TagACC(1524)
-
2001-11-01
RE: Processed Materials
An email chain discussing the application of ‘fill criteria’ under the 401 permit conditions for the Port of Seattle’s Third Runway project. Ed Abbasi provides guidance on how different fill materials (topsoil, backfill, fill borrow, gravel) should be handled, including certification and QA/QC requirements. The original emails from Elizabeth Leavitt and Beth Clark initiated the -
2001-11-01
AR 026637: Trickle Down Effect — Metal Roofing Materials Contribute to Elevated Zinc Concentrations in Sea-Tac Airport Stormwater Discharges
Article by Scott A. Tobiason and Linda R. J. Logan published in ‘Industrial Wastewater’ magazine (WEF publication), November 2001, about whole effluent toxicity (WET) testing and source tracing at Seattle-Tacoma International Airport (STIA), operated by Port Of Seattle. Documents that galvanized metal roofing on cargo buildings contributed to elevated zinc concentrations in stormwater discharges from -
2001-11-01
EXH AR029275: Natural Resource Mitigation Plan, Master Plan Update Improvements, Seattle-Tacoma International Airport
Final Natural Resource Mitigation Plan (NRMP) prepared by Parametrix, Inc. for the Port Of Seattle, covering Master Plan Update Improvements at Seattle-Tacoma International Airport (Sea-Tac Airport). Document number 556-2912-001 (03), dated November 2001. Administrative Record document AR 029275–AR 029277. -
2001-11-01
Master Plan Update improvement projects at STIA
A detailed map figure (Figure 1.3-1) from the Sea-Tac International Airport Master Plan Update showing improvement projects including the Third Runway, runway safety areas, Miller Creek relocation, MSE retaining walls, detention facilities, and various infrastructure modifications. The map highlights design modifications used to avoid or minimize wetland impacts throughout the construction area. It was submitted -
2001-11-01
Natural Resource Mitigation Plan: Seattle-Tacoma International Airport Master Plan Update
This document summarizes the proposed Master Plan Update improvement projects at Seattle-Tacoma International Airport, detailing elements that will impact wetlands, floodplains, streams, and drainage channels. Projects include adding a third parallel runway, establishing runway safety areas, developing the South Aviation Support Area, and relocating roads and utilities. The document includes a comprehensive table of all -
2001-10-31
DRAFT Low Flow Analysis Meeting Notes from October 30, 2001
An email chain forwarding draft meeting notes from a low flow analysis meeting held October 30, 2001. Raymond Hellwig forwards the notes to Thomas Fitzsimmons, noting that revisions to the low flow analysis based on correction of previous modeling errors are reasonable but will require clear documentation and rationale. Cheryl Blaser of Floyd Snider McCarthy, -
2001-10-31
EXH AR028232: Regulatory Guidance Letter No. 01-1 — Compensatory Mitigation Projects Under the Corps Regulatory Program
US Army Corps of Engineers Regulatory Guidance Letter No. 01-1, dated 31 October 2001, providing guidance for the establishment and maintenance of compensatory mitigation projects under Section 404(a) of the Clean Water Act and Section 10 of the Rivers and Harbors Act of 1899. Covers debit/credit assessment methodology, role of preservation, inclusion of upland areas, -
2001-10-30
Draft Meeting Notes: Low Flow Analysis, October 30, 2001
Draft meeting notes from a Low Flow Analysis meeting held October 30, 2001, related to the 401 Permit Post-Issuance Clarification for Sea-Tac International Airport’s Third Runway. The notes describe modeling errors discovered by Port of Seattle consultants in the low streamflow analysis, including a conversion factor error in embankment fill input to HSPF that resulted -
2001-10-30
401 Permit Post-Issuance Clarification: Sea-Tac International Airport Third Runway Low Flow Analysis Final Meeting Notes
Final meeting notes from an October 30, 2001 meeting convened by the Port of Seattle to discuss errors identified in the low streamflow modeling for the Sea-Tac Airport Third Runway 401 Permit. The meeting covered six specific modeling errors and associated revisions, including a 1/24th conversion factor error in embankment fill input to HSPF, incorrect -
2001-10-30
Notes on HSPF Modeling of Miller, Walker and Des Moines Creeks: Linkages Between HSPF and Hydrus/Slice
Technical notes from Hydrocomp, Inc. (authored by Norm Crawford) describing the linkages between HSPF and Hydrus/Slice models for stormwater and groundwater modeling at Sea-Tac Airport’s new runway and taxiway areas. The document outlines how pervious and impervious land surfaces are modeled, how water moves through fill material and Vashon till, and provides eight recommended steps