TagSAMP(650)
Articles tagged with the Sustainable Airport Master Plan.
-
2001-12-01
EXH AR018164: Low Streamflow Analysis and Summer Low Flow Impact Offset Facility Proposal — Port Of Seattle STIA Master Plan Update
Parametrix, Inc. December 2001 report for Port Of Seattle on Low Streamflow Analysis and Summer Low Flow Impact Offset Facility Proposal for the Seattle-Tacoma International Airport (STIA) Master Plan Update Improvements. Document AR018164, Exhibit 140. Covers HSPF model calibration, embankment modeling, non-hydrologic impacts (cessation of water withdrawals, removal of septic tank discharges), HEC-RAS modeling, vault -
2001-11-07
EXH AR051191: Map Prepared by Parametrix, Inc.
Draft map prepared by Parametrix, Inc. on November 07, 2001, AR 051191. The document is a draft aerial/planning map showing what appears to be the Sea-Tac Airport area and surrounding communities, with various zones, boundaries, and site designations marked. Labeled as draft and subject to change. -
2001-11-01
EXH AR052455: Des Moines Way Nursery Mitigation Plan, Seattle-Tacoma International Airport Master Plan Update Improvements
Parametrix, Inc. prepared this Des Moines Way Nursery Mitigation Plan (AR 052455) for Port Of Seattle, Seattle-Tacoma International Airport, November 2001, project number 556-2912-001(03). The plan covers wetland restoration and enhancement at the Des Moines Way Nursery mitigation site, including grading design, expected hydrology, wildlife considerations, planting plan, vegetation monitoring, performance standards, maintenance and contingency -
2001-09-01
EXH AR051194: 3rd Runway Program Master Plan Schedule Update as of 01SEP01
Administrative Record AR051194 — Primavera Systems schedule document for the 3rd Runway Program (000683 Master Plan) at Sea-Tac Airport, updated as of 01SEP01. Covers Program Management, Environmental Permitting, West Side Laydown Area CIP, Auburn Wetlands Fill & Mitigation – Grading, and Safety Areas 16R/16L. Activities include site acquisition, noise mitigation, DOE 401 permit, environmental permitting, -
2001-07-27
Exhibit 162: Record of Telecon — Kelly Whiting, Low Flow Wetland 44a
Handwritten Record of Telecon dated 7-27-01, call from Kelly Whiting (KCI), subject: low flow — Wetland 44a. Notes state no water coming from the drain to south, cut not fill on runway, third-way model over-estimated flow; Parametrix modeled at 2200; 11,000-foot estimate; embankment will provide flow except where lined; flows feeding 44a are not meeting -
2001-07-17
EXH AR017968: Handwritten Notes from Yvonne — Third Runway SMP/Low Flow Status Meeting, 7/17/01
Handwritten note from Yvonne to ‘Azura’ transmitting notes from Gordon regarding the Third Runway, noting he does not think they are deliberative. Also includes meeting notes dated 7/17/01 at 10pm for a Third Runway Project Update attended by Ann K, Ray H, John M, Kevin F, Tania Sorenson, Kelly Whittig. Notes cover SMP/Low Flow status: -
2001-04-05
EXH AR028405: Port Of Seattle Master Plan Update — Wetland Functional Analysis, Wetlands A6-A7-A8, A12-A13-A18
Parametrix, Inc. wetland functional analysis forms prepared for the Port Of Seattle Master Plan Update, documenting wetland attributes for wetlands A6-A7-A8 and A12-A13-A18, dated 4/5/01, investigator W.K./Mil. Records presence/absence of wetland attributes including vegetation classes (Cowardin), forested wetland coverage (80%, 30%), impervious surface (>60% urban/runway), buffer conditions, seasonal ponding, emergent vegetation, seeps and springs, flooding -
2000-12-01
EXH AR047400: Wetland Delineation Report, Master Plan Update Improvements, Seattle-Tacoma International Airport
Wetland Delineation Report prepared by Parametrix, Inc. for Port Of Seattle, Seattle-Tacoma International Airport (Sea-Tac Airport), December 2000, project number 556-2912-001 (41). Report covers wetland delineation for Master Plan Update Improvements including North Employee Parking Lot, Runway Safety Area Extension, Third Runway project area, Borrow Areas 1 and 3, South Aviation Support Area (SASA)/Tyee Valley -
2000-08-21
EXH AR045646: Geotechnical Input to MSE Wall and Reinforced Slope Design, Third Runway Embankment
Draft memorandum dated August 21, 2000 from Jamie Beaver, Mike Bailey P.E., and Barry Chen P.E. of Hart Crowser, Inc. to Jim Thomson at HNTB (project J-4978-30) providing geotechnical design information for RECo for MSE wall and reinforced embankment fill design for the Third Runway Embankment at Sea-Tac Airport. Document includes minimum factors of safety -
2000-01-24
EXH AR044096: Draft Modeled Till Thickness Around AOMA, Sea-Tac Airport
Draft modeled till thickness map around the Aircraft Operations & Maintenance Area (AOMA) at Seattle-Tacoma International Airport, WA, prepared by Associated Earth Sciences, Inc. on 01/24/00. Contour map showing till thickness in feet (0–90 ft range) with data points from 01-24-00, depicting existing runways, main SeaTac buildings, tunnels, streets, and streams. Administrative Record document AR