Notes
Internal email chain dated September 10, 2001 forwarding a summary of the Port of Seattle Third Runway Stipulated Agreement to Governor’s office contact Paul Isaki. Authored by Thomas Fitzsimmons, forwarded by Raymond Hellwig to Ann Kenny, Jeannie Summerhays, and Gordon White. Summarizes 13 issues in three categories: (1) changes to clarify scope and duration of the Section 401 water quality certification (wetland mitigation, low flow requirements in perpetuity, 15-year wetland monitoring, 8-year other monitoring, 401 vs. 402 NPDES baseline); (2) clarifications to specific conditions including twice-monthly hydrologic monitoring, mineral soils wetland monitoring correction (16 inches vs. 10 inches), Borrow Area 3 buffer requirement, fill acceptance criteria for wetlands and waters of the state, Water Effects Ratio study, Miller Creek sewer relocation, monthly as-built reports; (3) minor text changes regarding stormwater pond overtopping and visible oil sheen. References Army Corps of Engineers Section 404 permit, Washington State Department of Ecology, Miller Creek, and third runway embankment fill. Filed under PCHB administrative record AR 023886.
