecting a wetland consultant. -
2000-11-29
EXH AR029054: Sea-Tac Airport Third Runway 401 Permit Negotiations — Final Draft Meeting Notes, November 29, 2000
Final draft meeting notes from November 29, 2000 (9:30am–2:00pm) prepared by Kate Snider of Floyd & Snider Inc. for Sea-Tac Airport Third Runway 401 permit negotiations between Port Of Seattle (Elizabeth Leavitt, Michael Cheyne, Keith Smith) and Washington State Department of Ecology (Kevin Fitzpatrick, Ann Kenny, Dave Garland), with King County (David Masters, Kelly Whiting) -
2000-11-27
Exhibit 2097: Memorandum — Sea-Tac Third Runway Borrow Area 3 Wetland Impacts Recommendations for Wetland Preservation
Memorandum dated November 27, 2000 from Dave Garland, NWRO Water Quality Program, Washington State Department of Ecology, to Ann Kenny (Shorelands and Environmental Assessment Program) and Kevin Fitzpatrick (Water Quality Program). Subject is wetland hydrology impacts from Port Of Seattle’s proposed excavation of Borrow Area 3 sand and gravel fill for the Sea-Tac Third Runway