TagSea-Tac Airport(2023)
-
2000-09-05
EXH AR045805: Subsurface Conditions Data Report — Additional Field Explorations and Advanced Testing, Third Runway Embankment, Sea-Tac International Airport
Draft subsurface conditions data report prepared by HartCrowser for HNTB regarding the Third Runway Embankment at Sea-Tac International Airport, project numbers J-4978-23, -26, -27, and -31. Covers additional field explorations and advanced geotechnical testing including auger borings, standard penetration tests (SPT), Shelby tubes, pocket penetrometer, test pits, piezocone penetrometer probes, cone penetration tests (CPT), and -
2000-09-01
EXH AR028056: Port Of Seattle Sea-Tac International Airport Reinforced Earth Design Calculations
Reinforced Earth Company (job number 8079, designer MJB, dated 09/01/00) design calculations for Port Of Seattle Sea-Tac International Airport, West Wall 181+25. Document covers internal and external stability analysis for a Mechanically Stabilized Earth (MSE) retaining wall structure including design parameters (select backfill φ=37°, γ=0.140 kcf, Ka=0.24858; random backfill φ=35°, γ=0.140 kcf, Ka=0.27269; foundation φ=35°, -
2000-08-21
EXH AR045646: Geotechnical Input to MSE Wall and Reinforced Slope Design, Third Runway Embankment
Draft memorandum dated August 21, 2000 from Jamie Beaver, Mike Bailey P.E., and Barry Chen P.E. of Hart Crowser, Inc. to Jim Thomson at HNTB (project J-4978-30) providing geotechnical design information for RECo for MSE wall and reinforced embankment fill design for the Third Runway Embankment at Sea-Tac Airport. Document includes minimum factors of safety -
2000-08-10
Exhibit 119: Email Chain from Kelly Whiting Re: Landscape Management Plans and Metal Rooftop Stormwater Treatment at STIA
Email chain dated August 10, 2000 from Kelly R. Whiting, PE (King County Department of Natural Resources, Water and Land Resource Division, Drainage Services Section) to Louise Kulzer and Kate Rhoads, cc David Masters, regarding Landscape Management Plans and the POS-SMP proposed approach for dealing with metal roofs at Seattle-Tacoma International Airport (STIA). Whiting raises -
2000-08-09
EXH AR045601: Evaluation of Perched Zone Interception and Possible Impacts to Wetland Hydrology, Borrow Area 3, Sea-Tac Third Runway
Hart Crowser draft report prepared for Port of Seattle, August 9, 2000 (J-4978-13), evaluating perched groundwater zone interception and potential wetland hydrology impacts from Borrow Area 3 excavation for the Sea-Tac Third Runway project. Addresses Pacific Groundwater Group (PGG, 2000) concerns commissioned by Washington State Department of Ecology regarding impacts to Wetland 29. Includes ModFlow -
2000-08-01
EXH AR025103: JARPA — Miller Creek Project, Master Plan Update Improvements, STIA
The Port of Seattle submitted a Joint Aquatic Resources Permit Application (JARPA) in August 2000 for the Miller Creek Project, part of Master Plan Update Improvements at Seattle-Tacoma International Airport. The application, prepared by Parametrix, Inc., seeks permits related to work affecting Miller Creek, Walker Creek, and associated wetlands in the City of SeaTac. The project required approvals from multiple agencies, including the Washington Department of Fish and Wildlife for a Hydraulic Projects Approval (HPA). -
2000-08-01
EXH AR045478: Ground Water Study — STIA Quarterly Ground Water Level Measurements, C1 (Qva) Monitoring Well Network
Letter dated August 1, 2000 from Associated Earth Sciences, Inc. (AESI), Project No. BV97016D, to Mr. John Wietfeld and Mr. Roger Nye of Washington State Department of Ecology Northwest Regional Office, on behalf of Port Of Seattle. Transmits quarterly ground water level measurements for Q1–Q4 from select wells completed in the C1 (Qva) advance outwash -
2000-08-01
EXH AR045494: Wildlife Hazard Management Plan — Sea-Tac Airport
Wildlife Hazard Management Plan (WHMP) for Seattle-Tacoma International Airport (SEA), developed by Port Of Seattle in cooperation with USDA Animal and Plant Health Inspection Service (APHIS) Wildlife Services, Olympia, WA, August 2000, AR 045494. Covers habitat management (grass, wetlands, water, vegetation, structure), wildlife control procedures (bird and mammal control, wildlife patrol), laws and regulations (Washington -
2000-07-30
EXH AR017907: King County Drainage Services Email Chain on Copper Levels in STIA Runway Runoff and Water Quality BMPs
Email chain dated July 30, 2000 from Kelly R. Whiting, PE, King County Department of Natural Resources, Water and Land Resource Division, Drainage Services Section, to David Masters and Tom Luster (WDOE), forwarding water quality specialist Kate Rhoads’ notes on copper (Cu) levels in Seattle-Tacoma International Airport (STIA) runway stormwater runoff. Whiting discusses KCSWDM (King -
2000-07-28
EXH AR017905: Email and Notes on Copper Levels in POS Runway Runoff
Email from Kate Rhoads to Kelly Whiting dated July 28, 2000, with attached notes (POS-Cu.doc) on copper levels in Sea-Tac Airport (STIA/POS) runway stormwater runoff and the need for further treatment. Notes discuss total recoverable (TR) copper concentrations (median 37 ug/l) from SEATAC runways versus the acute toxicity standard of 15 ug/l at hardness 100,