Notes
Email dated June 26, 2001 from Chung K. Yee to Craig E. Thompson and Kevin Fitzpatrick (Ecology) transmitting draft fill criteria requirements for the 401 Water Quality Certification for the SeaTac Third Runway Embankment project. Attachments include: draft clean fill criteria, spreadsheets deriving surface water quality criteria and ground water cleanup levels using three-phase model per WAC 173-340-747, and a summary table of soil cleanup levels, natural background concentrations, and PQLs. Fill criteria bases include Method A (Table 740-1) and Method B MTCA soil cleanup levels, ecological standards (Table 749-2), NPDES monitoring parameters per 40 CFR Part 122 Appendix D Table III, and three-phase model calculations. Draft document sections E6 (Borrow Sites) and E7 (Fill Source/Documentation/Fill Criteria) specify Port Of Seattle obligations including ASTM E 1527-00 Phase I and E 1903-97 Phase II environmental site assessments for borrow site certification. AR 017310–AR 017312. Exhibit No. 25, dated 12-17-01, M. Green.
