TagPort Of Seattle(2611)
-
2001-08-01
EXH AR017586: Water Quality Certification #1996-4-02325 Draft, Page 16-17 — Operational Stormwater Requirements for STIA
Draft Water Quality Certification #1996-4-02325, pages 16-17 of 23, dated August 2001, issued by Washington State Department of Ecology regarding Port Of Seattle Seattle-Tacoma International Airport (STIA). Covers operational stormwater requirements including the approved Comprehensive Stormwater Management Plan (CSMP) Volumes 1-4 December 2000 as revised July 2001, retrofitting of stormwater management facilities, discharge of operational -
2001-08-01
EXH AR017820: Email Chain — Ecology Internal Communications on Third Runway Decision Announcement Strategy
Internal email chain dated August 1, 2001 among Washington Department of Ecology staff Thomas Fitzsimmons, Sheryl Hutchison, Dianne Pastore, and Raymond Hellwig regarding communications strategy around the Sea-Tac Airport third runway decision. Topics include scheduling media availability, coordinating with the governor and Isaki, Port Commission meeting on August 14, E-Board contact timing, press attendance at -
2001-08-01
EXH AR1278: Sand and Gravel Stormwater Pollution Prevention Plan — Third Runway Project Borrow Areas 3 and 4, Seattle-Tacoma International Airport
Sand and Gravel Stormwater Pollution Prevention Plan (SWPPP) prepared by Parametrix, Inc. for Port of Seattle, covering Borrow Areas 3 and 4 of the Third Runway Project at Seattle-Tacoma International Airport. Prepared August 2001, approved by Michael Feldman, Director of Aviation Facilities, Port of Seattle. Document checked by Paul Fendt, P.E. and prepared by Julie -
2001-08-01
EXH AR050792: Supplemental Information — Cumulative Impacts to Wetlands and Streams, STIA Master Plan Update Improvements
Parametrix, Inc. report prepared for Port Of Seattle on cumulative impacts to wetlands and streams from Seattle-Tacoma International Airport Master Plan Update improvements, August 2001 (AR 050792, Exhibit 1267). Covers land use changes in Miller Creek and Des Moines Creek watersheds, wetland inventories, soil survey maps, aerial photograph analysis, stream conditions and fish habitat in -
2001-07-31
Exhibit 2011: Port Of Seattle Letter to Ecology — Conceptual Drawing for Flow Impact Offset Facility, Sea-Tac Airport
Letter dated July 31, 2001 from Keith R. Smith, Water Resources Manager at Port Of Seattle, to Ms. Ann E. Kenny at the Washington State Department of Ecology Northwest Regional Office (Bellevue, WA 98008-5452), transmitting conceptual drawings for the proposed Flow Impact Offset Facility at Seattle-Tacoma International Airport. Drawings relate to reserved stormwater release storage, -
2001-07-30
EXH AR025049: Draft 401 Certification — Acceptable Fill Criteria & Prohibited Fill Material Language (July 30, 2001)
This July 2001 draft document outlines clean fill criteria for the Port of Seattle's Third Runway construction project at Sea-Tac Airport, requiring the Port to submit environmental assessment documentation to the Washington Department of Ecology before placing any fill material. It specifies that fill may only come from state-certified borrow pits, contractor-certified construction sites, or Port-owned properties, while prohibiting the use of any contaminated or remediated soils. The document details testing and sampling requirements, including review of contamination records and analysis of hazardous substances, to ensure that no toxic materials are introduced into wetlands or state waters during construction. -
2001-07-29
EXH 446: Prelim Draft 401 Water Quality Cert Third Runway — Internal Deliberative Email
In July 2001, Washington State Department of Ecology staff circulated a confidential preliminary draft of a Section 401 Water Quality Certification related to the construction of a third runway at Seattle-Tacoma International Airport. The draft certification, addressed to the Port of Seattle, confirmed that the proposed runway project complied with applicable provisions of the Clean Water Act and the Washington State Coastal Zone Management Program, subject to stormwater and other water quality conditions. The document was still under internal review, with sections on stormwater management and low-flow conditions pending further input before finalization. -
2001-07-29
EXH AR017796: Preliminary Draft 401 Water Quality Certification for Third Runway — Internal Email and Draft
Email from Ann Kenny (Ecology) dated July 29, 2001, to the 401 WQC team — including Raymond Hellwig, Kevin Fitzpatrick, John Drabek, Ching-Pi Wang, Erik Stockdale, Joan Marchioro (ATG), Tom Young (ATG), Katie Walter, and Kelly Whiting, cc Jeannie Summerhays — transmitting a preliminary deliberative draft 401 Water Quality Certification (WQC) for the Third Runway -
2001-07-25
EXH AR029221: Port Of Seattle Letter to Ecology on Low Streamflow Analysis, Summer Low Flow Impact Offset Facility, STIA
Letter dated July 25, 2001 from Keith R. Smith, Water Resources Manager, Port Of Seattle, to Ann E. Kenny, Washington Department of Ecology Northwest Regional Office, clarifying the Low Streamflow Analysis and Summer Low Flow Impact Offset Facility Proposal for Seattle-Tacoma International Airport. Corrections address: embankment recharge calculation using ‘flat outwash grass’; non-contiguous groundwater contributions -
2001-07-24
EXH AR029208: 401 Permit Decision-Making, Sea-Tac Airport Third Runway — Final Meeting Notes, Low Flow Analysis
Final meeting notes from July 24, 2001 conference call on 401 Permit Decision-Making for Sea-Tac International Airport Third Runway, Low Flow Analysis. Prepared by Kate Snider, Floyd & Snider Inc. Attendees included Ann Kenny (Dept. of Ecology), Kelly Whiting (King County), Keith Smith (Port of Seattle), Paul Fendt (Parametrix), Joe Brascher (Aquaterra). Discusses Port of