TagPollution Control Hearings Board(1532)
-
2001-06-28
EXH AR017273: STIA Construction Site Stormwater Monitoring Report, 6/28/01
STIA construction site stormwater monitoring log dated 6/28/2001, samplers K. Ludwa and J. Brandt. Documents field observations for Phase 3 Embankment Construction, ASR Relocation, and Third Runway Project Office and Parking areas near Lowe Blvd & 12th Ave S, 8th Ave S, Miller Creek, SR509, Wilson Rd, and 12th Ave S. Records pH, turbidity, sheen -
2001-06-28
Declaration of Restrictive Covenants (Tyee Valley Golf Course Mitigation Area)
A draft Declaration of Restrictive Covenants by the Port of Seattle establishing land use restrictions on the Tyee Valley Golf Course Mitigation Area in King County, Washington. The declaration is required by a Washington State Department of Ecology Order and a U.S. Army Corps of Engineers Section 404 Permit related to mitigation activities associated with -
2001-06-27
EXH AR029194: 401 Permit Decision-Making, Sea-Tac Airport Third Runway — Final Draft Technical Meeting Notes, June 25 & 27, 2001
Final draft meeting notes prepared by Rachel McCrea of Floyd & Snider Inc. for 401 Permit Decision-Making technical meetings on June 25 and June 27, 2001, regarding Sea-Tac International Airport Third Runway. Attendees included Ann Kenny and John Drabek (Dept. of Ecology), Kelly Whiting (King County), Keith Smith (Port of Seattle), Paul Fendt and Tom -
2001-06-27
EXH AR017499: Email Chain on Acceptable Fill Criteria Language for Draft 401 Certification — Sea-Tac Third Runway
Internal email chain dated June 27, 2001 among Peter Kmet, Kevin Fitzpatrick, Chung K. Yee, and others at Washington State Department of Ecology regarding acceptable fill criteria language for the Draft 401 Certification for the Seattle-Tacoma International Airport Third Runway Master Plan improvements. Kmet recommends against restricting fill to naturally occurring uncontaminated soils and proposes -
2001-06-27
RE: Acceptable Fill Criteria Language for Draft 401 Certification
An email chain between Washington State Department of Ecology staff discussing acceptable fill criteria language for a Draft 401 Certification related to the Seattle-Tacoma International Airport Third Runway project. Peter Kmet recommends language addressing potential impacts on plants and animals from fill material, including use of Table 749-3 chemical screening values, bioassay testing alternatives, and -
2001-06-27
EXH AR017357: Email Chain RE: Acceptable Fill Criteria Language for Draft 401 Certification — Sea-Tac Airport Third Runway
Internal email chain dated June 27, 2001 from Peter Kmet (Ecology HQ/TCP) to Kevin Fitzpatrick, cc Chung K. Yee, marked ‘Deliberative Document Currently Exempt From Public Disclosure.’ Kmet recommends language for fill material criteria in the Draft 401 Certification for the Seattle-Tacoma International Airport Third Runway project, including: requiring the uppermost 6 feet of fill -
2001-06-26
Exhibit 2134 AR034353: Draft 401 Certification — Acceptable Fill Criteria Language for Third Runway Embankment
Email from Chung K. Yee to Kevin Fitzpatrick, cc Craig E. Thompson and Ann Kenny, dated June 26, 2001, transmitting draft fill criteria language for a 401 Certification related to the Port Of Seattle Third Runway embankment project. Fill criteria are based on Method A table, 3-phase model protection of ground water and surface water, -
2001-06-26
EXH AR017305: Draft 401 Certification — Acceptable Fill Criteria Language for Third Runway Embankment, Port Of Seattle
Email from Chung K. Yee to Kevin Fitzpatrick (cc: Craig E. Thompson, Ann Kenny), dated June 26, 2001, transmitting draft clean fill criteria language for the 401 Certification related to the proposed Third Runway embankment at Sea-Tac Airport. Fill criteria based on Method A table, 3-phase model protection of ground water and surface water, PQL, -
2001-06-26
Exhibit 25: Email from Chung K. Yee re Sea-Tac Third Runway Fill Criteria for 401 Water Quality Certification
Email dated June 26, 2001 from Chung K. Yee to Craig E. Thompson and Kevin Fitzpatrick (Ecology) transmitting draft fill criteria requirements for the 401 Water Quality Certification for the SeaTac Third Runway Embankment project. Attachments include: draft clean fill criteria, spreadsheets deriving surface water quality criteria and ground water cleanup levels using three-phase model -
2001-06-25
Memorandum: Modeled Area and Hydrus Model Results Draft Interim Deliverables
A June 25, 2001 memorandum from Charles Ellingson of Pacific Groundwater Group to Keith Smith of Port Of Seattle presenting draft interim deliverables for Hydrus/Slice modeling of third runway fill at Sea-Tac Airport. The memo defines areas to be modeled by Hydrus/Slice instead of HSPF in the Miller Creek and Walker Creek basins, calculates effective