TagPort Of Seattle(2410)
-
2001-12-06
EXH AR005836: Port Of Seattle’s Response to Motion to Intervene from CASE, PCHB Case No. 01-160
Port Of Seattle response filed December 6, 2001 to motion to intervene by Citizens Against Sea-Tac Expansion (CASE) in Pollution Control Hearings Board (PCHB) Case No. 01-160, Airport Communities Coalition (ACC) v. Department of Ecology and Port Of Seattle. Port does not oppose CASE intervention if limited under WAC 371-08-420(1): CASE barred from raising new -
2001-12-05
EXH AR005840: ACC’s Response to CASE’s Motion to Intervene, PCHB No. 01-160
Airport Communities Coalition (ACC) response to Citizens Against Sea-Tac Expansion (CASE) Motion to Intervene in PCHB No. 01-160, filed December 5, 2001 before the Pollution Control Hearings Board for the State of Washington. ACC does not object to CASE’s intervention but agrees it should not interfere with ACC’s pending Motion for Stay. Respondents are State -
2001-12-01
EXH AR018164: Low Streamflow Analysis and Summer Low Flow Impact Offset Facility Proposal — Port Of Seattle STIA Master Plan Update
Parametrix, Inc. December 2001 report for Port Of Seattle on Low Streamflow Analysis and Summer Low Flow Impact Offset Facility Proposal for the Seattle-Tacoma International Airport (STIA) Master Plan Update Improvements. Document AR018164, Exhibit 140. Covers HSPF model calibration, embankment modeling, non-hydrologic impacts (cessation of water withdrawals, removal of septic tank discharges), HEC-RAS modeling, vault -
2001-12-01
EXH 464: Low Streamflow Analysis Summer Low Flow Impact Offset Facility Proposal STIA Master Plan Update
This December 2001 technical report analyzes low streamflow conditions in Miller, Walker, and Des Moines Creeks near Seattle-Tacoma International Airport, assessing the hydrologic impacts of the proposed third runway embankment as part of the airport's Master Plan Update. The study found that the runway construction would reduce summer stream flows, requiring mitigation of 0.11 cfs in Walker Creek and 0.08 cfs in Des Moines Creek during the annual low-flow period (late July through October). To offset these impacts, the Port of Seattle proposed collecting and storing excess winter stormwater in underground vaults—approximately 18.5 acre-feet for Walker Creek and 13.5 acre-feet for Des Moines Creek—for controlled release during dry-season low-flow periods. -
2001-12-01
EXH AR017886: Low Streamflow Analysis and Summer Low Flow Impact Offset Facility Proposal — Seattle-Tacoma International Airport Master Plan Update Improvements
Report prepared by Parametrix, Inc. with Aqua Terra Consultants, Earth Tech, Inc., Foster Wheeler Environmental Corporation, HNTB, and Pacific Groundwater Group for Port Of Seattle regarding Sea-Tac Airport Master Plan Update Improvements. Analyzes summer low streamflow impacts to Walker Creek and Des Moines Creek from planned airport projects and proposes an offset facility using underground -
2001-12-01
EXH 297: Low Streamflow Analysis Summer Low Flow Impact Offset Facility Proposal STIA Master Plan Update
This December 2001 report, prepared by Parametrix, Inc. and several partner firms for the Port of Seattle, analyzes low streamflow conditions and proposes a Summer Low Flow Impact Offset Facility as part of the Seattle-Tacoma International Airport Master Plan Update Improvements. The study examines how planned airport expansion may affect seasonal low-flow water resources in the surrounding area and outlines mitigation measures to offset those impacts. The report is organized across multiple volumes, with Volume 1 containing the main text and Appendices B through J. -
2001-12-01
EXH AR052659: Low Streamflow Analysis and Summer Low Flow Impact Offset Facility Proposal — Seattle-Tacoma International Airport Master Plan Update Improvements
Parametrix, Inc. report prepared for Port of Seattle, Seattle-Tacoma International Airport Master Plan Update Improvements, December 2001. AR 052659/052660/052661. Volume 1 includes main text and Appendices B through J. Sub-consultants include Aqua Terra Consultants, Earth Tech Inc., Foster Wheeler Environmental Corporation, HNTB, and Pacific Groundwater Group. Addresses low streamflow analysis and summer low flow impact -
2001-12-01
EXH 264: Low Streamflow Analysis Summer Low Flow Impact Offset Facility Proposal — STIA Master Plan Update
This December 2001 technical report, prepared for the Port of Seattle, analyzes low streamflow conditions around Seattle-Tacoma International Airport and proposes a facility to offset the impact of airport Master Plan construction on summer low flows in nearby creeks. It includes hydrologic modeling, water quality design considerations, and an operation and monitoring plan for a stormwater storage and release system intended to maintain stream levels during dry summer months. Note that while archived alongside airport planning documents, this report focuses on water resources and stream impact mitigation rather than noise policy. -
2001-12-01
EXH AR030065: Wetland Functional Assessment and Impact Analysis — Master Plan Update Improvements, Sea-Tac Airport
Wetland Functional Assessment and Impact Analysis prepared by Parametrix, Inc. for Port Of Seattle, December 2001, project number 556-2912-001 (03). Assesses wetland functions and impacts associated with Seattle-Tacoma International Airport Master Plan Update Improvements including the new Third Runway, Runway Safety Areas (RSAs), relocation of South 154th Street, Borrow Area 1 excavation, South Aviation Support -
2001-11-30
PCHB Doc 01-160: Order Granting Intervention — CASE in ACC v. Ecology and Port Of Seattle (§ 401 Certification No. 1996-4-02325)
Pollution Control Hearings Board (PCHB) Order Granting Intervention in case PCHB 01-160, allowing Citizens Against SeaTac Expansion (CASE) to intervene as appellant in the appeal filed by Airport Communities Coalition (ACC) challenging § 401 Certification No. 1996-4-02325 (amended-1) issued by Washington State Department of Ecology to the Port of Seattle on August 10, 2001 (re-issued