Notes
Hart Crowser report prepared for Port of Seattle, dated September 12, 2000 (J-4978-13), evaluating perched groundwater zone interception at Borrow Area 3 for the Sea-Tac Third Runway project. Analyzes shallow perched groundwater flow from northwest to southeast beneath Borrow Areas 3 and 4, its role in sustaining Wetland 29, and the impact of borrow area excavation on wetland hydrology. Responds to Pacific Groundwater Group (PGG, 2000) Hydrology Studies Report commissioned by Washington State Department of Ecology. Includes ModFlow groundwater modeling, water level data, flow nets, seepage face analysis, and swale mitigation design. References Parametrix 1999 wetland mapping.
