TagPort Of Seattle(2611)
-
2001-12-12
EXH AR026986: Third Runway Project Off-Site Borrow Source Baseline Chemical Characterization, Marine View Pit, Fife, Washington
Hart Crowser, Inc. report prepared for Port Of Seattle, December 12, 2001, project number 4978-06. Baseline chemical characterization of the Marine View Pit in Fife, Washington, as an off-site borrow source for the Third Runway Project at Sea-Tac Airport. Report includes total metals analytical results, soil sample descriptions, site plan schematic and sample location map, -
2001-12-12
EXH 294: Third Runway Off-Site Borrow Source Baseline Chemical Characterization, Black River Quarry, Renton WA
This December 2001 report, prepared by Hart Crowser, Inc. for the Port of Seattle, presents baseline chemical characterization results for the Black River Quarry in Renton, Washington, which was evaluated as an off-site borrow source of fill material for the Sea-Tac Third Runway Project. The study involved soil sampling, metals analysis, and data quality review to assess the suitability of quarry material for use in runway construction. Tables and figures detail sample locations, soil descriptions, and total metals analytical results from laboratory testing by North Creek Analytical, Inc. -
2001-12-11
PCHB 01-160: Order on ACC’s Motion to Supplement the Record
Pollution Control Hearings Board (PCHB) Order in case PCHB 01-160 denying Airport Communities Coalition (ACC) motion to supplement the record on its motion for stay of § 401 Certification No. 1996-4-02325 (amended-1) issued by the Washington State Department of Ecology. ACC filed the motion on November 16, 2001; Port Of Seattle opposed on November 26, -
2001-12-10
PCHB Doc 5830: Ecology Response to Motion to Intervene from CASE
Washington State Department of Ecology’s response to Citizens Against Sea-Tac Expansion (CASE) motion to intervene in PCHB No. 01-160, Airport Communities Coalition (ACC) v. State of Washington Department of Ecology and Port Of Seattle. Ecology concurs with Port Of Seattle’s requested limits on intervention and does not oppose CASE’s motion. Filed December 10, 2001; signed -
2001-12-10
EXH AR005834: Notice of Association of Counsel — ACC v. Ecology and Port Of Seattle (PCHB No. 01-160)
Notice of Association of Counsel filed December 10, 2001 in PCHB No. 01-160, before the Pollution Control Hearings Board, State of Washington. Jeff B. Kray, Assistant Attorney General, Ecology Division, associates with Joan M. Marchioro and Thomas J. Young to represent the Washington State Department of Ecology. Appellant is Airport Communities Coalition; respondents are State -
2001-12-07
EXH 450: Ecology Draft Memo Requesting Ching-Pi Wang Review Third Runway Embankment Seepage Groundwater Monitoring Plan
In December 2001, Ann Kenny of the Washington Department of Ecology's Northwest Regional Office drafted a memo requesting that hydrogeologist Ching-Pi Wang review a groundwater and seepage monitoring plan submitted by the Port of Seattle for the proposed third runway at Seattle-Tacoma International Airport. The plan, titled 'Third Runway Embankment Seepage and Groundwater Monitoring Plan,' was submitted on November 16, 2001, and required expert review before Ecology could approve it. Wang was asked to provide written comments on the plan's adequacy and any recommended changes by January 18, 2002. -
2001-12-06
EXH AR005836: Port Of Seattle’s Response to Motion to Intervene from CASE, PCHB Case No. 01-160
Port Of Seattle response filed December 6, 2001 to motion to intervene by Citizens Against Sea-Tac Expansion (CASE) in Pollution Control Hearings Board (PCHB) Case No. 01-160, Airport Communities Coalition (ACC) v. Department of Ecology and Port Of Seattle. Port does not oppose CASE intervention if limited under WAC 371-08-420(1): CASE barred from raising new -
2001-12-05
EXH AR005840: ACC’s Response to CASE’s Motion to Intervene, PCHB No. 01-160
Airport Communities Coalition (ACC) response to Citizens Against Sea-Tac Expansion (CASE) Motion to Intervene in PCHB No. 01-160, filed December 5, 2001 before the Pollution Control Hearings Board for the State of Washington. ACC does not object to CASE’s intervention but agrees it should not interfere with ACC’s pending Motion for Stay. Respondents are State -
2001-12-01
EXH AR030065: Wetland Functional Assessment and Impact Analysis — Master Plan Update Improvements, Sea-Tac Airport
Wetland Functional Assessment and Impact Analysis prepared by Parametrix, Inc. for Port Of Seattle, December 2001, project number 556-2912-001 (03). Assesses wetland functions and impacts associated with Seattle-Tacoma International Airport Master Plan Update Improvements including the new Third Runway, Runway Safety Areas (RSAs), relocation of South 154th Street, Borrow Area 1 excavation, South Aviation Support -
2001-12-01
EXH 297: Low Streamflow Analysis Summer Low Flow Impact Offset Facility Proposal STIA Master Plan Update
This December 2001 report, prepared by Parametrix, Inc. and several partner firms for the Port of Seattle, analyzes low streamflow conditions and proposes a Summer Low Flow Impact Offset Facility as part of the Seattle-Tacoma International Airport Master Plan Update Improvements. The study examines how planned airport expansion may affect seasonal low-flow water resources in the surrounding area and outlines mitigation measures to offset those impacts. The report is organized across multiple volumes, with Volume 1 containing the main text and Appendices B through J.