2001-06-22
Exhibit 2043: TCP Recommendations for 401 Certification and Analysis of Preferential Ground Water Flow Paths Relative to Proposed Third Runway, STIA
Memo dated June 22, 2001 from Ching-Pi Wang (Toxics Cleanup Program, TCP) to Ann Kenny regarding TCP recommendations for 401 certification related to the proposed Third Runway at Seattle-Tacoma International Airport (STIA). Three recommendations: (1) Port of Seattle to develop a plan by September 14, 2001 to monitor contaminant transport to soil and groundwater via -
2001-06-22
EXH AR021830: GeoSyntec Letter — ACC Response to Comments, West MSE Wall Seismic Stability, Third Runway
GeoSyntec Consultants, hired by the Airport Communities Coalition, wrote to the U.S. Army Corps of Engineers and Washington State Department of Ecology in June 2001 raising serious technical concerns about the proposed Third Runway Expansion at Seattle-Tacoma International Airport. The letter challenges the Port of Seattle's geotechnical analysis for the West Mechanically Stabilized Earth (MSE) Wall, arguing that soil strength testing was insufficient, the extent of liquefiable material may have been underestimated, and seismic stability analyses were being performed incorrectly. GeoSyntec concluded that the Port had not yet demonstrated the wall could be safely and economically constructed to withstand potential seismic loads without unacceptable deformation. -
2001-06-22
Exhibit 73: TCP Recommendations for 401 Certification — Port Of Seattle Third Runway
Memorandum from Ching-Pi Wang to Ann Kenny (cc: Ray Hellwig, Roger Nye, John Wietfeld, Steve Alexander) dated June 22, 2001, outlining Toxics Cleanup Program (TCP) recommendations for 401 certification related to the Port Of Seattle Third Runway project. Three recommendations: (1) Port Of Seattle to develop a plan by September 14, 2001 to monitor contaminant -
2001-06-21
EXH AR050665: Ecology & Port Of Seattle Letter to Army Corps of Engineers Extending Coastal Zone Management Consistency Review Deadline
Letter dated June 21, 2001 from Jeannie Summerhays (Washington Department of Ecology, Northwest Regional Office) and Elizabeth Leavitt (Port Of Seattle, Aviation Environmental Programs, Seattle-Tacoma International Airport) to Tom Mueller, Chief, Department of the Army Corps of Engineers, Seattle District, Regulatory Branch. Pursuant to 15 CFR § 930.60, Ecology and the Port Of Seattle mutually -
2001-06-21
EXH AR018374: Record of Telecon with Ann Kenny Regarding Scope Changes, Low Flow Meeting, and Parametrix
Record of telecon dated 6-21-01, call from Ann Kenny. Notes that Port has agreed to pay for new scope and minor plan sheet changes. Jim to be given confirmation in writing. July 9th Low Flow meeting scheduled. Parametrix involvement noted — panel 6 may be larger with potential impact. Meeting with Corps to be set -
2001-06-20
EXH AR023116: Rebuttal to Response to 401/404 Comments, Miller Creek Relocation Project, STIA Master Plan Update
A biologist from Columbia Biological Assessments submitted a rebuttal in June 2001 challenging the Port of Seattle's environmental justifications for proposed construction improvements at Seattle-Tacoma International Airport. The letter argues that the Port failed to adequately assess impacts on Miller Creek, particularly regarding fish habitat, water temperature, and dissolved oxygen levels in a relocated section of the creek. The author contends that no proper baseline survey of fish and aquatic life was conducted, making regulatory approval of the project scientifically premature. -
2001-06-20
EXH AR021386: Rebuttal to Response to 401/404 Comments, Miller Creek Relocation & Master Plan Update, STIA
A biologist with Columbia Biological Assessments submitted a formal rebuttal in June 2001 challenging the Port of Seattle's environmental responses related to proposed Master Plan Update Improvements at Seattle-Tacoma International Airport. The rebuttal argues that the Port failed to adequately assess impacts on Miller Creek, particularly regarding fish habitat, water temperature, and dissolved oxygen levels during summer months. The author contends that no proper baseline survey of fish and aquatic organisms was conducted, making regulatory approval and proposed mitigation measures scientifically insufficient. -
2001-06-19
Exhibit 76: Analysis of Preferential Ground Water Flow Paths Relative to Proposed Third Runway, STIA
Draft technical memorandum prepared by Associated Earth Sciences, Inc. (AESI, Project No. BV99122C) for Port Of Seattle, dated June 19, 2001, analyzing preferential ground water flow paths relative to the proposed Third Runway at Seattle-Tacoma International Airport (STIA). Evaluates potential contaminant migration from the Aviation Operations and Maintenance Area (AOMA) to the third runway construction -
2001-06-19
EXH AR17302: Email Chain RE: Acceptable Fill Criteria Language for Draft 401 Certification
Email chain (AR017302) among Washington State Department of Ecology staff Chung K. Yee, Kevin Fitzpatrick, Craig Thompson, and AAG Joan Marchioro regarding acceptable fill criteria language for the Draft 401 Water Quality Certification for the Seattle-Tacoma International Airport Third Runway project. Key issues include: whether Ecology’s 401 WQ Certification fill criteria should ‘stand alone’ from -
2001-06-19
EXH AR050641: Draft Technical Memorandum — Analysis of Preferential Ground Water Flow Paths Relative to Proposed Third Runway, STIA
Draft technical memorandum prepared by Associated Earth Sciences, Inc. (AESI, Project No. BV99122C) for Port Of Seattle, dated June 19, 2001, analyzing preferential ground water flow paths relative to the proposed Third Runway at Seattle-Tacoma International Airport (STIA). Responds to Washington Department of Ecology (Ecology) request regarding whether contaminated ground water below the Aviation Operations