TagPollution Control Hearings Board(1532)
-
2002-01-23
EXH AR004644: Letter from Michael P. Witek (Helsell Fetterman) to Presiding Officer Cottingham Re: ACC v. Ecology and Port Of Seattle, No. 01-160, with Wallula Power Project Site Certification Cover Sheet and 50 C.F.R. §402.02
Letter dated January 23, 2002 from attorney Michael P. Witek of Helsell Fetterman to Presiding Officer Kaleen Cottingham of the Pollution Control Hearings Board (PCHB) in Airport Communities Coalition v. Department of Ecology and Port of Seattle, No. 01-160. Transmits two enclosures inadvertently omitted from Exhibit D to the Second Declaration of Michael P. Witek -
2002-01-23
EXH AR025095: Application Site Certification — Wallula Power Project Vol. 1
This document is an Application for Site Certification for the Wallula Power Project in Washington State, submitted by Wallula Generation LLC to the State of Washington Energy Facility Site Evaluation Council. The application details water management plans for the proposed power plant, including how stormwater runoff from the 66-acre site will be captured, routed through oil/water separators, and reused in the plant's cooling tower basin. The applicant argues that this stormwater reuse strategy will reduce groundwater withdrawals from the local gravel aquifer with no net regional impact on water resources. -
2002-01-23
PCHB Doc 4649: Ecology’s Memorandum Opposing ACC’s Application for Certificate of Appealability of the Board’s Order on Motion for Stay
Washington State Department of Ecology memorandum opposing Airport Communities Coalition (ACC) application for Certificate of Appealability of the Pollution Control Hearings Board (PCHB) Stay Order in PCHB No. 01-160. Ecology argues the Board’s stay of the § 401 Certification for the Third Runway Project (Port of Seattle) is not a ‘final decision’ under RCW 34.05.518 -
2002-01-22
PCHB Doc 004708: Second Declaration of Michael P. Witek in Support of ACC’s Motion for Summary Judgment
Second Declaration of Michael P. Witek, attorney for Airport Communities Coalition (ACC), filed January 22, 2002, before the Pollution Control Hearings Board (PCHB), Case No. 01-160. Supports ACC’s Motion for Summary Judgment challenging Section 401 Water Quality Certification No. 1996-4-02325 and CZMA concurrency statement issued August 10, 2001, by Washington State Department of Ecology related -
2002-01-22
PCHB Doc 01-160: Discovery Order and Modification of Pre-Hearing Deadlines — ACC v. Ecology and Port Of Seattle
Pollution Control Hearings Board (PCHB) case 01-160 discovery order dated January 22, 2002, resolving four motions: ACC’s motion to compel inspection of Port Of Seattle airport property, ACC’s motion to extend discovery schedule, Port Of Seattle’s motion to compel depositions and limit entry onto land, and Port Of Seattle’s motion to compel production of documents -
2002-01-22
EXH AR019668: Memo Clark to Agid – Summit Ridge Fill Source & Petroleum-Impacted Soil, Third Runway Embankment
This January 2002 memo from the Port of Seattle describes an environmental incident in which soil from the Summit Ridge fill site in Bellevue, Washington—potentially contaminated with petroleum hydrocarbons from a former home heating oil tank—was temporarily placed in the Third Runway embankment during construction. Upon discovery of the contamination in October 2000, the Port halted all haul from the site and removed approximately 1,540 tons of soil, disposing of it at a facility in Everett. The Port subsequently implemented additional environmental safeguards, including full-time on-site supervision, to prevent further transport of impacted soil to the Third Runway. -
2002-01-22
EXH 292: Memo — Black River Quarry Fill Material Testing TPH Metals Third Runway Embankment
This memo from Port of Seattle environmental staff describes chemical testing of rock aggregate imported from Black River Quarry for use in the Third Runway embankment at Sea-Tac Airport. Testing revealed petroleum hydrocarbons (TPH) and elevated copper levels in some samples, traced to contamination from on-site asphalt recycling operations. As a result, the Port restricted material acceptance to newly blasted rock only and halted imports from the quarry in mid-October 2000 pending operational changes and additional testing. -
2002-01-21
EXH AR031548: Wetlands on STIA North End Properties — Supplemental Information Regarding Wetlands (Parametrix Technical Memorandum)
Parametrix, Inc. technical memorandum dated January 21, 2002, from Jim Kelley, Ph.D., to Muffy Walker, US Army Corps of Engineers Regulatory Branch, regarding Port Of Seattle permit 1996-4-02325 (Sea-Tac Airport Master Plan Update). Provides supplemental information on wetland impacts in upper watersheds of Miller Creek, Walker Creek, and Des Moines Creek, including percent loss of -
2002-01-19
EXH 389: Declaration Amanda Azous Supporting ACC Reply Motion for Stay
A wetlands scientist named Amanda Azous filed a legal declaration opposing the Port of Seattle's airport expansion project, arguing that filling approximately 2.8 acres of wetlands near Miller Creek would cause serious and irreversible environmental harm. She contends that the Port's mitigation plan—relying on stormwater management, embankment walls, and upland planting—cannot adequately replace the lost wetland functions, particularly the critical water and nutrient flows these wetlands provide to the broader Miller Creek watershed. The declaration was submitted in support of the Airport Communities Coalition's motion to halt the project before the Washington Pollution Control Hearings Board in 2001. -
2002-01-18
EXH AR013806: ACC v. DOE et al. — Table of Cases Cited in Discovery Motions and Responses
Airport Communities Coalition (ACC) v. Department of Ecology et al., PCHB No. 01-160. Table of 17 cases cited in discovery motions and responses, received by the Environmental Hearings Office on January 18, 2002. Cases include: American Medical Systems v. National Union Fire Insurance (E.D. La. 1999), Belcher v. Bassett Furniture Industries (4th Cir. 1978), Boring