Skip to content
  • STNI
  • Statistics
    • Ops and Passengers
      • King County International Airport (Boeing Field) Annual Operations
    • Financials
    • Aviation fuel uplift in the State of Washington 2018 – 2025
      • Aviation Fuel Tax Revenue in the State of Washington 1983-2025
      • Aviation Fuel Uplift at Sea-Tac Airport
    • Air Quality Monitoring
    • Flight Tracking
      • Flow and Flight Tracks
      • Five Year Comparison
      • Busiest Hours and Days
    • SEL Noise Reports & Graphs
      • About The Permanent Noise Monitors
      • Minutes of Quiet by Noise Monitor
      • Noise Events mapped
      • Noise Events (SEL)
    • Runways
    • Employees
    • Real Estate
      • Port Properties and Trees mapped
    • Parking
  • Events
  • Protest
    • Regular Events
    • Policy
      • Legislative Agenda 2027
      • Airport mitigation for the twenty first century
      • Port Dracula
    • Complain about a particular flight
    • Advocacy Organizations
    • Media Outlets
    • People
    • The Port of Seattle
      • Commission Meetings
      • Public Records Requests
      • StART
      • Highline Forum
    • Contact Your Electeds
  • Resources
    • FAQs
      • FAA Occurrences/Accidents/Indents
    • The SAMP
      • SAMP Public Comment Template
        • Two versions of Appendix K: NEPA/SEPA 2018 vs 2023
      • SAMP NTP: 31 projects by the numbers
      • SEPA Draft EIS (2026)
      • SAMP Record of Decision/FONSI (2025)
      • SAMP Draft EA (October 2024)
      • 2018 Scoping
    • Port Packages
      • Port Package Property Costs
      • Port Packages mapped
      • The Port Package Explainer
      • So you want a (first-time) Port Package? Start here
      • Port Package Looker Upper
      • How do I determine if I have a Port Package or Avigation Easement?
      • Progress on Port Package Update legislation
      • Having a Port Package Problem?
      • Port Package Site Visit Follow-Up
    • Document Library
    • Explainers
      • The Airport Law Cheat Sheet
      • The Grant Explainer
    • External Articles
    • History
      • Timeline
      • The Sea-Tac Communities Plan
        • Sea-Tac Communities Plan – Planning Maps
      • PSRC Third Runway Decision Process
    • Studies
    • Videos
  • Stories
  • Mission
  • Subscribe
  • Contact
Scroll down to content

Get InformedStay Informedx

I understand that you will never share my information with anyone, you will only use it to keep me updated on relevant events and that I may unsubscribe at any time.

STNI

STNISea-Tac Noise.Info

  • Solve for Sea-Tac. Solve for every airport.
  • Since 2016, working to obtain justice for everyone living under the flight path.
  • Less Noise. Cleaner Air. Better Public Health. Compensation.
  • Everything you think you know about the airport is wrong.

TagStormwater(373)

Advanced Search Options

  • Dates
  • Media
    • External Articles
    • Images
    • PDFs
    • Video
    • Audio
  • Order By
  • 2001-06-22

    Aerial View of Retention Pond Construction Adjacent to Sea-Tac Airport Runway

    Aerial photograph showing a large retention/sedimentation pond under construction adjacent to an airport runway and taxiway, with active earthmoving equipment visible. A major road intersection, commercial warehouses, and parking areas are visible in the foreground, consistent with the industrial corridor south of a major commercial airport.
    TagsAirport Expansion, Construction, Sea-Tac Airport, StormwaterFolderWatershed Aerial Photos
  • 2001-06-22

    Sea-Tac Airport Runways, Taxiways, and Stormwater Retention Ponds — Aerial View

    Aerial photograph showing a large airport's runway and taxiway system in the background, with a forested buffer zone and what appear to be stormwater retention or water treatment ponds in the foreground. The layout, scale, and Pacific Northwest landscape context (evergreen trees, mountain range, urban development) are consistent with a major regional airport facility.
    TagsRunways, Sea-Tac Airport, Stormwater, TaxiwaysFolderWatershed Aerial Photos
  • 2001-06-22

    Sea-Tac Airport Aerial View Showing Runway, Road Tunnel, Retention Pond Under Construction, and Fuel Farm

    Aerial photograph showing an airport runway (with visible threshold markings), a road tunnel/underpass passing beneath the airfield, a large retention or sedimentation pond under apparent construction, and surrounding industrial and commercial development. Fuel storage tanks are visible in the upper portion of the image, consistent with airport fuel farm infrastructure.
    TagsConstruction, Runways, Sea-Tac Airport, StormwaterFolderWatershed Aerial Photos
  • 2001-06-22

    Sea-Tac Airport Runways with Retention Pond Under Construction and Adjacent Warehouse Buildings

    Aerial photograph showing Sea-Tac Airport runways and taxiways in the upper portion of the frame, with a retention/detention pond under construction in the middle ground and commercial/industrial warehouse buildings in the foreground. The image appears to document airport-adjacent land use and stormwater infrastructure, likely relevant to airport expansion or environmental compliance activities.
    TagsAirport Expansion, Construction, Runways, Sea-Tac Airport, StormwaterFolderWatershed Aerial Photos
  • 2001-06-22

    Aerial View of Highway Tunnel Portal, Retention Pond, and Sea-Tac Airport Runway Under Construction

    Aerial photograph showing a highway with a tunnel portal, a rectangular concrete structure with green equipment units, a newly constructed retention/settling pond with orange sandy margins, and an airport runway in the background. The site appears to be an active construction project, likely stormwater or noise mitigation infrastructure, situated between a major freeway and an airport airfield.
    Tags4th Runway, Construction, Sea-Tac Airport, StormwaterFolderWatershed Aerial Photos
  • 2001-06-22

    Aerial View of Retention Pond Construction Near Sea-Tac Airport Runway

    Aerial photograph showing a retention or settling pond under construction near an airport runway, with associated site infrastructure including what appears to be a treatment facility or staging area to the left. The airport runway, taxiways, and terminal buildings are visible in the background, consistent with Sea-Tac Airport environs.
    TagsConstruction, Sea-Tac Airport, StormwaterFolderWatershed Aerial Photos
  • 2001-06-22

    Aerial View of Retention Pond Under Construction at Sea-Tac Airport

    Aerial photograph showing a large oval retention or settling pond under active construction, with construction equipment visible along its perimeter. In the background, an airport runway and taxiway are visible, along with a large white aircraft maintenance or assembly facility bearing a partially visible red logo consistent with a major airline.
    TagsAircraft Maintenance, Construction, Sea-Tac Airport, StormwaterFolderWatershed Aerial Photos
  • 2001-06-18

    EXH AR050603: Avoidance of Wetland Impacts, Temporary Stormwater Pond A, Sea-Tac Third Runway

    Hart Crowser, Inc. report prepared for HNTB and the Port of Seattle, project number 4978-06, dated June 18, 2001, addressing avoidance of wetland impacts associated with Temporary Stormwater Pond A for the Sea-Tac Third Runway project. Includes summary of subsurface conditions, protection of wetlands analysis, groundwater seepage analysis, observed groundwater levels in monitoring wells near
    TagsACC, Environment, Pollution Control Hearings Board, Port Of Seattle, Stormwater, Third RunwayFolderBox 21
  • 2001-06-18

    EXH AR030796: Hart Crowser Letter of Transmittal — Borrow Area 3 Wetland Protection Swale Draft Plans, Third Runway Project

    Hart Crowser Senior Principal Michael Bailey transmits revised draft plans and cross sections for the Borrow Area 3 Wetland Protection Swale (Job No. 4978-06) to Jim Kelley at Parametrix, June 18, 2001. Documents include Figure 1 (Post-Reclamation Topography and Drainage Facilities), Figure 2 (Typical Cross Sections), Figure 3 (Post-Reclamation Topographical Detail), and Figure 4 (Proposed
    TagsACC, Ecology, Hillgrove Cemetery, Pollution Control Hearings Board, Port Of Seattle, Stormwater, Third RunwayFolderBox 12
  • 2001-06-07

    Exhibit 204: Email from Tom Luster re: Sea-Tac NPDES Permit Review, 401 Certification, and Construction BMPs

    In this June 2001 internal email, Tom Luster documents a conversation with Ann K. regarding Senator Patterson's request that he review an NPDES stormwater permit related to the Sea-Tac Airport expansion project. Luster notes concerns about whether construction Best Management Practices (BMPs) in the permit were sufficient to meet water quality standards under Section 401 requirements, stating that BMPs with a history of non-compliance should be replaced with proven alternatives. He also addresses his role as an independent reviewer, emphasizing his goal of ensuring a legally defensible decision rather than advocating for any particular party's position.
    TagsACC, Ecology, NPDES, PCHB, Pollution Control Hearings Board, Stormwater, Third RunwayFolderBox 08

Posts pagination

Page 1 … Page 18 Page 19 Page 20 Page 21 Page 22 … Page 38
Sidebar On/Off

Upcoming Events

  • Part 150 NCP Workshop — Burien
    Add to CalendarMSaturday Oct 17: 10:00am

    Attend a Port of Seattle open house on the Part 150 Study Noise Compatibility Program (NCP). The Part 150 program determines the noise boundary around the airport and opportunities for noise mitigation such as sound insulation.

    [...]
  • Part 150 NCP Workshop — SeaTac
    Add to CalendarMMonday Oct 19: 6:00pm

    Attend a Port of Seattle open house on the Part 150 Study Noise Compatibility Program (NCP). The Part 150 program determines the noise boundary around the airport and opportunities for noise mitigation such as sound insulation.

    [...]
  • Part 150 NCP Workshop — Des Moines
    Add to CalendarMTuesday Oct 20: 6:00pm

    Attend a Port of Seattle open house on the Part 150 Study Noise Compatibility Program (NCP). The Part 150 program determines the noise boundary around the airport and opportunities for noise mitigation such as sound insulation.

    [...]

[See all...]


Issues

Sea-Tac Airport is currently undergoing the largest and longest expansion in its history, collectively known as the Sustainable Airport Master Plan (SAMP). Some of it you can already hear, but you’re probably not aware of what it all means. Here’s what you need to know.
read more...

Read This!

As the source for federal transportation grants, the Puget Sound Regional Council was charged with developing a system to meet the growing need for commercial aviation. When the search for a second airport failed, they authorized the Port of Seattle to build the Third Runway, with a mandate to develop a noise abatement and mitigation program. In their effort to stop the Third Runway, the ACC argued over every detail of the Port's efforts--including property buyouts and sound insulation. The dispute was meant to be settled by a three member Expert Arbitration Panel. This is their final report. It finds 2-1, that the Port's program was insufficient in several respects. Despite that, funding for the Third Runway was approved by the PSRC, and the 'Port Package' program, proceeded largely unchanged. Expert Arbitration Panel's final decision finding that the Port of Seattle had not shown sufficient reduction in real on-the-ground noise impacts to satisfy noise reduction conditions required for approval of a third runway at Sea-Tac International Airport. The majority decision concluded the Port's noise abatement programs were insufficient despite being impressive in scope.
continue...

  • Sea-Tac Noise.Info
  • Connect with STNI

    • Subscribe
    • Port Package Problem?
    • Donate
    • Podcast
    • Socials
      • Facebook
      • X (Twitter)
      • Bluesky
      • Instagram
  • Learn

    • Frequently Asked Questions
    • Explainers
    • Youtube
    • Research Requests
    • Complain about one flight
  • Goals

    Fulfill the promises of 1976:
    • Compensation
    • Reduced noise
    • Improved air quality
    • Environmental remediation
Login/Register
©2026•Data Privacy

Message

We use cookies to provide basic functionality. We also provide access to search engines in order to provide site analytics. We do not sell or share your data.
V V