2001-06-22
Exhibit 2043: TCP Recommendations for 401 Certification and Analysis of Preferential Ground Water Flow Paths Relative to Proposed Third Runway, STIA
Memo dated June 22, 2001 from Ching-Pi Wang (Toxics Cleanup Program, TCP) to Ann Kenny regarding TCP recommendations for 401 certification related to the proposed Third Runway at Seattle-Tacoma International Airport (STIA). Three recommendations: (1) Port of Seattle to develop a plan by September 14, 2001 to monitor contaminant transport to soil and groundwater via -
2001-06-21
EXH AR050665: Ecology & Port Of Seattle Letter to Army Corps of Engineers Extending Coastal Zone Management Consistency Review Deadline
Letter dated June 21, 2001 from Jeannie Summerhays (Washington Department of Ecology, Northwest Regional Office) and Elizabeth Leavitt (Port Of Seattle, Aviation Environmental Programs, Seattle-Tacoma International Airport) to Tom Mueller, Chief, Department of the Army Corps of Engineers, Seattle District, Regulatory Branch. Pursuant to 15 CFR § 930.60, Ecology and the Port Of Seattle mutually -
2001-06-21
EXH AR018374: Record of Telecon with Ann Kenny Regarding Scope Changes, Low Flow Meeting, and Parametrix
Record of telecon dated 6-21-01, call from Ann Kenny. Notes that Port has agreed to pay for new scope and minor plan sheet changes. Jim to be given confirmation in writing. July 9th Low Flow meeting scheduled. Parametrix involvement noted — panel 6 may be larger with potential impact. Meeting with Corps to be set -
2001-06-20
EXH AR021386: Rebuttal to Response to 401/404 Comments, Miller Creek Relocation & Master Plan Update, STIA
A biologist with Columbia Biological Assessments submitted a formal rebuttal in June 2001 challenging the Port of Seattle's environmental responses related to proposed Master Plan Update Improvements at Seattle-Tacoma International Airport. The rebuttal argues that the Port failed to adequately assess impacts on Miller Creek, particularly regarding fish habitat, water temperature, and dissolved oxygen levels during summer months. The author contends that no proper baseline survey of fish and aquatic organisms was conducted, making regulatory approval and proposed mitigation measures scientifically insufficient. -
2001-06-20
EXH AR023116: Rebuttal to Response to 401/404 Comments, Miller Creek Relocation Project, STIA Master Plan Update
A biologist from Columbia Biological Assessments submitted a rebuttal in June 2001 challenging the Port of Seattle's environmental justifications for proposed construction improvements at Seattle-Tacoma International Airport. The letter argues that the Port failed to adequately assess impacts on Miller Creek, particularly regarding fish habitat, water temperature, and dissolved oxygen levels in a relocated section of the creek. The author contends that no proper baseline survey of fish and aquatic life was conducted, making regulatory approval of the project scientifically premature. -
2001-06-19
Exhibit 76: Analysis of Preferential Ground Water Flow Paths Relative to Proposed Third Runway, STIA
Draft technical memorandum prepared by Associated Earth Sciences, Inc. (AESI, Project No. BV99122C) for Port Of Seattle, dated June 19, 2001, analyzing preferential ground water flow paths relative to the proposed Third Runway at Seattle-Tacoma International Airport (STIA). Evaluates potential contaminant migration from the Aviation Operations and Maintenance Area (AOMA) to the third runway construction -
2001-06-19
EXH AR050641: Draft Technical Memorandum — Analysis of Preferential Ground Water Flow Paths Relative to Proposed Third Runway, STIA
Draft technical memorandum prepared by Associated Earth Sciences, Inc. (AESI, Project No. BV99122C) for Port Of Seattle, dated June 19, 2001, analyzing preferential ground water flow paths relative to the proposed Third Runway at Seattle-Tacoma International Airport (STIA). Responds to Washington Department of Ecology (Ecology) request regarding whether contaminated ground water below the Aviation Operations -
2001-06-18
EXH AR030796: Hart Crowser Letter of Transmittal — Borrow Area 3 Wetland Protection Swale Draft Plans, Third Runway Project
Hart Crowser Senior Principal Michael Bailey transmits revised draft plans and cross sections for the Borrow Area 3 Wetland Protection Swale (Job No. 4978-06) to Jim Kelley at Parametrix, June 18, 2001. Documents include Figure 1 (Post-Reclamation Topography and Drainage Facilities), Figure 2 (Typical Cross Sections), Figure 3 (Post-Reclamation Topographical Detail), and Figure 4 (Proposed -
2001-06-18
EXH AR050603: Avoidance of Wetland Impacts, Temporary Stormwater Pond A, Sea-Tac Third Runway
Hart Crowser, Inc. report prepared for HNTB and the Port of Seattle, project number 4978-06, dated June 18, 2001, addressing avoidance of wetland impacts associated with Temporary Stormwater Pond A for the Sea-Tac Third Runway project. Includes summary of subsurface conditions, protection of wetlands analysis, groundwater seepage analysis, observed groundwater levels in monitoring wells near -
2001-06-18
EXH AR050666: Letter of Transmittal — Borrow Area 3 Wetland Protection Swale, Third Runway Project
Letter of transmittal dated June 18, 2001 from Michael Bailey, P.E. (Senior Principal, Hart Crowser) to Jim Kelley at Parametrix, Job No. 4978-06, transmitting four draft figures for the Third Runway Project Borrow Area 3 Wetland Protection Swale: Figure 1 Post-Reclamation Topography and Drainage Facilities, Figure 2 Typical Cross Sections, Figure 3 Post-Reclamation Topographical Detail,