TagPort Of Seattle(2611)
-
2002-01-02
EXH AR026605: Seattle Master Plan Update — Natural Resources Mitigation Plan Changes (Auburn Grading Plan, June 28, 2001)
This document summarizes changes made to the Port of Seattle Master Plan Update's Natural Resources Mitigation Plan to comply with a Water Quality Certification issued September 21, 2001. It outlines revisions to grading plans, culvert placements, wetland crossings, drainage controls, and planting schedules at the Auburn mitigation site, along with corresponding resolutions for each identified concern. The updates address issues such as water impoundment, erosion prevention, bald eagle habitat protection, and invasive species removal. -
2002-01-02
PCHB AR005758: Port Of Seattle Petition for Review of PCHB Order Granting Motion to Stay Section 401 Certification (Third Runway)
Port Of Seattle petition for judicial review filed in Superior Court of Washington, Thurston County, challenging the Pollution Control Hearings Board (PCHB) Order Granting Motion to Stay the Effectiveness of Section 401 Certification related to the proposed third runway at Seattle-Tacoma International Airport (STIA). Petitioner Port Of Seattle represented by Linda J. Strout, Traci M. -
2001-12-28
EXH AR024306: ACC Review Letter — Nov 2001 NRMP Wetland Mitigation Inadequacies, STIA Third Runway
A December 2001 letter from Azous Environmental Sciences challenges the Port of Seattle's wetland mitigation plan for the SeaTac Third Runway construction project, arguing that the plan inadequately offsets environmental damage to wetlands and streams. The letter contends that the Port has misclassified wetland 'enhancement' work at Vacca Farm as 'restoration,' inflating mitigation credits, and that the overall plan fails to meet no-net-loss standards required under Army Corps of Engineers regulations. -
2001-12-28
EXH AR027061: Ecology Acknowledgment of Waste Discharge Permit Application WA-002465-1 and Port Of Seattle NPDES Permit Renewal Submission for Sea-Tac Airport
AR027061. Two letters dated December 2001 regarding NPDES Permit WA-002465-1 for Seattle-Tacoma International Airport. First: Washington Department of Ecology (Tricia Miller, Permit Coordinator, Northwest Regional Office) acknowledges receipt of a waste discharge permit application from Michael Feldman, Director of Aviation Facilities, Port Of Seattle, received December 21, 2001; contact Ed Abbasi at (425) 649-7227. Second -
2001-12-27
Exhibit 2049: Port Of Seattle Construction Stormwater Monitoring Report Letter — STIA Water Quality Certification No. 1996-4-02325
Letter dated December 27, 2001 from Keith R. Smith, Water Resources Manager at Port Of Seattle Seattle-Tacoma International Airport, to Ms. Ann Kenny at Washington State Department of Ecology (Bellevue, WA 98088-5452), transmitting construction stormwater monitoring reports for September, October, and November 2001 under Section K.6 of Water Quality Certification No. 1996-4-02325 (Amended-1) and NPDES -
2001-12-26
EXH 295: ACC Interrogatories Nos. 1-19 and Requests for Production Nos. 1-6; Objections and Responses
The Port of Seattle submitted formal objections and responses to interrogatories filed by the Airport Communities Coalition (ACC) before Washington State's Pollution Control Hearings Board, related to a legal dispute over the Port's Third Runway Project. The case centered on the Department of Ecology's water quality certification issued under federal Clean Water Act Section 401. The document outlines the legal procedures governing the exchange of information between the parties during the hearing process. -
2001-12-26
Exhibit 196: ACC’s Interrogatories Nos. 1-19 and Requests for Production Nos. 1-6 to Port Of Seattle and Port Of Seattle’s Objections and Responses Thereto
This legal document contains the Port of Seattle's responses to interrogatories filed by the Airport Communities Coalition (ACC) before Washington State's Pollution Control Hearings Board. The Port identifies expert witnesses expected to testify on topics including contaminated site cleanup, stormwater quality, wetland mitigation, and environmental review under SEPA and NEPA for Sea-Tac Airport's Master Plan Update projects. The document outlines each expert's anticipated testimony and the basis for their opinions in connection with Clean Water Act permit requirements. -
2001-12-26
EXH 407: ACC Interrogatories Nos. 1-19 and Requests for Production Nos. 1-6; Objections and Responses
This document contains the Port of Seattle's formal objections and responses to interrogatories and requests for production filed by the Airport Communities Coalition (ACC) before Washington State's Pollution Control Hearings Board (Case No. 01-160). The Port identifies over a dozen expert witnesses it intends to call, including specialists in geotechnical engineering, toxicology, hydrology, and groundwater science from firms such as Parametrix, Inc., Hart Crowser, and ENSR Toxicology. The case centers on environmental and pollution concerns related to Sea-Tac Airport operations. -
2001-12-21
EXH AR025100: Deposition Edward O’Brien — ACC v. Ecology & Port, PCHB No. 01-133
This document is a deposition of Edward O'Brien, taken on December 21, 2001, as part of a Pollution Control Hearings Board case in Washington State involving the Airport Communities Coalition challenging the Department of Ecology and the Port of Seattle. O'Brien discusses stormwater management techniques, including infiltration facilities, which can be used to treat stormwater quality and mitigate low-flow impacts on surface water systems connected to groundwater. He explains that while infiltration can delay and filter stormwater flows through soil profiles, precise control over timing and flow rates is limited and depends on site-specific soil and hydrological conditions. -
2001-12-20
Exhibit 40: Declaration of Kelly Whiting, PCHB No. 01-133, ACC v. Ecology and Port Of Seattle
Declaration of Kelly Whiting, Senior Engineer at King County Department of Natural Resources, filed before the Pollution Control Hearings Board (PCHB No. 01-133) in Airport Communities Coalition v. State of Washington Department of Ecology and Port Of Seattle. Whiting reviewed the Port Of Seattle’s Comprehensive Stormwater Management Plan (SMP) for Master Plan Update Improvements at