TagACC(1534)
-
2001-11-15
EXH AR006159: Port Of Seattle’s Objections to Issues Proposed by ACC, PCHB Case No. 01-160
Port Of Seattle’s objections filed November 15, 2001 to three issues proposed by Airport Communities Coalition (ACC) in Pollution Control Hearings Board (PCHB) Case No. 01-160, concerning §401 certification for the Third Runway project. Objects to ACC Proposed Issues 11, 18, and 19: Issue 11 concerns dam safety permit requirements under WAC 173-175 and reasonable -
2001-11-15
EXH AR006162: Port Of Seattle Letter to PCHB on Plans and Reports Pursuant to §401 Certification, PCHB Case No. 01-160
Letter from Foster Pepper & Shefelman (attorneys for Port Of Seattle) to Kaleen Cottingham, Presiding Officer, Pollution Control Hearings Board (PCHB Case No. 01-160), dated November 15, 2001, identifying plans and reports prepared or expected to be prepared pursuant to §401 Certification. Lists documents submitted on or before November 15, 2001 (Wetland A17 mitigation plan, -
2001-11-15
PCHB Doc AR006187: ACC v. Ecology and Port Of Seattle — Supplemental Stipulation Regarding Proposed Statement of Legal Issues
Supplemental Stipulation filed in PCHB No. 01-160, Airport Communities Coalition (ACC) v. State of Washington Department of Ecology and Port Of Seattle. Filed November 15, 2001, received by the Pollution Control Hearings Board November 16, 2001. Documents 21 agreed proposed legal issues for the Board’s consideration, covering Clean Water Act Section 401 certification for the -
2001-11-15
Exhibit 198: Sea-Tac Third Runway Embankment Fill Modeling — Site Features for Hydrus-Slice Modeling (Figure 2-1)
This document presents site features and cross-sectional diagrams used for Hydrus-Slice hydrological modeling of the Sea-Tac Third Runway Embankment Fill project. It shows fill depths ranging from 0 to 160 feet across multiple modeled slices, with cross sections identifying impervious areas, elevation contours, and the watershed divide between Miller Creek and Walker Creek. The figures were produced in November 2001 as part of environmental engineering analysis for the third runway construction. -
2001-11-15
EXH AR006193: Ecology’s Objections to Issues Proposed Separately by ACC
Respondent Washington State Department of Ecology’s objections filed before the Pollution Control Hearings Board (PCHB No. 01-133, PCHB No. 01-160) to issues proposed separately by Airport Communities Coalition (ACC). Ecology objects to ACC Issue No. 2 as outside the Board’s jurisdiction over the 401 Certification, and to ACC Issue No. 3 as duplicative, vague, and -
2001-11-15
PCHB Doc 6195: Ecology’s Revised Preliminary Witness and Exhibit List — ACC v. Ecology and Port Of Seattle (PCHB No. 01-133, 01-160)
Respondent State of Washington Department of Ecology’s revised preliminary witness and exhibit list filed before the Pollution Control Hearings Board in PCHB No. 01-133 and 01-160, Airport Communities Coalition v. Ecology and Port Of Seattle. Lists 11 Ecology witnesses including Ann Kenny, Erik Stockdale, Kevin Fitzpatrick, Dave Garland, and others from Ecology Northwest Regional Office -
2001-11-07
EXH AR026126: HSPF Modeling Notes — Miller, Walker & Des Moines Creeks; HSPF-Hydrus/Slice Linkages
A 2001 technical memo from Hydrocomp, Inc.'s Norm Crawford outlines recommendations for hydrological modeling of Miller, Walker, and Des Moines Creeks near Sea-Tac Airport's new runways and taxiways. The document describes how surface runoff and groundwater flow from both impervious runway surfaces and surrounding pervious grasslands should be calculated and linked across three modeling tools: HSPF, Hydrus, and the Slice model. Key recommendations include properly accounting for infiltration, reducing till seepage by 33% for inactive groundwater recharge, and reconciling discrepancies in land area calculations between the different models. -
2001-11-07
EXH AR051191: Map Prepared by Parametrix, Inc.
Draft map prepared by Parametrix, Inc. on November 07, 2001, AR 051191. The document is a draft aerial/planning map showing what appears to be the Sea-Tac Airport area and surrounding communities, with various zones, boundaries, and site designations marked. Labeled as draft and subject to change. -
2001-11-06
EXH AR023789: Handwritten Notes — Third Runway EIS Modeling Errors, Port Packages, Mitigation
A November 6, 2001 handwritten fax note discusses problems with noise modeling errors and how results will be integrated into legal policies. It notes that AK advised POS to produce a more complete and accurate document, and argues it is not reasonable to hold up port mitigation based on a mistake, stating that if there is no impact, there is no impact. The note also references consultant agreement on impact calculations and requirements related to 401 regulations submitted as group per FAA standards. -
2001-11-03
PCHB Doc 005845: Memorandum Supporting CASE’s Motion to Intervene in ACC v. Ecology and Port Of Seattle
Memorandum filed by Citizens Against Sea-Tac Expansion (CASE) supporting its motion to intervene in PCHB No. 01-160, Airport Communities Coalition v. Washington State Department of Ecology and Port Of Seattle. CASE seeks intervenor status under Civil Rule 24 and WAC 371-08-420(1) in the appeal of Amended Clean Water Act 401 Certification No. 1996-4-02325 (Amended-1) issued