2000-09-27
EXH AR017920: Ecology Draft Letter to Port Of Seattle on 401 Water Quality Certification Withdrawal and Reapplication Process — Third Runway
Attorney-client privileged deliberative document dated September 27, 2000, from Gordon White (Washington Department of Ecology, Shorelands and Environmental Assistance Program) to Tom Luster, Raymond Hellwig, Kevin Fitzpatrick, Joan Marchioro (ATG), and Erik Stockdale. Transmits draft letter to M.R. (Mic) Dinsmore, Executive Director, Port Of Seattle, regarding 401 Water Quality Certification review for the Third Runway -
2000-09-15
Exhibit AR026129: King County Letter to Washington State Department of Ecology Regarding Port Of Seattle Comprehensive Stormwater Management Plan Review
Letter dated September 15, 2000 from Pam Bissonnette, King County Department of Natural Resources, to Tom Luster at Washington State Department of Ecology Shorelands & Environmental Assistance Program. Reviews Port Of Seattle Comprehensive Stormwater Management Plan (SMP) for Master Plan Update Improvements at Sea-Tac Airport against the 1998 King County Surface Water Design Manual. Addresses -
2000-09-12
EXH AR045977: Evaluation of Perched Zone Interception and Possible Impacts to Wetland Hydrology, Borrow Area 3, Sea-Tac Third Runway
Hart Crowser report prepared for Port of Seattle, dated September 12, 2000 (J-4978-13), evaluating perched groundwater zone interception at Borrow Area 3 for the Sea-Tac Third Runway project. Analyzes shallow perched groundwater flow from northwest to southeast beneath Borrow Areas 3 and 4, its role in sustaining Wetland 29, and the impact of borrow area -
2000-09-11
EXH AR017488: Internal Email — Clean Fill Criteria Language for 401 Water Quality Certification on Sea-Tac Third Runway
Internal email exchange between Peter Kmet and Kevin Fitzpatrick (Supervisor, Industrial Permit Unit, Water Quality Program, NWRO) dated September 11, 2000, regarding Clean Fill Criteria language for the 401 Water Quality Certification on the Sea-Tac Third Runway project. Document marked ‘Deliberative Document Currently Exempt From Public Disclosure.’ Kmet comments on draft certification conditions E6 (borrow -
2000-09-07
Exhibit 138: Smith & Lowney Letter to Ecology Regarding Port Of Seattle NPDES Permit Violations and Third Runway Water Quality Certification
Fax cover sheet and two-page letter dated September 7, 2000 from Richard A. Poulin of Smith & Lowney, P.L.L.C. to Raymond Hellwig (Director, NW Regional Office, Washington Department of Ecology) and Tom Luster (Permit Coordination Unit, Ecology), on behalf of Citizens Against Seatac Expansion (CASE) and Waste Action Project (WAP). Letter transmits a 60-day Notice -
2000-09-05
EXH AR045793: Technical Memorandum — CWA 401 Issues for Master Plan Update Projects, Port Of Seattle (Sea-Tac Airport)
Technical memorandum dated September 5, 2000 from Elizabeth Leavitt (Port Of Seattle) to Ray Helwig (Washington State Department of Ecology), cc’d to Erik Stockdale, Nancy Groves (Ecology), Jim Kelley and Paul Fendt (Parametrix), Project No. 556-2912-001(03). Addresses CWA Section 401 permit issues for Seattle-Tacoma International Airport Master Plan Update projects involving wetlands and streams. Topics -
2000-09-01
EXH AR028056: Port Of Seattle Sea-Tac International Airport Reinforced Earth Design Calculations
Reinforced Earth Company (job number 8079, designer MJB, dated 09/01/00) design calculations for Port Of Seattle Sea-Tac International Airport, West Wall 181+25. Document covers internal and external stability analysis for a Mechanically Stabilized Earth (MSE) retaining wall structure including design parameters (select backfill φ=37°, γ=0.140 kcf, Ka=0.24858; random backfill φ=35°, γ=0.140 kcf, Ka=0.27269; foundation φ=35°, -
2000-08-18
EXH AR027600: Port Of Seattle Letter to Seattle Public Utilities Regarding Des Moines Creek Basin Plan Flow Augmentation Facility
Letter dated August 18, 2000 from Keith R. Smith, Water Resources Manager at Port Of Seattle (Seattle-Tacoma International Airport), to Jillian Hoyt of Seattle Public Utilities, regarding the Des Moines Creek Basin Plan Flow Augmentation Facility. The Port seeks to purchase water from SPU as an alternate supply for the proposed flow augmentation facility, which -
2000-08-14
Exhibit 725: Memorandum on Critical Condition for WER-Related Sampling, Port Of Seattle Third Runway Stormwater Discharge into Miller Creek
Memorandum from Brian Pippin (Parametrix, Inc.) to Linda Logan (cc: John Brooker), dated August 14, 2000, Project Number 556-2912-001, Port of Seattle WERs. Discusses critical conditions for Water Effect Ratio (WER) sampling per the Permit Writers Manual for the third runway treated stormwater discharge into Miller Creek. Uses HSPF hindcasting over 49-year period to evaluate -
2000-08-11
Exhibit 2066: Port Of Seattle Facsimile — Auburn Wetland Shoreline Permit Exemption Letter
Facsimile cover sheet from Elizabeth Leavitt, Manager, Aviation Environmental Programs, Port Of Seattle, transmitting a 7-page package to Tom Luster (Ecology) and Eric Stockdale (NWRO) regarding the Auburn HPAD and shoreline exemptions. Includes August 9, 2000 letter from City of Auburn Planning Director Paul Krauss to Elizabeth Leavitt and Robert J. Fritzen (Department of Ecology,