TagSAMP(650)
Articles tagged with the Sustainable Airport Master Plan.
-
2024-05-22
Highline Forum SAMP NTP Environmental Review Overview — Slide 4 (May 2024)
A presentation slide titled 'Environmental review analysis based on constrained growth scenarios' shows a line chart comparing historical operations data (2011–2020), a 2022 unconstrained forecast, and two constrained growth scenarios—No Action and Proposed Action—projected through 2037. The Proposed Action constrained scenario reaches approximately 515,000 operations by 2037, while the No Action constrained scenario plateaus near 480,000, both falling well below the unconstrained 2022 forecast of approximately 560,000. -
2024-05-22
Highline Forum SAMP NTP Environmental Review Overview — Slide 5 (May 22, 2024)
This presentation slide lists the NEPA resource categories that will be covered in an environmental review document, including Air Quality, Biological Resources, Climate, Coastal Resources, DOT Section 4(f), Farmlands, Hazardous Materials, Land Use, Historical/Cultural Resources, Noise and Noise-Compatible Land Use, Socioeconomics/Environmental Justice, Visual Effects, and Water Resources. A footer note states that the FAA is the lead agency for NEPA and that the document will cover an extensive set of resource categories; this is slide 5 of the presentation. -
2024-05-22
Highline Forum SAMP NTP Environmental Review Overview — Page 2 (May 22, 2024)
This presentation slide outlines near-term projects under the Sustainable Airport Master Plan, including expanded passenger processing facilities to accommodate a projected 56 Million Annual Passengers (MAP), additional cargo and fuel storage facilities, airfield infrastructure modifications to meet FAA design standards, and taxiway efficiency improvements. The mention of the Port's Sustainable Aviation Fuel initiative identifies this as a Port of Seattle document related to Seattle-Tacoma International Airport planning. -
2024-05-22
Sustainable Airport Master Plan Near-Term Projects Environmental Review
The Port of Seattle presented an environmental review of near-term construction projects at Seattle-Tacoma International Airport as part of its Sustainable Airport Master Plan. The projects include expanding passenger terminals and gates to handle a projected 56 million annual passengers, adding cargo and fuel storage facilities, and upgrading airfield infrastructure to meet current FAA safety standards. The review was presented to the Highline Forum in May 2024 by Senior Environmental Program Manager Steve Rybolt. -
2024-05-22
SAMP NTP Environmental Review Overview — Aircraft Operations Forecast Chart (Page 4), May 2024
A line graph comparing historical aircraft operations data (2011–2022) with forecast scenarios through 2037, including an unconstrained 2022 forecast, a No Action constrained scenario, and a Proposed Action constrained scenario. The chart shows operations declining sharply in 2020 (likely due to COVID-19) and recovering, with the Proposed Action scenario reaching approximately 520,000 operations and the No Action scenario capping near 485,000 operations by 2037. -
2024-05-22
SAMP Near-Term Projects Environmental Review Overview — Highline Forum, May 22, 2024 (Page 1)
Title slide for a Port of Seattle presentation on the Sustainable Airport Master Plan Near-Term Projects Environmental Review, delivered by Steve Rybolt, Senior Environmental Program Manager, at the Highline Forum on May 22, 2024. -
2024-05-22
SAMP Environmental Review — Near-Term Capital Projects Aerial Map (Page 3)
This aerial map, from the Seattle-Tacoma International Airport Sustainable Airport Master Plan (SAMP) Environmental Review prepared by the Port of Seattle and LPA Group, depicts near-term capital projects across the airport campus. Projects are color-coded by category including Second Terminal Projects (blue), Cargo Expansion Projects (tan/gold), Airfield Operational Projects (yellow), Airfield Safety/Standards Projects (red), and Sustainable Aviation Fuel Projects (green), with individual project codes labeled (e.g., A01–A09, S01–S10, C01–C03, L01–L07, T01–T02). -
2024-05-22
Highline Forum SAMP NTP Environmental Review Overview — SEPA Elements of the Environment, Slide 6 (May 2024)
A presentation slide titled 'SEPA Elements of the Environment' listing the environmental review categories required under Washington State's State Environmental Policy Act (SEPA), including Earth, Air, Water, Plants and Animals, Energy, Environmental Health, Land and Shoreline Use, Transportation, Public Services and Utilities, and Sewer/Solid Waste. A footer note states: 'Port is the lead agency for the SEPA and the document will cover an extensive set of environmental elements,' indicating this is part of a Port (likely Port of Seattle/Sea-Tac) environmental review presentation, slide 6. -
2024-05-22
Highline Forum SAMP NTP Environmental Review Overview — Project Schedule Slide (Page 7, May 2024)
A project schedule slide showing key milestones for NEPA Environmental Assessment (EA) and SEPA Environmental Impact Statement (EIS) processes, spanning August 2023 through 2026. Milestones include Impact Analysis Draft Sections (June 2024), NEPA EA Draft Document Agency and Public Comment Period (Q4 2024), NEPA EA Final Document and Decision (Early Q2 2025), SEPA EIS Draft Document Agency and Public Comment Period (Late Q2 2025), SEPA EIS Agency and Public Review Complete (Mid Q3 2025), SEPA EIS Final Document and Decision (Q4 2025), and Commission consideration/approval of project(s) in 2026. -
2024-05-22
Highline Forum SAMP NTP EnvrReview Overview – 22may2024 Page 3
Slide 3 from a Port of Seattle presentation on the Seattle-Tacoma International Airport (Sea-Tac) Sustainable Airport Master Plan (SAMP) Environmental Review, showing an aerial map of near-term projects categorized by type: Second Terminal Projects (blue), Cargo Expansion Projects (orange/brown), Airfield Operational Projects (yellow), Airfield Safety/Standards Projects (red), and Sustainable Aviation Fuel Projects (green). The map is branded with the Port of Seattle and ZLB logos.