TagBoeing Field(62)
-
2002-10-23
EXH AR038735: Interlocal Agreement, Airport Communities Coalition
Interlocal Agreement establishing the Airport Communities Coalition (ACC) under the Interlocal Cooperation Act (RCW Chapter 39.34), signed by the cities of Normandy Park, Des Moines, Burien, Federal Way, and Tukwila, each a Washington Municipal Corporation. The agreement opposes construction of a third runway at Seattle-Tacoma International Airport, opposes increased air traffic at Boeing Field, seeks -
2001-06-22
Aerial View of Sea-Tac Airport Construction and East Airfield Development
Aerial photograph looking north over Sea-Tac Airport showing active construction, including what appears to be a new terminal or cargo facility under development on the airfield's east side, a retention pond, and the main runway complex. The Boeing facility and hangars are visible in the upper left, consistent with the airport's proximity to Boeing Field/King County International Airport area. -
1992-07-01
Sea-Tac Airspace Update Study: Comparison of 1988 Airspace Update Study, 1992 Terminal Development Plan, and the 1991 Enhancement Plan
This 1992 study compares three planning reports on Sea-Tac Airport's future capacity and delays: the 1988 Airspace Update Study, the 1992 Terminal Development Plan, and the 1991 Enhancement Plan. The reports differ significantly in their passenger and flight operation projections for the year 2000, and show striking discrepancies in delay estimates — with the Enhancement Plan projecting delay hours more than five times higher than the Airspace Update Study. The document also outlines proposed solutions to reduce delays, including new runway construction, airspace conflict resolution with nearby Boeing Field, and improved approach procedures. -
1982-10-27
Evaluation of Alternative Measures: Chapter 7, Shared Airspace Study
This draft chapter evaluates alternative measures to reduce growing aircraft delays caused by airspace interactions between Seattle-Tacoma International Airport (Sea-Tac) and Boeing Field, which are projected to worsen significantly between 1990 and 2000. Three main approaches are examined: improving air traffic control (ATC) technology to allow reduced aircraft separations, expanding airport facilities through new runways or reliever airports, and managing demand through flight quotas or peak-period pricing. The chapter concludes that a combination of these measures will likely be necessary, and that action should begin immediately since implementation could take until 1990 when the delays are expected to become critical. -
1982-09-01
Evaluation of Alternative Measures: Chapter 7
This draft chapter evaluates alternative measures to address growing aircraft delays caused by airspace interactions between Seattle-Tacoma International Airport (Sea-Tac) and Boeing Field, which are projected to worsen significantly from 1990 through 2000. The measures examined include improved air traffic control (ATC) technology, airport facility improvements such as a new runway and reliever airports, and demand management strategies like flight quotas and peak-period surcharges. The chapter emphasizes that, despite delays not being critical until around 1990, immediate planning and commitment from various agencies is necessary given the lengthy implementation timelines involved. -
1982-09-01
Evaluation of Alternative Measures: Chapter 7
Chapter 7 of a draft study evaluating alternative measures to reduce aircraft delays resulting from airspace interactions between Sea-Tac Airport and Boeing Field. Topics include improved ATC technology, reduced aircraft separations, Microwave Landing System (MLS) instrument approaches, new Runway 13-31 at Sea-Tac, reliever airports, IFR quotas, IFR peak period surcharges, and cooperative rescheduling of flights. -
1982-05-01
Sea-Tac/Boeing Field Airspace Study Newsletter, May 1982
A May 1982 newsletter from the Port of Seattle and King County describing an airspace study examining overlapping flight patterns between Sea-Tac International Airport and Boeing Field. The study found that delays caused by these overlapping traffic patterns were expected to grow gradually through 1990 and accelerate through 2000, particularly at Sea-Tac. The public was invited to a May 18, 1982 meeting to review preliminary findings and provide input on whether to proceed with identifying solutions to reduce aircraft delays. -
1982-04-01
Preliminary Assessment of Airspace Interactions: Seattle-Tacoma International Airport and King County International Airport
A 1982 draft working paper prepared by Peat, Marwick, Mitchell & Co. for the Port of Seattle assessed airspace interactions between Seattle-Tacoma International Airport (Sea-Tac) and King County International Airport (Boeing Field). The study analyzed existing and projected airfield capacities, aircraft delays, and the effects of overlapping airspace on both airports, taking into account factors such as air traffic demand, aircraft mix, weather conditions, and runway procedures. Its findings were intended to help the Port of Seattle determine whether more detailed investigation and mitigation measures were needed in a subsequent phase of the study. -
1982-04-01
Preliminary Assessment of Airspace Interactions: Seattle-Tacoma International Airport and King County International Airport
Draft working paper prepared by Peat Marwick Mitchell & Co. for the Port Of Seattle in April 1982, providing a preliminary assessment of airspace interactions between Seattle-Tacoma International Airport (Sea-Tac) and King County International Airport (Boeing Field). Analyzes airfield capacities and aircraft delays at both airports, including effects of airspace interactions on those metrics. Assessment -
1982-02-24
Forecasts of Peak Hour and Annual Aircraft Operations by Aircraft Classification: Sea-Tac International Airport and King County International Airport, 1980–2000
This document presents forecasts of aircraft operations at Seattle-Tacoma (Sea-Tac) International Airport and King County International Airport from 1980 to 2000, broken down by aircraft classification and flight category including air carrier, general aviation, and military. It projects that total annual operations at Sea-Tac will grow from approximately 213,600 in 1980 to over 260,800 by 2000, driven largely by increases in larger Class D air carrier aircraft. Peak hour operation estimates are provided for both Visual Flight Rules (VFR) and Instrument Flight Rules (IFR) conditions, offering planners a detailed basis for noise impact and capacity assessments.