TagPollution Control Hearings Board(1532)
-
2002-01-23
EXH AR004654: Declaration of Jeff Kray — PCHB No. 01-160, ACC v. Ecology and Port Of Seattle
Declaration of Jeff Kray, Assistant Attorney General of Washington, Ecology Division, filed January 23, 2002 in PCHB No. 01-160 before the Pollution Control Hearings Board. Airport Communities Coalition (ACC) and Citizens Against Sea-Tac Expansion (CASE) are appellants against State of Washington Department of Ecology and Port Of Seattle. Attaches two documents: (1) Amended Final Findings -
2002-01-23
EXH AR004678: Port Of Seattle’s Reply Supporting Motion To Compel Document Production — ACC v. Ecology and Port Of Seattle, PCHB Case No. 01-160
Port Of Seattle’s reply brief supporting its motion to compel document production in Pollution Control Hearings Board Case No. 01-160, Airport Communities Coalition v. Department of Ecology and Port Of Seattle. Filed January 23, 2002. Port argues ACC has produced zero documents despite Port producing 22 boxes, 23 compact discs, and 4 hard diskettes. Port -
2002-01-23
EXH AR031469: Review of Third Runway Embankment Fill Monitoring Plan, 401 Certification Condition E.3, Port Of Seattle, November 2001
Internal memo from Ching-Pi Wang to Ann Kenny (cc: Jeannie Summerhays, Steve Alexander), dated January 23, 2002, reviewing the Port of Seattle’s Embankment Fill Monitoring Plan (EFMP) for the Third Runway, 401 Certification Condition E.3. Comments cover requirements for logic tree flow diagrams for tiered sampling and staged screening (groundwater, seepage), statistical methods for baseline -
2002-01-23
Application for Site Certification: Wallula Power Project, Volume 1
This document is an Application for Site Certification for the Wallula Power Project, submitted by Wallula Generation LLC to the State of Washington Energy Facility Site Evaluation Council, with the project developed by Newport Northwest LLC. The application includes details on stormwater management, water rights, and runoff/absorption, describing how rainfall captured over the 66-acre bermed -
2002-01-23
EXH AR004644: Letter from Michael P. Witek (Helsell Fetterman) to Presiding Officer Cottingham Re: ACC v. Ecology and Port Of Seattle, No. 01-160, with Wallula Power Project Site Certification Cover Sheet and 50 C.F.R. §402.02
Letter dated January 23, 2002 from attorney Michael P. Witek of Helsell Fetterman to Presiding Officer Kaleen Cottingham of the Pollution Control Hearings Board (PCHB) in Airport Communities Coalition v. Department of Ecology and Port of Seattle, No. 01-160. Transmits two enclosures inadvertently omitted from Exhibit D to the Second Declaration of Michael P. Witek -
2002-01-23
Application for Site Certification: Wallula Power Project, Volume 1
This is a site certification application for the Wallula Power Project submitted to the State of Washington Energy Facility Site Evaluation Council by Wallula Generation LLC, developed by Newport Northwest LLC. The document discusses stormwater management, runoff absorption, and water rights for the 66-acre project site, including plans to capture and reuse stormwater in the -
2002-01-23
PCHB Doc 4649: Ecology’s Memorandum Opposing ACC’s Application for Certificate of Appealability of the Board’s Order on Motion for Stay
Washington State Department of Ecology memorandum opposing Airport Communities Coalition (ACC) application for Certificate of Appealability of the Pollution Control Hearings Board (PCHB) Stay Order in PCHB No. 01-160. Ecology argues the Board’s stay of the § 401 Certification for the Third Runway Project (Port of Seattle) is not a ‘final decision’ under RCW 34.05.518 -
2002-01-22
PCHB Doc 004708: Second Declaration of Michael P. Witek in Support of ACC’s Motion for Summary Judgment
Second Declaration of Michael P. Witek, attorney for Airport Communities Coalition (ACC), filed January 22, 2002, before the Pollution Control Hearings Board (PCHB), Case No. 01-160. Supports ACC’s Motion for Summary Judgment challenging Section 401 Water Quality Certification No. 1996-4-02325 and CZMA concurrency statement issued August 10, 2001, by Washington State Department of Ecology related -
2002-01-22
PCHB Doc 01-160: Discovery Order and Modification of Pre-Hearing Deadlines — ACC v. Ecology and Port Of Seattle
Pollution Control Hearings Board (PCHB) case 01-160 discovery order dated January 22, 2002, resolving four motions: ACC’s motion to compel inspection of Port Of Seattle airport property, ACC’s motion to extend discovery schedule, Port Of Seattle’s motion to compel depositions and limit entry onto land, and Port Of Seattle’s motion to compel production of documents -
2002-01-22
Summit Ridge Fill Source Memo
A memorandum from Beth Clark to Paul Agid dated January 22, 2002, summarizing the sequence of events related to petroleum-impacted soil from the Summit Ridge fill source in Bellevue, Washington that was placed in the Third Runway embankment. The memo details how approximately 1540 tons of soil were removed from the Third Runway after petroleum