TagPort Of Seattle(2611)
-
2001-04-30
EXH AR028046: Port Of Seattle Memo — Black River Quarry TPH and Metals Testing for Third Runway Embankment
Port Of Seattle internal memo dated 04/30/01 from Beth Clark to Paul Agid (cc: Elizabeth Leavitt, Jim Thomson) regarding rock aggregate imported from the Black River Quarry (King County, Washington), owned by Stoneway Rock & Recycling, used in the Third Runway embankment during August–October 2000. Documents AMEC and City Transfer Inc. (CTI) chemical testing for -
2001-04-30
EXH AR023204: Memo — Black River Quarry Aggregate Testing (TPH & Metals)
A Port of Seattle memo from April 2001 summarizes environmental testing of rock aggregate imported from the Black River Quarry for use in the Third Runway embankment project. Testing by environmental consultant AMEC found petroleum hydrocarbons (TPH) and elevated copper levels in some samples, prompting operational changes at the quarry including equipment cleaning and discarding the first hundred tons of rock after asphalt recycling operations. Follow-up testing confirmed that contaminant levels fell below MTCA Method A cleanup standards, and the Port halted material imports from the quarry in mid-October 2000 pending resolution. -
2001-04-25
EXH AR029160: Final Draft Meeting Notes – Low Flow Analysis, Sea-Tac Airport Third Runway, April 25, 2001
Final draft meeting notes from April 25, 2001 low flow analysis technical meeting for the Sea-Tac International Airport Third Runway 401 Permit Decision-Making process. Attendees included Ann Kenny (Dept. of Ecology), Kelly Whiting (King County), Keith Smith (Port of Seattle), Joe Brascher (AquaTerra), Peter Schwartzman (Pacific Groundwater Group), and Kate Snider (Floyd & Snider Inc.). -
2001-04-23
EXH AR029157: 401 Permit Decision-Making, Sea-Tac International Airport Third Runway — Technical Meeting Notes, April 23, 2001
Final draft meeting notes prepared by Rachel McCrea of Floyd & Snider Inc. for a 401 Permit Decision-Making technical meeting held April 23, 2001, regarding Sea-Tac International Airport Third Runway. Attendees included representatives from Washington State Department of Ecology (John Drabek, Ann Kenny), Port of Seattle (Keith Smith), King County (Kelly Whiting), HNTB (Alan Black), -
2001-04-23
Exhibit 2209: Email and Photos — Mitigation Planning in Auburn, STIA Master Plan Update Improvements
Email from Jim Kelley (Parametrix, Inc.) to klw@shanwil.com dated April 23, 2001, regarding wetland mitigation planning for the Auburn mitigation site associated with Seattle-Tacoma International Airport Master Plan Update Improvements. Kelley discusses shrub and emergent plant community design, water level management between 41 and 42 feet, planting elevations to out-compete blackberry and reed canary grass, -
2001-04-17
EXH AR029155: 401 Permit Decision-Making, Sea-Tac Airport Third Runway — Management Meeting Final Draft Notes, April 17, 2001
Final draft meeting notes from April 17, 2001 management meeting on 401 Permit Decision-Making for Sea-Tac International Airport Third Runway, prepared by Rachel McCrea of Floyd & Snider Inc. Attendees include Ray Hellwig, Ann Kenny, Kevin Fitzpatrick (Dept. of Ecology), David Masters (King County), Michael Cheyne, Elizabeth Leavitt, Keith Smith (Port Of Seattle), Kate Snider -
2001-04-16
EXH AR029152: 401 Permit Decision-Making, Sea-Tac Airport Third Runway — Technical Meeting Minutes, April 16, 2001
Final draft meeting notes from April 16, 2001 technical meeting on 401 Permit Decision-Making for Sea-Tac Airport Third Runway, prepared by Rachel McCrea of Floyd & Snider Inc. Attendees included John Drabek and Ann Kenny (Dept. of Ecology), Keith Smith (Port of Seattle), Kelly Whiting (King County), Alan Black (HNTB), Paul Fendt and Tom Atkins -
2001-04-11
Summary of Correspondence and Documents Related to Agreed Order Materials, Department of Ecology and Port Of Seattle, 2001
This document summarizes correspondence and records related to environmental cleanup efforts at Seattle-Tacoma International Airport, covering the period from 1997 to 2001. It details how Governor Locke conditioned his 1997 certification for the airport's third runway expansion on the Port of Seattle completing a study of decades-worth of hazardous waste contamination in the soil and groundwater at the site. The records also trace the lengthy negotiations between the Port and the Washington State Department of Ecology to establish an Agreed Order under the Model Toxics Control Act, which was ultimately signed in May 1999. -
2001-04-09
EXH AR029148: 401 Permit Decision-Making Technical Meeting — Sea-Tac Airport Third Runway, April 9, 2001
Revised draft meeting notes from April 9, 2001 technical meeting on 401 Permit Decision-Making for Sea-Tac International Airport Third Runway, prepared by Rachel McCrea of Floyd & Snider Inc. Attendees included John Drabek and Ann Kenny (Dept. of Ecology), Keith Smith (Port of Seattle), Kelly Whiting (King County), Alan Black (HNTB), Paul Fendt and Tom -
2001-04-05
EXH AR028405: Port Of Seattle Master Plan Update — Wetland Functional Analysis, Wetlands A6-A7-A8, A12-A13-A18
Parametrix, Inc. wetland functional analysis forms prepared for the Port Of Seattle Master Plan Update, documenting wetland attributes for wetlands A6-A7-A8 and A12-A13-A18, dated 4/5/01, investigator W.K./Mil. Records presence/absence of wetland attributes including vegetation classes (Cowardin), forested wetland coverage (80%, 30%), impervious surface (>60% urban/runway), buffer conditions, seasonal ponding, emergent vegetation, seeps and springs, flooding