Notes
Hart Crowser Senior Principal Michael Bailey transmits revised draft plans and cross sections for the Borrow Area 3 Wetland Protection Swale (Job No. 4978-06) to Jim Kelley at Parametrix, June 18, 2001. Documents include Figure 1 (Post-Reclamation Topography and Drainage Facilities), Figure 2 (Typical Cross Sections), Figure 3 (Post-Reclamation Topographical Detail), and Figure 4 (Proposed Wetland Protection Swale Profile and Cross Section). The swale provides mitigation of potential seepage changes from Third Runway excavation. Copies sent to Ann Kenny at Washington Department of Ecology, Katie Walter at Shannon and Wilson, Elizabeth Leavitt and Ralph Wessels at Port of Seattle, and Alan Black and Jim Thomson at HNTB. AR030796, AR030797, AR030798.
